
P2 Gold Inc. (TSX-V: PGLD) (OTCQB: PGLDF) reports it has filed a National Instrument 43-101 Standards of Disclosure for Mineral Projects technical report entitled “NI 43-101 Technical Report, Preliminary Economic Assessment, Gabbs Heap Leach and Mill Project, Nye County, Nevada, USA”, with an effective date of May 17, 2024. The Gabbs Technical Report is available under the Company’s profile on SEDAR at www.sedar.com and on the Company’s website at www.p2gold.com.
The Gabbs Technical Report was prepared by Carl E. Defilippi, RM, SME of Kappes, Cassiday & Associates of Reno Nevada, Eugene Puritch, P.Eng., FEC, CET, Andrew Bradfield, P.Eng., William Stone, Ph.D., P.Geo., Jarita Barry, P.Geo. and David Burga, P.Geo. of P&E Mining Consultants Inc. of Brampton, Ontario and Douglas Willis, CPG of Welsh Hagen Associates of Reno Nevada, each of whom is a “Qualified Person” as defined by NI 43-101 and independent of the Company.
About P2 Gold Inc.
P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada. A positive preliminary economic assessment has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces gold and 13,500 tonnes copper over a 14.2 year mine life.
Cassiar Gold Corp. (TSX-V: GLDC) (OTCQX: CGLCF) is pleased to announce that, further to its news rel... READ MORE
Midland Exploration Inc. (TSX-V: MD) is pleased to announce that it has completed a second and fina... READ MORE
Wallbridge Mining Company Limited (TSX: WM) (OTCQB:WLBMF) is pleased to announce that it has closed... READ MORE
GR Silver Mining Ltd. (TSX-V: GRSL) (OTCQX: GRSLF) (FRANKFURT: GPE) is pleased to announce outstandi... READ MORE
McEwen Inc. (NYSE: MUX) (TSX: MUX) today announced that it has received a $49.4 million dividend fr... READ MORE