The Prospector News

Omineca Announces Upsize of Private Placement to Up to $4.4 Million

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Omineca Announces Upsize of Private Placement to Up to $4.4 Million

 

 

 

 

 

Omineca Mining and Metals Ltd. (TSX-V: OMM) is pleased to announce that, due to strong investor demand, it has agreed with Mackie Research Capital Corporation, as lead agent and sole bookrunner, to increase the size of the previously announced and amended best efforts private placement for gross proceeds of up to $4,400,000 in a combination of: (i) units of the Company at a price of $0.28 per Unit, and (ii) flow-through units of the Company  at a price of $0.30 per FT Unit.

 

Each Unit will be comprised of one common share of the Company and one-half of one Common Share purchase warrant. Each FT Unit shall consist of one “flow-through” common share of the Company (within the meaning of the Income Tax Act (Canada) and one-half of one Warrant. Each Warrant shall be exercisable to acquire one Common Share at a price of $0.35 per Warrant Share for a period of 24 months from the closing of the Offering.

 

The Company intends to use the net proceeds from the Offering for its ongoing exploration drilling program, working capital requirements and other general corporate purposes. The primary focus of Omineca’s lode gold exploration program at the Wingdam gold project is locating the presumed multiple bedrock sources of placer gold recovered by Omineca in the 2012 underground bulk sampling program. The systematic exploration work program also includes rock sampling, soil grid sampling, channel/saw cut sampling, mapping and geophysics.

 

The net proceeds received by the Company from the sale of the FT Units will be used to incur eligible “Canadian exploration expenses” that are “flow-through mining expenditures” (as such term is defined in the Income Tax Act (Canada)) related to the Wingdam gold project. The Company will renounce such CEE to the purchasers of the FT Units with an effective date of no later than December 31, 2020.

 

The Agent will have an option to offer for sale up to an additional 15% of the number of Units and FT Units sold in the Offering, which the Agent’s Option is exercisable, in whole or in part, at any time up to 48 hours prior to the closing of the Offering.

 

The Units and FT Units to be issued under the Offering will be offered by way of private placement in each of the provinces of Canada, and such other jurisdictions as may be determined by the Company, in each case, pursuant to applicable exemptions from the prospectus requirements under applicable securities laws.

 

The Offering is scheduled to close on or about the week of November 16, 2020, or such date as agreed upon between the Company and the Agent and is subject to certain conditions including, but not limited to, the receipt of all necessary approvals including the approval of the TSX Venture Exchange. The Units, FT Units, and the underlying securities comprising of the Units and FT Units, to be issued under the Offering will have a hold period of four months and one day from Closing.

 

The Company will grant the Agent, on the date of Closing, non-transferable compensation options equal to 7.0% of the total number of Units sold pursuant to the Offering (including in respect of any exercise of the Agent’s Option). Each Compensation Option will entitle the holder thereof to purchase one Unit (at an exercise price per Compensation Option Unit equal to $0.28 for a period of 24 months following the Closing.

 

Omineca advises that the insiders of the company may participate in the financing, which will be completed pursuant to available related party exemptions under Multilateral Instrument 61-101.

 

About Omineca Mining and Metals Ltd.

 

Omineca Mining and Metals Ltd. controls its flagship Wingdam Project and the Fraser Canyon Project through its wholly owned subsidiary CVG Mining Ltd. The Wingdam Project is located 45 km east of Quesnel B.C. on the Barkerville highway. The property includes both placer and hard-rock tenures along the Lightning Creek valley, where topographic conditions created a thick overburden which preserved a large portion of the channel from conventional surface placer mining activity.

 

Posted November 16, 2020

Share this news article

MORE or "UNCATEGORIZED"


JUGGERNAUT CLOSES FINANCING WITH CRESCAT CAPITAL AS LEAD INVESTOR FOR 19.97%

PLANS FOLLOW UP DRILLING ON EXTENSIVE HIGH-GRADE COPPER-GOLD TARG... READ MORE

May 13, 2024

KARORA REPORTS RECORD REVENUE AND STRONG CASH FLOW FOR Q1 2024

Karora Resources Inc. (TSX: KRR) announced financial and operatin... READ MORE

May 13, 2024

OceanaGold Completes IPO, Raises US$106M for the Sale of 20% Interest in OGPI

OceanaGold Corporation (TSX: OGC) (OTCQX: OCANF) is pleased to an... READ MORE

May 13, 2024

Drilling Continues to Expand Gold Resource at OKO

G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to provi... READ MORE

May 13, 2024

CANTEX INTERSECTS UP TO 25.07% LEAD-ZINC WITH 72g/t SILVER AT ITS 100% OWNED NORTH RACKLA PROJECT, YUKON AND WILL COMMENCE DRILLING ITS COPPER PROJECT WHERE PREVIOUS DRILLING INTERSECTED 2.5m OF 3.93% COPPER

Cantex Mine Development Corp. (TSX-V: CD) (OTCQB: CTXDF) provides... READ MORE

May 13, 2024

Copyright 2024 The Prospector News