The Prospector News

Osisko Development Intersects 23.32 g/t Over 15.0 m on Island Mountain at Cariboo and Announces the Grant of Replacement Restricted Share Units

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Osisko Development Intersects 23.32 g/t Over 15.0 m on Island Mountain at Cariboo and Announces the Grant of Replacement Restricted Share Units

 

 

 

 

 

Osisko Development Corp. (TSX-V-ODV) is pleased to announce drilling results from the 200,000-meter 2021 exploration and category conversion drill program campaign at its Cariboo Gold Project in central British Columbia. A total of ten diamond drill rigs are currently at Cariboo.

 

Island Mountain Overview

  • Mosquito Creek and Shaft Zone deposits are located on Island Mountain.
  • To date in 2021, a total of 133 drill holes have been drilled on Island Mountain, designed to infill and expand known vein corridors.
  • Recent results include holes IM-21-001 to IM-21-010.
  • A total of 124 mineralized vein corridor solids are modelled on Island Mountain, to an average depth of 350 meters, to a maximum depth of 700 meters and remain open.
  • Recent drill results show significant down dip expansion of modelled vein corridors illustrated in IM-21-009 that intersected 23.32 g/t Au over 15.0 meters.
  • Detailed drilling results, a drill hole location plan map and vertical long section is presented at the end of this release.

 

Recent Drilling Highlights:

  • 21.94 g/t Au over 2.70 meters in hole IM-21-003
  • 23.48 g/t Au over 2.30 meters in hole IM-21-004
  • 5.24 g/t Au over 10.85 meters in hole IM-21-004
  • 13.39 g/t Au over 4.10 meters in hole IM-21-005 including
  • 41.30 g/t Au over 1.30 meters
  • 23.32 g/t Au over 15.00 meters in hole IM-21-009 including
  • 85.80 g/t Au over 1.00 meter and
  • 118.50 g/t Au over 1.00 meter
  • 16.83 g/t Au over 4.40 meters in hole IM-21-010 including
  • 73.40 g/t Au over 0.80 meter

 

Chris Lodder, President of Osisko Development commented, “These first ten infill and expansion drill holes from the Mosquito Creek Deposit are showing the depth potential at Mosquito Creek and continuity between the Shaft and Mosquito deposits”.

 

Mineralized quartz veins on Cariboo are overall sub-vertical dip and northeast strike. Vein corridors are defined as a high-density network of mineralized quartz veins within the axis of the last folding event’s folds and hosted within a brittle meta-sandstone or calcareous meta-sandstone. Vein corridors are modelled at a minimum thickness of 2 meters and average about 4.5 meters true width. Individual mineralized veins within these corridors have widths varying from centimeters to several meters and strike lengths from a few meters to over 50 meters. These corridors have been defined from surface to a vertical depth averaging300 meters and remain open for expansion at depth and along strike. Gold grades are intimately associated with quartz vein-hosted pyrite as well as pyritic, intensely silicified wall rock haloes in close proximity to the veins.

 

True widths are estimated to be 60% to 75% of reported core length intervals. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays. Complete assay highlights are presented in Table 1, drill hole locations are listed in Table 2.

 

Corporate Matters

 

Following the closing of the reverse takeover bid transaction by Osisko Gold Royalties Ltd on November 25, 2020 which lead to the launch of the Corporation and the transfer of certain Osisko Gold employees to the Corporation on January 1st, 2021, Osisko Gold and the Corporation mutually agreed that a pro-rata portion of the outstanding long-term equity incentive compensation awarded by Osisko Gold to transferred employees in the form of restricted shares units would be borne by the Corporation.

 

The Boards of Directors of Osisko Gold and the Corporation, agreed that Osisko Gold would cancel a pro-rata portion of the outstanding restricted shares units awarded by Osisko Gold (“Osisko Gold RSUs”) to transferred employees and the Corporation would grant to such transferred employees restricted shares units (“Replacement RSUs”) in an equivalent value as the value of the Osisko Gold RSU cancelled by Osisko Gold; which values were determined using a 5-day volume weighted average price of the respective entity on the exchange at a pre-determined reference date.

