
P2 Gold Inc. (TSX-V: PGLD) (OTCQB: PGLDF) reports it has filed a National Instrument 43-101 Standards of Disclosure for Mineral Projects technical report entitled “NI 43-101 Technical Report, Preliminary Economic Assessment, Gabbs Heap Leach and Mill Project, Nye County, Nevada, USA”, with an effective date of May 17, 2024. The Gabbs Technical Report is available under the Company’s profile on SEDAR at www.sedar.com and on the Company’s website at www.p2gold.com.
The Gabbs Technical Report was prepared by Carl E. Defilippi, RM, SME of Kappes, Cassiday & Associates of Reno Nevada, Eugene Puritch, P.Eng., FEC, CET, Andrew Bradfield, P.Eng., William Stone, Ph.D., P.Geo., Jarita Barry, P.Geo. and David Burga, P.Geo. of P&E Mining Consultants Inc. of Brampton, Ontario and Douglas Willis, CPG of Welsh Hagen Associates of Reno Nevada, each of whom is a “Qualified Person” as defined by NI 43-101 and independent of the Company.
About P2 Gold Inc.
P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada. A positive preliminary economic assessment has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces gold and 13,500 tonnes copper over a 14.2 year mine life.
Eloro Resources Ltd. (TSX: ELO) (FSE: P2QM) is pleased to announce the closing of its previously an... READ MORE
Minera Alamos Inc. (TSX-V: MAI) (OTCQX: MAIFF) is pleased to announce updated Mineral Resource and M... READ MORE
Ero Copper Corp. (TSX: ERO) (NYSE: ERO) is pleased to announce its operating and financial results f... READ MORE
Rare Element Resources Ltd. (OTCQB: REEMF) is pleased to report that its previously announced... READ MORE
TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) is pleased to announce preliminary resu... READ MORE