Osisko Metals Incorporated (TSX-V: OM) (FRANKFURT: 0B51) is pleased to announce assay results from 14 drill holes completed at the M-40 deposit at the west end of the East Mill Zone in the Pine Point Mining Camp. Drill hole M40-18-PP-021 intersected 5.04% Zinc and 1.39% Lead over 11.16 metres and hole M40-18-PP-008 intersected 8.73% Zinc and 3.77% Lead over 3.85 metres.

 

 

All intersections are within a flat lying tabular-style deposit known as M-40 and all intercepts are located above 45 metre depths. (See 2018 Summer Drill Campaign East Mill Zone M-40).

 

 

The historical M-40 deposit currently measures 750 metres in strike length with an average mineralized width of approximately 340 metres. It occurs within the East Mill Zone and is located 1.4 kilometres south of the electrical sub-station along a main haul road. The M-40 deposit was mined underground by Cominco and produced 350,870 tonnes of 5.5% Zinc and 2.2% Lead.  Cominco Ltd. lists remaining unclassified historic resources of 1.76 million tonnes of 5.4% Zinc and 1.2% Lead at M-40 (not NI43-101 compliant).  The East Mill Zone hosts eight deposits containing unclassified historical resources reported by Cominco Ltd. (1988) occurring over 7.6 kilometres. They are located to the east of the electrical substation and adjacent to the main haulage road along its entire length. Additional highlights are listed below in Table 1 and details are provided in Tables 2 & 3.

 

 

Table 1: Selected Drill Highlights

 

 

Hole Name Area Historical Deposit From To Width Zinc Lead Zinc + Lead
    (metres) (metres) (metres) % % %
M40-18-PP-008 East Mill M-40 27.75 31.60 3.85 8.73 3.77 12.50
M40-18-PP-013 East Mill M-40 23.47 28.32 4.85 3.85 2.24 6.09
M40-18-PP-019 East Mill M-40 41.59 47.16 5.57 4.67 0.99 5.67
M40-18-PP-021 East Mill M-40 33.93 45.09 11.16 5.04 1.39 6.43

 

 

The objective of the 2018 drill program is to upgrade approximately 50 million tonnes of unclassified near-surface historical resources within known deposits (Cominco Ltd.) to NI43-101 Inferred Mineral Resources as quickly as possible in areas amenable to open pit mining. This will then be used as a resource base for future economic studies.

 

 

The 2018 drill program consists of approximately 700 drill holes within the Main Trend, a 20-kilometre long, portion of the PPMC that is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure and paved highway access and with 100km of haulage roads already in place.

 

 

Note regarding historical resource and Qualified Person

 

 

The above-mentioned historical resources do not conform to National Instrument 43-101 standards. The Company is reporting the historical estimates for reference purposes only. Neither Osisko Metals nor its consultants have completed sufficient work to verify the historical estimates and these should not be relied upon for investment purposes. A Qualified Person has not done sufficient work to classify the historical estimates as NI43-101 compliant mineral resources and there is no guarantee that such work will allow conversion of such historical resources.

 

 

Stanley G. Clemmer, P. Geo registered in the Northwest Territories and is Chief Geologist for Pine Point Mining Limited, a wholly owned subsidiary of Osisko Metals Limited. He is the Qualified Person responsible for the technical data reported in this news release.

 

 

Quality Assurance / Quality Control

 

 

Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core handling, sampling, transportation of samples and lab analyses. Drill core samples from the Pine Point project area were securely transported to its core facility in Hay River, Northwest Territories where they were logged and sampled. Samples selected for assay were shipped via secure transportation to the ALS Canada Ltd.’s preparation facility in Yellowknife. Pulps were analyzed at the ALS Canada Ltd. facility in North Vancouver, British Columbia. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for ultra-trace level detection for a multi-element suite with a 1% upper detection limit for base metals.  Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade four acid digestion and ICP-AES analysis with an upper detection limit of 30% and 20% respectively.  Samples reporting Zn >30% and or Pb >20% are analyzed by traditional titration.

 

 

Table 2: Composite Assay Results

 

 

