The Prospector News

Otso Gold Drilling Program Exceeds Expectations

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Otso Gold Drilling Program Exceeds Expectations

 

 

 

 

 

Otso Gold Corp (TSX-V:OTSO) is pleased to announce the following update on its drilling program.

Further to the announcement on May 17 ,2021, the drilling campaign continues to deliver exciting results, exceeding the Company’s expectations, including:

 

  1. LV21027 5.45 m @ 7.17 g/t Au starting at 37.85 m
  2. LV21027 3.68 m @ 2.32 g/t Au starting at 50.65 m
  3. LV21001 18.47 m @ 1.69 g/t Au starting at 28.90 m
  4. LV21001 3.42 m @ 1.34 g/t Au starting at 63.58 m
  5. LV21003 1.65 m @ 1.20 g/t Au starting at 67.95 m
  6. LV21009 2.13 m @ 1.37 g/t Au starting at 72.45 m
  7. LV21015 6.30 m @ 1.78 g/t Au starting at 18.50 m
  8. LV21003 1.65 m @ 1.20 g/t Au starting at 67.95 m
  9. LV21017 2.55 m @ 1.81 g/t Au starting at 37.95 m
  10. LV21019 1.70 m @ 1.27 g/t Au starting at 24.40 m
  11. LV21024 1.40 m @1.17 g/t Au starting at 28.20 m

 

All results are all from drill holes within 500m of the existing pits in line with the Company’s plan to restart production in Q3 2021 by extending the foot prints of the North and South Pits by focusing initial mining on the pit extensions. Figure 1, below, demonstrates the progress of the drilling program.

As previously announced, the results from the Phase Two drilling campaign will inform the John T. Boyd authored NI 43-101 Technical Report and inital mine plan of ~3Mt expected to be published in June 2021 in advance of the restart of production in Q3 2021.

Figure 1

 

The pit extensions include the New Hope area which had been partially cleared of overburden to investigate geochemical anomalies in the area. The Company expects to release assay results on this area shortly; however, logging of the core and previous channel samples suggest on surface extensions of the mineralization, that is, mineralized shear zones and sulphide-bearing quartz veins with the same style of deformation and mineralization characterising the deposit. The Company will be focusing part of the Phase Two drill program on testing the continuity of mineralization in the area. The Company notes this area was not included in the Company’s previous resources.

 

The core is analysed using cyanide leach with AA finish. Fire assays are used for comparative analysis to CN soluble determinarions. Overall, CN soluble gold represents approximarely 95% of total contained gold for this deposit demonstrating the conservative nature of the results, presented below:

Area- 
(Central Zone)

 

 

Area- 
(Eastern Zone)

 

 

 Significant drill intercepts, defined as any mineralization of 1 metre lengths or longer, are presented in the tables above. 

 

The technical disclosure in this news release has been reviewed and approved by Gregory B. Sparks P.Eng, a Qualified Person as defined by National Instrument 43-101.

 

About Otso Gold Corp 

 

Otso Gold Corp. wholly owns the Otso Gold Mine near the town of Raahe in Finland. The Otso Gold Mine is fully built, fully permitted, has all infrastructure in place, two open pits and is progressing towards a restart at 2 million tonnes per annum throughput.

Posted June 1, 2021

Share this news article

MORE or "UNCATEGORIZED"


Provenance Gold Announces and Closes Substantially Oversubscribed $1.5 Million Private Placement

Provenance Gold Corp. (CSE: PAU) (OTCQB: PVGDF) is pleased to ann... READ MORE

October 22, 2021

Omai Drilling Continues to Outline Gold Mineralization in Multiple Shears Extending Below the Wenot Pit, including 16.8 g/t over 6 metres and 4.6 g/t over 20 metres

Omai Gold Mines Corp. (TSX-V: OMG) is pleased to report additiona... READ MORE

October 22, 2021

Emerita Intersects 8.2 Meters Grading 2.5% Copper, 17.3% Zinc, 8.7% Lead, 223.5g/t Silver, 0.5g/t Gold in Initial Step-Out Drill Hole at La Infanta Drill Program

Emerita Resources Corp. (TSX – V: EMO) (OTC: EMOTF) announces ... READ MORE

October 22, 2021

Aurania Resources Announces Closing of $2.26 Million Concurrent Private Placement

Aurania Resources Ltd. (TSX-V: ARU) (FSE: 20Q) announces that it ... READ MORE

October 22, 2021

Bonterra Announces Closing of $11.66 Million Private Placement

Bonterra Resources Inc. (TSX-V: BTR) (OTCQX: BONXF) (FSE: 9BR2) i... READ MORE

October 22, 2021

We acknowledge the [financial] support of the Government of Canada.

Government of Canada Supported
Copyright 2021 The Prospector News