The Prospector News

Orefinders Intersects 11.5g/t Gold over 5.25 Metres including 23.2g/t Gold over 2 Metres on its Knight Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Orefinders Intersects 11.5g/t Gold over 5.25 Metres including 23.2g/t Gold over 2 Metres on its Knight Project

 

 

 

 

 

Orefinders Resources Inc. (TSX-V: ORX) is pleased report its latest results including a high-grade intercept in drill hole TYR20-005 of 11.5 g/t gold over 5.25m including 23.2 g/t gold over 2.0m on its 100% owned Knight Project in the Shining Tree Greenstone Belt, 110km southwest of Kirkland Lake, Ontario.

 

Newly received results from drill hole (Tyranite) TYR20-005 include the following mineralized intervals (Table 1).

  • 11.5 g/t gold over 5.25m between 325.5m and 330.75m downhole.
    • The intersection is hosted by sheared metavolcanic rocks 240 metres below surface proximal to the mine’s previously excavated zone and approximately 230 metres up dip of the Tyranite Structure from a previously reported mineralized interval in drill hole TYR20-004.
    • This mineralized interval includes a higher-grade interval of 23.2 g/t gold over 2.0m.

 

Other Highlights To Date from Drilling at the Tyranite Mine Target Zone
Previously reported mineralized intervals in two drill holes from the current drill campaign include:

 

  • TYR20-001 : 4.18 g/t gold over 14.28m from 615.72m; and 2.03 g/t gold over 9.0m from 719m (News Release of November 5, 2020);
  • TYR20-004 : 15.6 g/t gold over 3.6m from 604.4m ; and 2.2 g/t gold over 9.0m from 530m (News Release of January 29, 2021).

 

Assay Laboratory Delays

Orefinders would like to update shareholders that it has faced significant delays in the receipt of its assay results. The Company has kept in close communication with the laboratory and the delivery rate of assay results has recently improved substantially.

 

Further Technical Detail and Ongoing Drilling at the Knight Gold Project

 

All new mineralized intervals reported here are grade composites calculated using the Leapfrog Geo 3-D modeling software platform and applying a 1.7 g/t cut-off grade for composited intervals. Some previously reported intervals were determined as grade composites using a cut-off grade of 2.0 g/t; applying a 1.7 g/t cut-off grade to those previously reported intervals does not result in any changes to the calculated grades or interval lengths.

 

The drilling program at Knight is focused on three target zones described in a news release dated October 15, 2020. They include the Tyranite Mine zone, the Porphyry Lake zone (including several Minto-style targets) and the Duggan West zone. The thirteen drill holes planned for the Tyranite target zone have now been completed and approximately 900 assay results are pending. Development of Orefinders understanding of the Structural Geology controls on gold mineralization at Tyranite is advancing well and is expected to generate targets to be tested by future drilling. Drilling commenced on the Porphyry Lake target zone on January 26, 2021. Six of the eight planned drill holes at the Porphyry Lake target zone have now been completed and all assay results are pending. Orefinders looks forward to reporting further results for the Knight Gold Project as assays are returned from the laboratory.

 

 

Table 1. Mineralized Intervals from Drill Hole TYR20-005

 

From (m) To (m) Sample
Length (m)
Assay Result
Au (g/t)
Interval
Grade (g/t)
Interval
Length (m)
Interval
Grade (g/t)
Interval
Length (m)
325.5 326 0.5 1.88
326 327 1 4.59
327 328 1 17.7
328 329 1 28.6 23.2 2.0
329 330 1 6.77
330 330.75 0.75 2.23 11.5 5.25
Notes: The gold grades were calculated for grade composites using Leapfrog Geo software and a cut-off grade of 1.7 g/t

 

QP Statement

 

The technical information in this news release has been reviewed and approved by Dr. Keith Benn, P.Geo., Vice President Exploration for Orefinders, a Qualified Person as defined in “National Instrument 43-101, Standards of Disclosure for Mineral Projects.”  For the exploration undertaken by Orefinders, all assay batches are accompanied by rigorous Quality Assurance procedures that include insertion of standards and blanks and verification assays in a secondary laboratory.  Quality Control results, including the laboratory’s control samples, are evaluated immediately on reception of batch results and corrections implemented immediately if necessary.

 

About Orefinders Resources Inc.

 

Orefinders is a Gold exploration and development company focused exclusively on the Abitibi Greenstone Belt. The Company is listed on the Toronto Venture Exchange.

 

Posted February 11, 2021

Share this news article

MORE or "UNCATEGORIZED"


KOOTENAY SILVER CLOSES BROKERED PUBLIC OFFERING FOR GROSS PROCEEDS OF C$10.35 MILLION

Kootenay Silver Inc. (TSX-V: KTN) is pleased to announce that the... READ MORE

April 25, 2024

U.S. Gold Corp. Closes $4.9 Million Non-Brokered Registered Direct Offering

U.S. Gold Corp. (NASDAQ: USAU), is pleased to announce that it h... READ MORE

April 25, 2024

Getchell Gold Corp. Announces Final Tranche of Debenture Financing

Getchell Gold Corp. (CSE: GTCH) (OTCQB: GGLDF) (FWB: GGA1) is ple... READ MORE

April 25, 2024

Imperial Reports Production Update for 2024 First Quarter

Imperial Metals Corporation (TSX:III) reports quarterly copper an... READ MORE

April 25, 2024

ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

ALX Resources Corp. (TSX-V: AL) (FSE: 6LLN) (OTC: ALXEF) is pleas... READ MORE

April 25, 2024

Copyright 2024 The Prospector News