Osisko Metals Incorporated (TSX-V: OM) (OTCQX: OMZNF) (FRANKFURT: 0B51) is pleased to announce an updated Mineral Resource Estimate at Copper Mountain as part of the Gaspé Copper Project, located near Murdochville in the Gaspé Peninsula of Quebec.
The updated MRE (see Table 1 below) comprises an open-pit Indicated Resource of 495 million tonnes grading 0.37% CuEq, representing a 30% increase in copper-equivalent metal content over the previously reported copper-only Inferred Resource (see April 28, 2022 press release), as well as greater than 99% conversion rate from Inferred to Indicated category.
At 3.25 billion pounds (1.47 million tonnes) of contained copper, not including significant molybdenum (180 million pounds) and silver (28 million ounces) resources (see Table 1 below), the Copper Mountain in-pit Indicated Resource hosts the largest undeveloped copper asset in Eastern North America.
Other improvements in the updated MRE include a 38% reduction of the strip ratio (now estimated at 1.23) from the estimate in the previously reported Inferred Resource, based on the mineralization geometry that surrounds the former open pit mine.
Robert Wares, CEO & Chairman of the Board, commented: “We are extremely pleased with the results of the updated Mineral Resource Estimate for the Copper Mountain Deposit. The overall copper resource has increased since we announced the maiden resource estimate in 2022 with significant molybdenum and silver credits now included in the estimate. Integrating the recently-announced positive metallurgical testing results, the Gaspé Copper Project is showing excellent potential towards becoming a key Canadian copper-molybdenum producer, located in one of the world’s safest mining jurisdictions.”
Mr. Wares continued: “This MRE will provide the basis for a Preliminary Economic Assessment, scheduled to be released in early Q1 2025 in the context of what we believe is the start of a strong long-term copper market. Furthermore, we strongly believe that this important asset could become a core component of Quebec’s critical mineral development strategy that aims to provide essential metals for global decarbonization initiatives.”
Table 1: Mineral Resource Estimate (MRE) Base Case
Class | Tonnes | Cu Eq | Cu | Mo | Ag | Cu | Cu | Mo | Mo | Ag |
Mt | % | % | % | g/t | M lbs | kt | M lbs | kt | (koz) | |
Indicated | 495 | 0.37 | 0.30 | 0.016 | 1.75 | 3,248 | 1,473 | 180 | 82 | 27,911 |
Inferred | 6.3 | 0.37 | 0.28 | 0.019 | 1.44 | 39 | 18 | 3 | 1 | 291 |
Building upon the information released in this updated MRE, an 8,000 to 10,000 metre drill program is planned to commence in May that aims to 1) partially define Measured Resources and improve grades in the higher-grade core of the Copper Mountain deposit, which could provide approximately 60 Mt of higher grade “starter-pit” material estimated from a 0.40% Cu lower cut-off grade; and 2) test the potential for near-surface mineralization around the historical Needle Mountain mine that was the starter operation for Gaspé Copper in the 1950’s (A and B Zones).
General parameters of the updated Mineral Resource Estimate
This resource is pit-constrained to mineralization surrounding the past-producing Copper Mountain open pit mine and uses, amongst other parameters, a long-term price of US$4.00/lb copper (cutoff of 0.12% Cu) for pit shell modelling, pre-set eastern and southeastern geographical constraints on pit limits to minimize impacts on the town of Murdochville from future potential mining operations, and a lower cut-off grade of 0.15% copper for base case in-pit resource estimation. The resource was estimated using data from historical drilling completed between the 1950’s and 2019 and 37,390 metres of drilling completed by the Company in 2022 and 2023. See the Appendix at the end of this news release for detailed parameters.
Mineral Resource Sensitivity
The following table shows the resources reported at various in-pit cut-off grades within a pit shell modelled at a lower cut off of 0.12% Cu; the base case resource cut-off grade reported herein is 0.15% copper and is highlighted in bold text:
Table 2: Indicated Mineral Resource Estimates at Variable Cut-Off Grades
Class | Copper Cut-off (%) |
Tonnage (Mt) |
Strip Ratio |
Grade | Copper Metal Resource | ||
Cu % | Mo % | M lbs | kt | ||||
Indicated | 0.12 | 572 | 0.93 | 0.28 | 0.015 | 3,476 | 1,576 |
0.15 | 495 | 1.23 | 0.30 | 0.016 | 3,248 | 1,473 | |
0.20 | 376 | 1.94 | 0.34 | 0.018 | 2,791 | 1,266 | |
0.25 | 273 | 3.05 | 0.38 | 0.020 | 2,279 | 1,034 | |
0.30 | 186 | 4.93 | 0.43 | 0.022 | 1,758 | 797 | |
0.40 | 86 | 11.9 | 0.53 | 0.025 | 1,000 | 454 |
Same footnotes as Table 1 apply to this table.
