The Prospector News

P2 Gold Files Gabbs PEA Technical Report

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

P2 Gold Files Gabbs PEA Technical Report

 

 

 

 

 

P2 Gold Inc. (TSX-V: PGLD) (OTCQB: PGLDF) reports it has filed a National Instrument 43-101 Standards of Disclosure for Mineral Projects technical report entitled “NI 43-101 Technical Report, Preliminary Economic Assessment, Gabbs Heap Leach and Mill Project, Nye County, Nevada, USA”, with an effective date of May 17, 2024. The Gabbs Technical Report is available under the Company’s profile on SEDAR at www.sedar.com and on the Company’s website at www.p2gold.com.

 

The Gabbs Technical Report was prepared by Carl E. Defilippi, RM, SME of Kappes, Cassiday & Associates of Reno Nevada, Eugene Puritch, P.Eng., FEC, CET, Andrew Bradfield, P.Eng., William Stone, Ph.D., P.Geo., Jarita Barry, P.Geo. and David Burga, P.Geo. of P&E Mining Consultants Inc. of Brampton, Ontario and Douglas Willis, CPG of Welsh Hagen Associates of Reno Nevada, each of whom is a “Qualified Person” as defined by NI 43-101 and independent of the Company.

 

About P2 Gold Inc.

 

P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada. A positive preliminary economic assessment has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces gold and 13,500 tonnes copper over a 14.2 year mine life.

 

Posted July 4, 2024

Share this news article

MORE or "UNCATEGORIZED"


Tectonic Metals Drills 2.41 g/t Au Over 59.44 Metres, Including 11.82 g/t Au Over 10.67 Metres and 39.96 g/t Au Over 3.05 Metres at Alpha Bowl, Flat Gold Project, Alaska

Broad Gold Mineralization Starts at Surface, Returning 1.86 g/t A... READ MORE

October 15, 2026

Lithium Africa Intersects 8.0 m at 1.70% Li2O, including 4.0 m at 2.59% Li2O, Extending High-Grade Mineralization at Norrabees I

Lithium Africa Corp. (TSX-V: LAF) (FSE: 6MQ) (OTCQB: LTAFF) is pl... READ MORE

October 15, 2026

Tower Intersects 20.3 m of 3.13 g/t Au, Including 8.0 m of 7.16 g/t Au, at Rabbit North's Blue Sky Zone

Drilling also returns 134.0 m of 0.65 g/t Au in the Lower Domain;... READ MORE

October 15, 2026

Copper Road Signs Exploration Agreement with the Matachewan First Nation on the Ben Nevis Volcanic Complex Project

Copper Road Resources Inc. (TSX-V: CRD) is pleased to announce th... READ MORE

October 15, 2026

Brunswick Exploration Announces 302 Metre-Wide Spodumene-Bearing Pegmatite Interval at the Anatacau Main Project

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFUR... READ MORE

October 15, 2026

Copyright 2026 The Prospector News