The Prospector News

Osisko Development Closes Final Tranche of Non-Brokered Private Placement for Total Aggregate Proceeds of US$34.5 Million

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Osisko Development Closes Final Tranche of Non-Brokered Private Placement for Total Aggregate Proceeds of US$34.5 Million

 

 

 

 

 

Osisko Development Corp. (NYSE: ODV) (TSX-V: ODV) is pleased to announce the successful closing of its previously-announced non-brokered private placement of units of the Company announced on September 4, 2024, pursuant to which the Company issued an aggregate of 19,163,410 Units at a price of US$1.80 per Unit for an overall offering size to approximately US$34.5 million, comprising (i) 13,426,589 Units at a price of US$1.80 per Unit for gross proceeds of approximately US$24.2 million, which closed on October 1, 2024, and (ii) 5,736,821 Units at a price of US$1.80 per Unit for gross proceeds of approximately US$10.3 million, which closed on October 11, 2024.

 

Each Unit consists of one common share of the Company and one Common Share purchase warrant of the Company, with each Warrant entitling the holder thereof to purchase one additional Common Share at a price of US$3.00 per Warrant Share on or prior to October 1, 2029.

 

The Company intends to use the net proceeds of the Offering towards the advancement of its Cariboo Gold Project and Tintic Project, to partially repay its existing credit facility and for general corporate purposes. All securities issued under the Offering will be subject to a hold period expiring four months and one day from the date of issue pursuant to applicable Canadian securities laws. The Offering remains subject to final acceptance of the TSX Venture Exchange. No finder’s fee or commissions were payable in connection with the Offering.

 

This news release does not constitute an offer to sell or a solicitation of an offer to buy any securities in the United States or any other jurisdiction in which such offer, solicitation or sale would be unlawful. No securities may be offered or sold in the United States or in any other jurisdiction in which such offer or sale would be unlawful absent registration under the U.S. Securities Act of 1933, or an exemption therefrom or qualification under the securities laws of such other jurisdiction or an exemption therefrom.

 

ABOUT OSISKO DEVELOPMENT CORP.

 

Osisko Development Corp. is a North American gold development company focused on past-producing mining camps located in mining friendly jurisdictions with district scale potential. The Company’s objective is to become an intermediate gold producer by advancing its 100%-owned Cariboo Gold Project, located in central B.C., Canada, the Tintic Project in the historic East Tintic mining district in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico. In addition to considerable brownfield exploration potential of these properties, that benefit from significant historical mining data, existing infrastructure and access to skilled labour, the Company’s project pipeline is complemented by other prospective exploration properties. The Company’s strategy is to develop attractive, long-life, socially and environmentally sustainable mining assets, while minimizing exposure to development risk and growing mineral resources.

 

Posted October 15, 2024

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News