Potential for Additional Mineral Resources at Gaspé Copper
End-of-mine historical mineral resources at Gaspé Copper that are not NI 43-101 compliant are reported in the Noranda/Falconbridge Annual Reports 1998-2000, Quebec government mining assessment reports and in Hussey & Bernard (SME Aug 1998, p. 36-44). The following disclosure describes areas of remaining mineralization at Gaspé Copper that the Company believes offer excellent potential for additional mineral resources. Osisko Metals’ strategy at the present time is to focus on the economic viability of the currently defined Copper Mountain resource, and if this can be achieved, evaluation of mineralized zones described below will follow with additional drill programs.
Larger open pit resource potential at Copper Mountain
The current modelled Whittle pit shell includes pre-set eastern and southeastern geographical constraints on pit limits designed to minimize impacts on the town of Murdochville from potential future mining operations (Figure 1), namely leaving the southern portion of Copper Mountain intact. Geological modelling of stockwork mineralization and residual disseminated skarn mineralization occurring between the Copper Mountain and Needle Mountain historical open pits, the latter located 1.6 kilometers south of Copper Mountain, indicates potential for a significantly larger open pit resource at Gaspé Copper. Further geological and pit modelling is required to evaluate such potential and this work is ongoing. In the event that a larger viable pit-constrained resource can be defined, the Company will evaluate the possibility of reconfiguring the current layout of the site to minimize disturbance and ensure the protection and safety of the residents of Murdochville and the surrounding environment.
Figure 1. Plan view of the footprint of the currently modelled Whittle pit encompassing the base case mineral resource.
Open pit resource potential at Needle Mountain
Modelling of the residual copper mineralization along the perimeter and below the open pit A Zone and the underground B Zone at Needle Mountain, including residual pillars in the B Zone, indicates potential for a higher-grade, secondary open-pit resource that would be distinct from the Copper Mountain resource. The modelling is based entirely on 1950’s and 1960’s historical drill holes, which were only partially assayed for copper and not for molybdenum nor silver. This area will be tested with a Phase I, 4,000-metre drill program starting at the end of May and if successful, will be followed by a Phase II program later in the season.
High-grade residual mineralization near past underground operations
Residual underground skarn mineralization still remains in the form of pillars in the mined portion of the C Zone (grades of 1% to 2% copper), as well as massive sulfide/skarn mineralization in the deeper E Zone (grades of 3% to 4% copper) within the E-38 deposit and up to 800 metres north of this deposit. The E Zone skarn aureole received little follow-up drilling north of the E-38 deposit and offers excellent potential for further resource definition at significantly higher copper and molybdenum grades. Drilling of the E Zone skarn is planned for 2025.
Appendix – parameters and criteria used for the Mineral Resource Estimate (MRE)
Parameter | Value | Unit |
Copper Price | $4.00 | US$ per pound |
CAD:USD exchange rate | 1.33 | |
Discount Rate | 8.0 | Percent |
Royalty Rate | 1.0 | Percent |
Cu concentrate transport + loading costs | $10.40 | US$ per wmt |
Cu concentrate shipping cost | $66.25 | US$ per wmt |
Cu concentrate insurance and other costs | $23.35 | US$ per wmt |
Cu concentrate smelter treatment cost | $80.00 | US$ per wmt |
Cu concentrate smelter refining cost | $0.08 | US$ per pound |
Cu concentrate grade | 25.0 | Percent |
Payable Cu | 96.5 | Percent |
In-Pit Mining Cost | $2.85 | US$ per tonne mined |
Mill Processing Cost | $3.76 | US$ per tonne milled |
General and Administrative Costs | $1.57 | US$ per tonne milled |
Overall Pit Slope – Rock | 48 | Degrees |
Copper Recovery | 92 | Percent (%) |
Mining loss / Dilution (open pit) | 0 / 0 | Percent / Percent |
Waste Avg. Specific Gravity | 2.67 | Tonnes/cubic metre |
Mineralization Specific Gravity (variable) | Avg. 2.73 | Tonnes/cubic metre |
Cautionary Statement Regarding Copper Equivalent Grades
Copper Equivalent grades are expressed for purposes of simplicity and are calculated taking into account 1) metal grades; 2) estimated long-term prices of metals: US$4.00/lb copper, $19.00/lb molybdenum and US$22/oz silver; 3) estimated recoveries of 92%, 70% and 70% for Cu, Mo and Ag respectively and 4) net smelter return value of metals as percentage of the price, estimated at 86.5%, 90.7% and 75.0% for Cu, Mo and Ag respectively.
