The Prospector News

North Peak Confirms Historic Waste Rock Pile Mineralisation with Sonic Drilling and Completion of 2025 Reverse Circulation Exploration Drilling Program at Prospect Mountain, Nevada

You have opened a direct link to the current edition PDF

Open PDF Close
Slider

Share this news article

North Peak Confirms Historic Waste Rock Pile Mineralisation with Sonic Drilling and Completion of 2025 Reverse Circulation Exploration Drilling Program at Prospect Mountain, Nevada

 

 

 

 

 

North Peak Resources Ltd. (TSX-V: NPR) (OTCQB: NPRLF) announces assay results from a systematic aircore drill program across the historic waste rock pile that sits in front of the Diamond Mine portal at its Prospect Mountain Mine complex.

 

North Peak undertook an 11-hole aircore drill program on the waste rock pile to better characterize the grade distribution. Although there were a number of historical metallurgical investigations from 2008 & 2010 this work had been done only on material derived from surface sampling of the waste rock pile. Surveys and bulk density measurements in the 2010 study indicated the waste rock pile contains approximately 240,000 short tons of material (see Technical Report filed on SEDAR+, as described below).

 

Aircore samples were taken in predominantly 5ft intervals from vertical holes, with the deepest waste rock pile sample being 61ft from surface. A best assay of 2.34 g/t Au, 68 g/t Ag was reported in hole PM25-001S from 0-5ft. Weighted average values for each hole are presented in Table 1, ranging from 1.28 g/t Au, 34 g/t Ag over 10ft (3.048m) in PM25-007S to 0.24 g/t Au, 18.8 g/t Ag over 20ft (6.097m) in PM25-002S. No holes were unmineralized.

 

“The aircore sampling program has demonstrated that the waste rock pile is mineralized and the Company will continue with the metallurgical test work on the bulk sample provided by the recent drilling, including bottle rolls and column leach tests to assess the suitability of the material for toll leaching with 3rd party leach pad operators,” commented Rupert Williams, CEO. “The Prospect Mountain Mine complex has a permit for 1,000 tpd underground mining and processing off site, however the Company needs to complete further work to fully outline the extraction and transportation process for this finite project.”

 

“The Company’s main objective remains to identify economic quantities of gold mineralization within the Prospect Mountain Property through a drilling discovery. We have recently finished our 2025 exploration drilling program with 14 holes completed, for a total of 4,194m (13,760ft), focusing on four accessible areas and expect assays in Q1 2026. Next year, our proposed exploration program will build on this drill campaign as well as continue to test new cross fault structures that are believed to drive the mineralization within the Eureka camp,” added Rupert Williams, CEO.

 

 

Hole ID Depth Depth Au Ag Easting Northing Elevation
(m) (ft) (g/t) (g/t) (m) (m) (m)
PM25-001S 9.15 30 0.94 26.3 165195 8523464 2406
PM25-002S 6.10 20 0.24 18.8 165188 8523415 2406
PM25-003S 6.10 20 0.29 9.2 165190 8523440 2406
PM25-004S 15.85 52 0.95 25.7 165220 8523482 2403
PM25-005S 18.60 61 0.31 13.9 165230 8523462 2407
PM25-006S 4.57 15 0.72 21.00 165232 8523513 2397
PM25-007S 3.05 10 1.28 34.00 165258 8523509 2389
PM25-008S 6.10 20 0.29 13.50 165260 8523488 2390
PM25-009S 11.89 39 0.29 13.50 165268 8523463 2389
PM25-010S 6.10 20 0.67 17.75 165250 8523446 2396
PM25-011S 3.05 10 0.40 19.00 165180 8523502 2410

 

Table 1: Weighted average composite results for each hole with drill collar positions. Two samples with no recovery were assigned background values as part of the hole composite. Holes were vertical and intervals are 100% of true widths. Coordinates in NAD83m, Nevada East grid, EPSG:32107.

 

 

Review by Qualified Person, Quality Control and Reports

 

Mr. David Pym, CGeol., Consulting Geologist for the Company, is the Qualified Person (QP), as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects, who reviewed and approved scientific and technical disclosure in this press release. The Qualified Person has not reviewed the mineral tenure, nor independently verified the legal status and ownership of the Property or any underlying property agreements.

 

Drilling and Sampling: Drilling was carried out using a track mounted sonic drilling unit for use in unconsolidated material. Samples were decanted into plastic sleeves and sent to McClelland Laboratories Inc., located at 1016 Greg Street, Sparks, NV 89431, an independent certified laboratory. QA/QC procedures included the insertion of blanks, duplicates, and certified reference materials.

 

Samples are dried crushed and pulverised and assayed for gold using a 30g fire assay with an AAS finish and silver using a 4-acid digest and AAS. Overlimit samples for gold and silver are automatically re-assayed by suitable methods. The samples will be kept for further metallurgical testwork on their leach characteristics.

 

About North Peak

 

The Company is a Canadian based gold exploration and development company listed on the TSX Venture Exchange under the symbol “NPR” and the OTCQB under the symbol “NPRLF”. Launched by the founding team behind both Kirkland Lake Gold and Rupert Resources, the team has a strong track record of acquiring mining assets, applying modern exploration techniques and taking them into operational mines.

 

North Peak’s flagship property is the Prospect Mountain Mine complex which lies in the Battle Mountain Eureka trend, in an area known as the Southern Eureka Gold Belt, where three styles of mineralization have been identified, gold, silver Carlin style mineralization, Carbonate Replacement gold, silver, lead, zinc mineralization (CRD) and carbonate hosted Porphyry Related Skarn lead, zinc and gold mineralization associated with cretaceous intrusions. At the Property, the CRD mineralization is heavily oxidized to depths of at least 610m (2,000ft) below the top of the ridge line.

 

A Plan of Operations is in place which covers part of the Property and entitles an operator to pursue surface exploration (totaling 189 acres), underground mining of up to 365,000 tons per annum and certain infrastructural works. A more complete description of the Property’s geology and mineralization, including at the Wabash area, can be found in the NI 43-101 Technical Report on the Prospect Mountain Property, Eureka County, Nevada, USA dated and with an effective date April 10, 2023, prepared by David Pym (Msc), CGeol. of LTI Advisory Ltd. and Dr Toby Strauss, CGeol, EurGeol., of Merlyn Consulting Ltd., which has been filed on SEDAR+ at www.sedarplus.ca under the profile of the Company and on the Company’s website.

 

Posted December 21, 2025

Share this news article

MORE or "SLIDER"


Season's Greetings From The Prospector News

It is time to put our feet up and reflect on the year 2025 and look forw... READ MORE

December 22, 2025

Under the Spotlight – Bruce Counts, CEO Storm Exploration

Rick Mills, Editor/ Publisher, Ahead of the Herd:  Bruce, why do... READ MORE

December 22, 2025

Apollo Silver Announces $25 Million Strategic Investment by Eric Sprott and Jupiter Asset Management

Apollo Silver Corp. (TSX-V:APGO) (OTCQB:APGOF) (Frankfurt:6ZF0) ... READ MORE

December 22, 2025

StrikePoint Gold Plans for a Successful 2026

StrikePoint Gold Inc.  (TSX-V:SKP) (OTCQB:STKXF) is pleased to p... READ MORE

December 22, 2025

Jeff Christian - “Gold and Silver Market Update: 2025 Review and 2026 Outlook” (Video)

In this presentation, Jeffrey Christian of CPM Group delivers the... READ MORE

December 21, 2025

Copyright 2025 The Prospector News