The Prospector News

NexGen Completes Phase I of Feasibility-Stage Drill Program Intersecting High Grade Mineralization and Preliminarily Assessed Robust Geotechnical and Hydrogeological Conditions in all Areas of Arrow

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

NexGen Completes Phase I of Feasibility-Stage Drill Program Intersecting High Grade Mineralization and Preliminarily Assessed Robust Geotechnical and Hydrogeological Conditions in all Areas of Arrow

 

 

 

 

 

NexGen Energy Ltd. (TSX: NXE) (NYSE MKT: NXE) is pleased to report radioactivity results for an additional thirty-seven holes comprising 16,585.5 m from the Company’s Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. The Phase I resource component of the 2019 Feasibility stage program has completed 117 holes totaling 50,968 m.  Utilizing new directional drilling technology, AziDrill, the Company was able to reduce the metres required for Phase I conversion by 28% due to the ability to target mineralization more accurately with deeper directional cuts from the pilot hole.

 

Further, an additional 14 holes of 6,314.4 m were completed designed to geotechnically and hydrogeologically characterize the rock mass within areas of the proposed mine workings and the Underground Tailings Management Facility (“UGTMF”).

 

In total, the 2019 Phase I winter drilling program comprised 131 completed holes totaling 57,282.4 m.

 

Phase I: Conversion of Indicated to Measured Mineral Resources

 

This current phase of the 2019 drilling program targeted the A2 and A3 High-Grade Domains for conversion of Indicated to Measured Mineral Resources within the proposed mine plan at a drill hole spacing of between 9.0 m and 16.7 m (based on a geostatistical data spacing report compiled by Clayton V. Deutsch from Resource Modeling Solutions). All drill holes were collared at a steep inclination, then shallowed out between -55° and -60° before intersecting the target by utilizing the latest in directional drilling technology.  The results below highlight intersections through each of the A2 and A3 High Grade Domains, respectively. 

 

A2 High-Grade Domain Highlights

 

  • AR-19-265c2 intersected 53.5 m of total composite mineralization including 9.80 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 109.0 m section (497.5 to 605.5 m). Additionally, of the 9.80 m of off-scale mineralization intersected in the hole 2.0 m of massive-to-semi massive pitchblende with minimum-greater-than-61,000 cps;
  • AR-19-259c1 intersected 26.5 m of total composite mineralization including 8.40 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 96.0 m section (549.0 to 645.0 m). Additionally, of the 8.40 m of off-scale mineralization intersected in the hole 1.00 m of massive-to-semi massive pitchblende with minimum-greater-than-61,000 cps;
  • AR-19-253c1 intersected 41.0 m of total composite mineralization including 5.20 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 80.0 m section (632.0 to 712.0 m);
  • AR-19-262c1 intersected 37.5 m of total composite mineralization including 5.30 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 88.0 m section (529.0 to 617.0 m).

 

A3 High-Grade Domain Highlights

 

  • AR-19-256c1 intersected 38.5 m of total composite mineralization including 8.10 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 96.0 m section (437.0 to 533.0 m). Additionally, of the 8.10 m of off-scale mineralization intersected in the hole 1.5 m of massive-to-semi massive pitchblende with minimum-greater-than-61,000 cps;
  • AR-19-258c2 intersected 42.0 m of total composite mineralization including 10.85 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 88.0 m section (413.5 to 501.5 m);
  • AR-19-263c3 intersected 46.5 m of total composite mineralization including 7.20 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 85.0 m section (584.0 to 669.0 m).

 

Drill hole locations are shown in Figure 1, full drilling results can be found in Table 1. Drill hole descriptions can be found at www.nexgenenergy.ca

 

Phase I: Testing Geotechnical and Hydrogeological Conditions within the proposed mine plan and Underground Tailings Management Facility (“UGTMF”)

 

An additional 14 holes totaling 6,314.4 m were completed designed to geotechnically and hydrogeologically characterize the rock mass within areas of the proposed mine plan and the UGTMF. The preliminary field analysis indicated robust rock mass conditions in all areas. A report detailing the geotechnical results is being prepared by North Rock Mining Solutions Inc. In addition, the hydrogeological data acquired from these holes is being incorporated into the hydrogeological model which will characterize the favourable hydrogeological conditions at Arrow, inclusive of the proposed UGTMF area. Both reports will be incorporated into to the Feasibility Study and Environmental Assessment for the Arrow Deposit.