Cautionary Statement Regarding Mineral Resources
The mineral resources disclosed in this press release conform to NI43-101 standards and guidelines and were prepared by independent qualified persons. The above-mentioned mineral resources are not mineral reserves as they do not have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological data is sufficient to imply but not verify geological grade and/or quality of continuity. An Inferred Mineral Resource has a lower level of confidence relative to a Measured or Indicated Mineral Resource and constitutes an insufficient level of confidence to allow conversion to a Mineral Reserve. It is reasonably expected, but not guaranteed, that the majority of Inferred Mineral Resources could be upgraded to Measured or Indicated Mineral Resources with additional drilling. The National Instrument 43-101 Technical Report, including the mineral resources for the Gaspé Copper Project contained in this news release, will be delivered and filed on SEDAR by Osisko Metals within 45 days of the date of this news release.
Qualified Persons
The Mineral Resource Estimate and technical information in this news release has been prepared and approved by independent qualified persons, as defined by National Instrument (“NI”) 43-101 guidelines: Pierre-Luc Richard, P.Geo., of PLR Resources Inc. with contributions from Carl Michaud, P.Eng., of G-Mining for cut-off grade and Pit Shell optimization, and Colin Hardie, P.Eng., from BBA, for metallurgical parameters. Technical information relating to historical copper deposits at Gaspé Copper has been reviewed by Jeff Hussey, P. Geo., a non-independent Qualified Person in accordance with National Instrument 43-101 standards.
About Osisko Metals
Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals space, more specifically copper and zinc. The Company is a joint venture partner with Appian Capital Advisory LLP for the advancement of one of Canada’s premier past-producing zinc mining camps, the Pine Point Project, located in the Northwest Territories, for which the 2022 PEA (as defined herein) has indicated an after-tax NPV of C$602 million and an IRR of 25%, based on long-term zinc price of US$1.37/lb and the current mineral resource estimates that are amenable to open pit and shallow underground mining. The current mineral resource estimate in the 2022 PEA consists of 15.7 Mt grading 5.55% ZnEq of Indicated Mineral Resources and 47.2 Mt grading 5.94% ZnEq of Inferred Mineral Resources. Please refer to the technical report entitled “Preliminary Economic Assessment, Pine Point Project, Hay River, Northwest Territories, Canada” dated August 26, 2022 (with an effective date of July 30, 2022), which was prepared for Osisko Metals and PPML by representatives of BBA Engineering Inc., HydroRessources Inc., PLR Resources Inc. and WSP Canada Inc. Please refer to the full text of the 2022 PEA, a copy of which is available on SEDAR (www.sedar.com) under the Osisko Metals’ issuer profile, for the assumptions, methodologies, qualifications and limitations described therein. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, with paved highway access, an electrical substation, as well as 100 kilometres of viable haulage roads.
In addition, the Company acquired in July 2023, from Glencore Canada Corporation, a 100% interest in the past-producing Gaspé Copper Project, located near Murdochville in the Gaspé peninsula of Québec. The Company is currently focused on resource evaluation of the Copper Mountain Deposit that hosts the updated Mineral Resource Estimate described herein. Gaspé Copper hosts the largest undeveloped copper resource in Eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec.
Goldshore Resources Inc. (TSX-V: GSHR) (OTCQB: GSHRF) (FWB: 8X00), is pleased to announce the first... READ MORE
Alphamin Resources Corp. (TSX-V:AFM) (JSE AltX:APH) is pleased to provide the following update for t... READ MORE
Winshear Gold Corp. (TSX-V: WINS) is pleased to report the results of its 2024 maiden drill program... READ MORE
Hudbay Minerals Inc. (TSX: HBM) (NYSE: HBM) is pleased to announce that it has surpassed a total of... READ MORE
Azimut Exploration Inc. (“Azimut” or the “Company”) (TSXV: AZM) (OTCQX: AZMTF) is pleased... READ MORE