I recently connected with Andrew Williams, CEO of New Pacific Metals (TSX-V:NUAG) (NYSE:NEWP).
The company has been very busy, with 2024 being a year of multiple milestones.
We can expect a Preliminary Feasibility Study on the flagship Silver Sand Project by mid-year, as well as progress towards obtaining an Environmental Impact Assessment Study, and the signing of a mining production contract.
The Carangas Project, their second major discovery, is a high-tonnage silver polymetallic Project that will see a Preliminary Economic Assessment by mid-year.
Watch the video to find out more about the exciting news flow to come from New Pacific, as their two main projects advance towards production.
Courtesy of the Silver Stock Investor
Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is... READ MORE
First Phosphate Corp. (CSE: PHOS) (OTCQX: FRSPF) (FSE: KD0) is... READ MORE
GFG Resources Inc. (TSX-V: GFG) (OTCQB: GFGSF) announces that i... READ MORE
Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF)... READ MORE
Highlights: Gold bar weighing 2.64 kilograms (85 oz) poured in th... READ MORE