 

Accordingly, the Corporation is pleased to announce that its Board of Directors has approved the grant and 404,240 Replacement RSUs were granted to officers who held Osisko Gold RSUs that were cancelled. The maturity date shall be the same as the maturity date of the corresponding Osisko Gold RSUs so cancelled.

 

Figure 1: Cariboo deposit areas with drill locations is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/6930c326-9658-462b-a2c9-46cf55043db5

 

Figure 2: Mosquito Creek detail area with drill intercept highlights is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/7668eaf1-826b-432d-8f40-536624c22b97

 

Figure 3: Mosquito Creek drill cross section is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/7a2046ad-fae3-4501-937f-e1003e4b435f

 

Qualified Persons

 

Per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President Exploration of Osisko Development Corp., is a Qualified Person and has prepared, validated, and approved the technical and scientific content of this news release.

 

Quality Assurance – Quality Control

 

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at a secured facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. Quality control samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd.

 

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

 

About Osisko Development Corp.

 

Osisko Development Corp. is well-capitalized and uniquely positioned as a premier gold development company in North America to advance the Cariboo Gold Project and other Canadian and Mexican properties, with the objective of becoming the next mid-tier gold producer. The Cariboo Gold Project, located in central British Columbia, is Osisko Development’s flagship asset with measured and indicated resources of 21.44 Mt at 4.6 Au g/t for a total of 3.2 million ounces of gold and inferred resource of 21.69 Mt at 3.9 Au g/t for a total of 2.7 million ounces of gold (see NI 43-101 Technical Report for resource October 5th, 2020). The considerable exploration potential at depth and along strike distinguishes the Cariboo Gold Project relative to other development assets as does the historically low, all-in discovery costs of US $19 per ounce. The Cariboo Gold Project is advancing through permitting as a 4,750 tonnes per day underground operation with a feasibility study on track for completion in the second half of 2021. Osisko Development’s project pipeline is complemented by potential near-term production targeted from the San Antonio gold project, located in Sonora Mexico and early exploration stage properties including the Coulon Project and James Bay Properties located in Québec as well as the Guerrero Properties located in Mexico. Osisko Development began trading on the TSX Venture Exchange under the symbol “ODV” on December 2, 2020.

 

Table 1: Cariboo Gold Project Island Mountain 2021 Length Weighted Drill Hole Gold Composites

 

