The Prospector News

Peter Gadsdon – “Blencowe Resources Announce Strong PFS on Fully Permitted Graphite Project” (Video)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Peter Gadsdon – “Blencowe Resources Announce Strong PFS on Fully Permitted Graphite Project” (Video)

 

 

 

 

 

Blencowe Resources (LON:BRES) is focused on fast tracking the development of its high quality, permitted, jumbo flake graphite project in Uganda The Orom Cross project hosts 2 – 3 billion tonnes of graphite near to surface, with first 20 years’ mine life already drilled to JORC standard. Recent metallurgical test work shows the graphite can be processed to a high battery grade quality of 97% – 98% TGC concentrate.

 

Mr Ralston is a Chartered Accountant with 25 years’ experience successfully developing businesses worldwide, including several in Africa where he has considerable expertise. He has been a senior executive and board member for several junior listed resource companies over the past 17 years and he has raised over A$300m in debt and equity over that period. He brings a wealth of corporate and management experience and he has been involved in developing at least three mining companies from start-up through to production. Mr Ralston was previously MD of Balamara Resources Ltd, which developed two large scale coal projects in Poland, and before that CFO of Kangaroo Resources Ltd, which developed several coal projects in Indonesia into production, before trade sale to a major Indonesian coal producer for A$600m in 2010. Mr Ralston is currently Non-Executive Chairman of ASX listed Trigg Mining Limited.

 

https://blencoweresourcesplc.com/

Posted July 19, 2022

Share this news article

MORE or "UNCATEGORIZED"


Cartier announces updated PEA for the Cadillac Project: After-tax NPV5% of C$1.0 billion and after-tax IRR of 26.6% at US$3,600/oz gold price

Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) (OTCQB: ECRFF) is pleased to announce the results of... READ MORE

September 17, 2026

Oreterra Wraps up Phase 1 Drilling at Trek South with Visible Copper Minerals and Broad Intercepts of Porphyry-Style Alteration Above Postulated Intrusion; Planning for 2027 Phase 2 Underway, Assays Pending

Oreterra Metals Corp. (TSX-V: OTMC) (OTCQB: OTMCF) (FSE: D4R0) (WKN: A421RQ) is pleased to report t... READ MORE

September 17, 2026

NevGold Intercepts 1.06 g/t Oxide Au Over 42.7 Meters Outside of 2026 MRE Pit-shell; Mineralization Also Expanded Inside Pit-Shell With 5.00 g/t Oxide Au Over 3.0 Meters Within 1.23 g/t Oxide Au Over 27.4 Meters at Limo Butte, Nevada

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce additional oxide-gol... READ MORE

September 17, 2026

Thunder Gold Reports 121.5 metres Averaging 0.376 g/t Au in New Target Located 200 metres East of Current Resource Pit Optimization Limit

Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is pleased to announce exploration diam... READ MORE

September 17, 2026

Nuvau Intersects 17.37 g/t over 2.40 m, Extending Gold Mineralization 50 Metres from High-Grade Thundermine Intercept

Nuvau Minerals Inc. (TSX-V: NMC) is pleased to report additional assay results from its 2026 summer... READ MORE

September 17, 2026

Copyright 2026 The Prospector News