I recently connected with Andrew Williams, CEO of New Pacific Metals (TSX-V:NUAG) (NYSE:NEWP).
The company has been very busy, with 2024 being a year of multiple milestones.
We can expect a Preliminary Feasibility Study on the flagship Silver Sand Project by mid-year, as well as progress towards obtaining an Environmental Impact Assessment Study, and the signing of a mining production contract.
The Carangas Project, their second major discovery, is a high-tonnage silver polymetallic Project that will see a Preliminary Economic Assessment by mid-year.
Watch the video to find out more about the exciting news flow to come from New Pacific, as their two main projects advance towards production.
Courtesy of the Silver Stock Investor
Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 ... READ MORE
Silver One Resources Inc. (TSX-V: SVE) (OTCQX: SLVRF) (FSE: BRK1)... READ MORE
Exceptional grades of Titanium, Vanadium and Iron in all 15 drill... READ MORE
Intersection is within 33 metres from surface and contained in a ... READ MORE
Further production growth to one million ounces annually expected... READ MORE