The Prospector News

P2 Gold Files Gabbs PEA Technical Report

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

P2 Gold Files Gabbs PEA Technical Report

 

 

 

 

 

P2 Gold Inc. (TSX-V: PGLD) (OTCQB: PGLDF) reports it has filed a National Instrument 43-101 Standards of Disclosure for Mineral Projects technical report entitled “NI 43-101 Technical Report, Preliminary Economic Assessment, Gabbs Heap Leach and Mill Project, Nye County, Nevada, USA”, with an effective date of May 17, 2024. The Gabbs Technical Report is available under the Company’s profile on SEDAR at www.sedar.com and on the Company’s website at www.p2gold.com.

 

The Gabbs Technical Report was prepared by Carl E. Defilippi, RM, SME of Kappes, Cassiday & Associates of Reno Nevada, Eugene Puritch, P.Eng., FEC, CET, Andrew Bradfield, P.Eng., William Stone, Ph.D., P.Geo., Jarita Barry, P.Geo. and David Burga, P.Geo. of P&E Mining Consultants Inc. of Brampton, Ontario and Douglas Willis, CPG of Welsh Hagen Associates of Reno Nevada, each of whom is a “Qualified Person” as defined by NI 43-101 and independent of the Company.

 

About P2 Gold Inc.

 

P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada. A positive preliminary economic assessment has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces gold and 13,500 tonnes copper over a 14.2 year mine life.

 

Posted July 4, 2024

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News