HOLE ID   FROM M TO (M) LENGTH (M) AU G/T Target
IM-21-001   19.90 24.35 4.45 4.36 MOSQUITO
  INCLUDING 19.90 21.40 1.50 6.98  
    209.80 211.54 1.74 4.17  
  INCLUDING 211.00 211.54 0.54 8.60  
    234.00 235.75 1.75 3.11  
    289.60 290.40 0.80 7.81  
IM-21-002 HOLE ABANDONED         MOSQUITO
IM-21-003   28.60 31.30 2.70 21.94 MOSQUITO
  INCLUDING 28.60 29.70 1.10 30.90  
  AND 29.70 30.50 0.80 11.35  
  AND 30.50 31.30 0.80 20.20  
IM-21-004   107.75 110.05 2.30 23.48 MOSQUITO
  INCLUDING 107.75 108.90 1.15 30.90  
    118.40 118.90 0.50 4.05  
    224.00 234.85 10.85 5.24  
  INCLUDING 224.60 225.60 1.00 24.60  
  AND 225.60 226.55 0.95 8.42  
  AND 229.00 229.80 0.80 13.60  
  AND 233.90 234.85 0.95 10.90  
IM-21-005   40.40 44.50 4.10 13.39 MOSQUITO
  INCLUDING 42.10 43.40 1.30 41.30  
    135.00 136.00 1.00 2.97  
    158.00 163.50 5.50 3.15  
  INCLUDING 162.90 163.50 0.60 5.15  
    205.40 207.15 1.75 12.00  
  INCLUDING 206.05 207.15 1.10 17.95  
IM-21-006   29.25 30.55 1.30 9.10 SHAFT
  INCLUDING 29.25 30.00 0.75 14.70  
    39.00 39.55 0.55 3.95  
    46.20 47.00 0.80 10.60  
    75.00 77.00 2.00 8.37  
  INCLUDING 75.00 75.50 0.50 14.55  
  AND 75.50 76.00 0.50 7.95  
  AND 76.00 76.50 0.50 9.06  
    168.00 168.50 0.50 8.21  
IM-21-007   185.40 186.30 0.90 27.90 SHAFT
    254.60 255.80 1.20 3.34  
    282.95 286.00 3.05 4.21  
  INCLUDING 282.95 283.85 0.90 10.35  
IM-21-008   45.00 47.10 2.10 9.94 MOSQUITO
  INCLUDING 46.30 47.10 0.80 13.25  
    129.50 130.00 0.50 21.80  
IM-21-009   206.00 221.00 15.00 23.32 MOSQUITO
  INCLUDING 206.00 206.75 0.75 52.00  
  AND 206.75 207.45 0.70 36.40  
  AND 213.00 214.05 1.05 9.09  
  AND 216.00 217.00 1.00 85.80  
  AND 217.00 218.00 1.00 118.50  
  AND 218.00 219.00 1.00 37.90  
  AND 220.00 221.00 1.00 14.30  
    225.00 229.00 4.00 3.10  
    234.00 236.80 2.80 6.07  
  INCLUDING 235.00 236.00 1.00 8.00  
IM-21-010   23.00 23.50 0.50 6.24 MOSQUITO
    25.60 26.20 0.60 7.42  
    44.20 45.50 1.30 5.94  
    51.50 55.90 4.40 16.83  
  INCLUDING 51.50 52.00 0.50 30.30  
  AND 55.10 55.90 0.80 73.40  

 

 

Table 2: Drill Hole Locations and Orientations

 

HOLE ID EASTING NORTHING ELEV DIP AZI DEPTH (M)
IM-21-001 593688 5885193 1395 -53 155 303
IM-21-002 593542 5885328 1406 -44 291 32.8
IM-21-003 593933 5884907 1401 -51 267 162
IM-21-004 593687 5885194 1395 -57 154 282
IM-21-005 593543 5885328 1407 -45 304 279
IM-21-006 594254 5884724 1410 -48 121 279
IM-21-007 594913 5884186 1293 -55 106 300
IM-21-008 593862 5884912 1396 -49 322 201
IM-21-009 593689 5885193 1396 -49 153 312
IM-21-010 593862 5884911 1395 -49 300 150

 

Posted June 2, 2021

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Intersects 92.5 m of 11.82% Igneous Phosphate Starting at Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

April 23, 2024

Kuya Silver Provides Update on Mine Start-up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Targeting Commencement of Production at Bethania in H1 2024 ... READ MORE

April 23, 2024

Silvercorp Reports Operational Results and Financial Results Release Date for Fiscal 2024, and Issues Fiscal 2025 Production, Cash Costs, and Capital Expenditure Guidance

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reports pr... READ MORE

April 23, 2024

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m; 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m, and 1.32% Li2O over 14m

Excellent follow-up drill results from high-grade discovery holes... READ MORE

April 23, 2024

Solaris Reports First Drilling Results from 2024 Program and Exploration Update, Including 150m of 0.67% CuEq within 384m of 0.51% CuEq and 284m of 0.53% CuEq from Near Surface

Solaris Resources Inc. (TSX: SLS) (NYSE: SLSR) is pleased to repo... READ MORE

April 23, 2024

Copyright 2024 The Prospector News