Hole Name Historical Deposit From To Drilled Width True Width Zinc Lead Zinc +
Lead
  (metres) (metres) (metres) (metres) % % %
M40-18-PP-003 M-40 32.74 42.29 9.55 9.55 2.36 0.69 3.05
M40-18-PP-003 M-40 43.79 45.29 1.50 1.50 1.13 0.12 1.25
M40-18-PP-003 M-40 49.79 54.91 5.12 5.12 1.91 0.44 2.35
M40-18-PP-004 M-40 No significant Values
M40-18-PP-005 M-40 41.96 42.24 0.28 0.28 1.30 0.05 1.35
M40-18-PP-006 M-40 No significant Values
M40-18-PP-008 M-40 27.75 31.60 3.85 3.85 8.73 3.77 12.50
M40-18-PP-008 M-40 35.71 38.65 2.94 2.94 1.97 0.25 2.22
M40-18-PP-011 M-40 39.51 39.81 0.30 0.30 5.37 0.16 5.53
M40-18-PP-011 M-40 44.43 45.82 1.39 1.39 1.94 0.91 2.85
M40-18-PP-011 M-40 49.54 51.11 1.57 1.57 2.08 0.04 2.12
M40-18-PP-012 M-40 35.26 39.20 3.94 3.94 4.02 0.58 4.60
M40-18-PP-012 M-40 41.61 45.05 3.44 3.44 1.61 0.11 1.71
M40-18-PP-013 M-40 23.47 28.32 4.85 4.85 3.85 2.24 6.09
M40-18-PP-016 M-40 No significant Values
M40-18-PP-018 M-40 38.71 41.00 2.29 2.29 9.06 1.70 10.76
M40-18-PP-019 M-40 41.59 47.16 5.57 5.57 4.67 0.99 5.67
M40-18-PP-020 M-40 No significant Values
M40-18-PP-021 M-40 33.93 45.09 11.16 11.16 5.04 1.39 6.43
M40-18-PP-032 M-40 42.86 43.86 1.00 1.00 6.77 0.88 7.65

 

 

Table 3: Drill hole collar locations (UTM NAD83 zone 11)

 

 

Hole Name Area Deposit Easting Northing Elevation Azimuth Dip Depth (metres)
M40-18-PP-003 East Mill M-40 639795.4 6749583.7 224.34 0 -90 59.74
M40-18-PP-004 East Mill M-40 639755.5 6749584.5 224.22 0 -90 59.74
M40-18-PP-005 East Mill M-40 639729.4 6749572.7 224.04 0 -90 56.69
M40-18-PP-006 East Mill M-40 639701.4 6749564.7 223.91 0 -90 59.74
M40-18-PP-008 East Mill M-40 639649.6 6749608.2 224.00 0 -90 50.60
M40-18-PP-011 East Mill M-40 639827.5 6749576.5 224.13 0 -90 57.00
M40-18-PP-012 East Mill M-40 639833.2 6749603.2 223.81 0 -90 57.00
M40-18-PP-013 East Mill M-40 639810.3 6749616.8 223.75 0 -90 60.05
M40-18-PP-016 East Mill M-40 639880.5 6749590.2 223.14 0 -90 57.00
M40-18-PP-018 East Mill M-40 639830.3 6749546.6 223.66 0 -90 59.00
M40-18-PP-019 East Mill M-40 639854.8 6749513.8 222.67 0 -90 60.05
M40-18-PP-020 East Mill M-40 639867.1 6749486.4 222.22 0 -90 60.05
M40-18-PP-021 East Mill M-40 639769.3 6749558.6 222.00 0 -90 56.69
M40-18-PP-032 East Mill M-40 639897.1 6749497.5 221.85 0 -90 60.05

 

 

About Osisko Metals

 

 

Osisko Metals is a Canadian exploration and development company creating value in the base metal space with a focus on zinc mineral assets. The Company controls Canada’s two premier historical zinc mining camps, namely the Pine Point Mining Camp located in the Northwest Territories (22,000 ha) and the Bathurst Mining Camp, located in northern New Brunswick (63,000 ha). The Company is currently drilling in both camps for a combined total 100,000 metre drill program.  The focus of these programs is to upgrade historical resources to NI43-101 standards and also to pursue exploration around historical deposits. Brownfield exploration includes innovative 3D compilation techniques, updated geological interpretation, and modern geophysics. In Québec, the Company owns 42,000 hectares that cover 12 grass-root zinc targets that will be selectively advanced through exploration. In parallel, Osisko Metals is monitoring several base metal-oriented peers for opportunities.  

 

Posted October 22, 2018

Share this news article

MORE or "UNCATEGORIZED"


JUGGERNAUT CLOSES FINANCING WITH CRESCAT CAPITAL AS LEAD INVESTOR FOR 19.97%

PLANS FOLLOW UP DRILLING ON EXTENSIVE HIGH-GRADE COPPER-GOLD TARG... READ MORE

May 13, 2024

KARORA REPORTS RECORD REVENUE AND STRONG CASH FLOW FOR Q1 2024

Karora Resources Inc. (TSX: KRR) announced financial and operatin... READ MORE

May 13, 2024

OceanaGold Completes IPO, Raises US$106M for the Sale of 20% Interest in OGPI

OceanaGold Corporation (TSX: OGC) (OTCQX: OCANF) is pleased to an... READ MORE

May 13, 2024

Drilling Continues to Expand Gold Resource at OKO

G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to provi... READ MORE

May 13, 2024

CANTEX INTERSECTS UP TO 25.07% LEAD-ZINC WITH 72g/t SILVER AT ITS 100% OWNED NORTH RACKLA PROJECT, YUKON AND WILL COMMENCE DRILLING ITS COPPER PROJECT WHERE PREVIOUS DRILLING INTERSECTED 2.5m OF 3.93% COPPER

Cantex Mine Development Corp. (TSX-V: CD) (OTCQB: CTXDF) provides... READ MORE

May 13, 2024

Copyright 2024 The Prospector News