The Prospector News

Orefinders Intersects 15.6g/t Gold over 3.6 Metres on its Knight Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Orefinders Intersects 15.6g/t Gold over 3.6 Metres on its Knight Project

 

 

 

 

 

Orefinders Resources Inc. (TSX-V: ORX) is pleased report its latest results including a high-grade intercept in drill hole TYR20-004 of 15.6 g/t gold over 3.6m on its 100% owned Knight Project in the Shining Tree Greenstone Belt, 110km southwest of Kirkland Lake, Ontario.

 

Newly received results from drill hole TYR20-004 define two mineralized intervals (Table 1).

 

  1. 15.6 g/t gold over 3.6mbetween 604.4m and 608m downhole.
  • The intersection is hosted by sheared metavolcanic rocks 200 metres below the mine’s previously excavated zone and approximately 80 metres to the north of previous reported mineralized intervals from drill hole TYR20-001 (News Release of November 5, 2020).
  • This high-grade intersection is hosted by a sheared zone within the footwall (about 60 metres structurally below) the historically mined Tyranite fault structure. The footwall structure hosting that mineralized zone may be linked to a similar structure that deforms a syenitic intrusive body in drill hole TYR20-001 and that hosts a previously reported mineralized interval in that drill hole. Ongoing structural analysis should validate that interpreted structural continuity.
  • This mineralized interval includes an assay of 42.1 g/t over 0.8 m (Table 1).
  1. 2.2 g/t gold over 9.0mbetween 530m and 539m downhole.
  • The mineralized interval is hosted by sheared metavolcanic rocks within the Tyranite fault structure, which was the primary target of the drill hole and about 145 metres below the mine’s previously excavated zone.
  • The mineralized interval includes two higher grade assays for 1 metre sample lengths including 4.6 g/t from 530 metres; 6.9 g/t from 538m.

 

Assay Laboratory Delays

 

Orefinders would like to update shareholders that it has faced significant delays in the receipt of its assays results. The Company has kept in close communications with the laboratory which has communicated that the previous backlog of results is expected to improve substantially.

 

Drilling of TYR20-004 was completed on November 20, 2020; the samples for which the results are reported here were received by the assay laboratory on November 27, 2020 and the results were returned from the assay laboratory on January 27, 2021.

 

Table 1. Mineralized Intervals from Drill Hole TYR20-004
From (m) To (m) Sample
Length (m)
Assay Result
(g/t)
Interval
Grade (g/t)
Interval
Length (m)
530 531 1 4.6
531 532 1 1.2
532 533 1 1.9
533 534 1 0.8
534 535 1 0.6
535 536 1 0.1
536 537 1 1.6
537 538 1 1.9
538 539 1 6.9 2.2 9.0
604.4 605.4 1 13.4
605.4 606.2 0.8 42.1
606.2 607 0.8 8.8
607 608 1 2.1 15.6 3.6

 

Further Technical Detail on TYR20-004 and Ongoing Drilling at the Knight Gold Project
TYR20-004 was designed primarily to validate the continuity, at depth, of the mineralized Tyranite Shear structure beneath the historical workings at the Tyranite Mine, which represents one of several drill target zones at the Knight Gold Project.

 

The mineralized intervals reported here are grade composites calculated using the Leapfrog Geo 3-D modeling software platform and applying a 2.0 g/t cut-off grade for composited intervals.

 

The drilling program at Knight is focused on three target zones described in a news release dated October 15, 2020. They include the Tyranite mine zone, the Porphyry Lake zone (including several Minto-style targets) and the Duggan West zone. The thirteen drill holes planned for the Tyranite target zone have now been completed and drilling commenced on the Porphyry Lake target zone on January 26, 2021. Orefinders looks forward to reporting further results for Tyranite as assays are returned from the assay laboratory.

 

QP Statement

 

The technical information in this news release has been reviewed and approved by Dr. Keith Benn, P.Geo., Vice President Exploration for Orefinders, a Qualified Person as defined in “National Instrument 43-101, Standards of Disclosure for Mineral Projects.”  For the exploration undertaken by Orefinders, all assay batches are accompanied by rigorous Quality Assurance procedures that include insertion of standards and blanks and verification assays in a secondary laboratory.  Quality Control results, including the laboratory’s control samples, are evaluated immediately on reception of batch results and corrections implemented immediately if necessary.

 

About Orefinders Resources Inc.

 

Orefinders is a Gold exploration and development company focused exclusively on the Abitibi Greenstone Belt. The Company is listed on the Toronto Venture Exchange.

 

Posted January 29, 2021

Share this news article

MORE or "UNCATEGORIZED"


PPX Mining Announces Closing Of $1.35 Million Private Placement

PPX Mining Corp. is pleased to announce that it has closed its fu... READ MORE

April 19, 2024

Elevation Gold Reports Financial Results for Year Ended December 31, 2023, including $66.4M in Total Revenue

Elevation Gold Mining Corporation (TSX-V: ELVT) (OTCQB: EVGDF) i... READ MORE

April 18, 2024

Reunion Gold Announces the Signing of a Mineral Agreement With the Government of Guyana for Its Oko West Project

Reunion Gold Corporation (TSX-V: RGD; OTCQX: RGDFF) is pleased to announ... READ MORE

April 18, 2024

Drilling Confirms 4 km of Favourable Corridor at Lynx Gold Trend

Puma Exploration Inc. (TSX-V: PUMA) (OTCQB: PUMXF) is thrilled to... READ MORE

April 18, 2024

Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update

Grid Metals Corp. (TSX-V:GRDM) (OTCQB:MSMGF) is pleased to announ... READ MORE

April 18, 2024

Copyright 2024 The Prospector News