 

Development, Activities & Financial

 

  • Phase I results are all pending final assays and will be released as received and finalized. The commencement of Phase II is pending final compilation and analysis of all Phase I drilling results. All programs for the Feasibility Study (H1 2020) and Environmental Assessment (H2 2020) are ongoing and on schedule.
  • NexGen commenced an Environmental Assessment on the Rook I Project on April 29, 2019 in accordance with the requirements of both the Environmental Assessment Act and the Canadian Environmental Assessment Act, 2012 (“CEAA 2012”) after receiving acceptance of the Rook I Project Description (Technical Proposal) by the Canadian Nuclear Safety Commission (“CNSC”) and the Saskatchewan Ministry of Environment (“SMOE”). In addition, NexGen filed an Initial Licence Application with the CNSC under the Nuclear Safety and Control Act in order to obtain a Licence to Prepare Site and Construct for the Project.
  • NexGen welcomes the conclusion of the  section 232 investigation as reported on July 12, 2019 by Presidential Memoranda by which the President of the United States determined that he did not believe uranium imports threaten to impair the national security of the United States.  With the conclusion in hand and support for the entire nuclear energy sector in the United States, many industry observers have reported market activity and utility demand interest has already increased since mid-July for spot and mid-term delivery.
  • As of July 31, 2019, the Company had cash-on-hand of approximately $80 million which fully funds NexGen for all drilling, feasibility and development programs planned this year.

 

Leigh Curyer, Chief Executive Officer, commented: “The dual purpose 2019 Phase I drilling has produced another batch of exceptional radio activity results highlighting Arrow’s unique high grade continuity throughout the ore body, and from a development perspective, highly favourable ground conditions for the proposed mine plan and UGTMF. I would like to take the opportunity to congratulate the NexGen team on the speed, accuracy, efficiency and elite standards in executing Phase I ground work whilst in tandem successfully advancing permitting and community objectives. It’s an exciting time at NexGen and the dedication of the team inclusive of our valued service providers, community members and government is outstanding.”

 

Troy Boisjoli, Vice-President, Operations and Project Development, commented: “Today’s release represents a great milestone for the Project as this last batch of Phase I holes continues to show the clear continuity of high-grade mineralization across the A2 and A3 shears. These radioactivity results are particularly impressive considering the advanced shallow angle of interception into the sub-vertical Arrow orebody that AziDrill has been able to deliver over prior drill programs at Arrow. In addition, the preliminary geotechnical and hydrogeological field results indicating highly competent ground conditions for sound extraction is excellent. The strength of the Arrow resource and proposed mine plan has been further validated with the completion of the 2019 Phase 1 drill program. We look forward to incorporating all these results into an updated mineral resource, Feasibility Study and Environmental Assessment for submission.”

 

Table 1: Arrow Deposit Drill Hole Data

 

 

Drill Hole Athabasca Group –
Basement Unconformity
Depth (m)
Handheld Scintillometer Results
(RS-120/125)
Hole ID Azimuth Dip Total
Depth (m)
From
(m)
To (m) Width
(m)
CPS Range
AR-19-251c1 327 -65 577.50 141.25 480.00 481.00 1.00  
          503.00 506.50 3.50  
          520.00 521.00 1.00  
          523.50 524.50 1.00  
          531.00 532.50 1.50 4000 –  61000
          537.00 539.00 2.00  
          543.00 545.00 2.00  
          556.50 557.00 0.50  
AR-19-251c2 327 -65 666.50 N/A 424.50 425.00 0.50  
          463.00 465.00 2.00  
          470.00 483.50 13.50  
          486.00 501.00 15.00  
          512.00 514.00 2.00  
          581.50 594.00 12.50  
          597.50 600.00 2.50  
          608.00 609.00 1.00  
          611.50 612.50 1.00  
          623.00 627.50 4.50  
          646.00 647.50 1.50  
AR-19-252c1 327 -65 756.50 129.40 483.50 484.00 0.50  
          502.50 503.00 0.50  
          507.00 508.00 1.00  
          513.50 515.00 1.50  
          559.00 560.00 1.00 600 –  47600
          564.50 565.00 0.50  
          574.00 577.50 3.50  
          580.50 587.50 7.00  
          600.00 600.50 0.50  
          610.50 620.50 10.00  
          633.00 635.00 2.00  
          642.00 648.50 6.50  
          652.50 653.00 0.50 520 –  860
          661.50 662.00 0.50  
          664.50 665.00 0.50  
          667.50 679.00 11.50  
          685.50 695.50 10.00  
          699.00 699.50 0.50  
          703.50 705.50 2.00  
          721.50 724.50 3.00  
AR-19-252c2 327 -65 801.50 N/A 487.50 489.00 1.50  
          509.50 511.50 2.00  
          543.00 543.50 0.50  
          546.00 547.00 1.00  
          559.00 559.50 0.50  
          576.50 584.00 7.50  
          589.50 592.50 3.00  
          595.50 604.00 8.50  
          606.50 611.00 4.50  
          620.00 628.00 8.00  
          634.00 634.50 0.50  
          637.50 650.50 13.00  
          656.00 657.00 1.00  
          661.00 669.00 8.00  
          676.00 703.00 27.00  
          723.50 729.50 6.00  
          738.00 738.50 0.50  
          745.00 746.00 1.00  
          755.50 757.00 1.50  
          777.50 779.50 2.00  
AR-19-252c3 327 -65 804.50 N/A 496.50 497.00 0.50  
          515.50 521.50 6.00  
          528.00 530.00 2.00  
          551.00 555.00 4.00  
          567.50 568.00 0.50  
          580.50 581.50 1.00  
          590.50 593.50 3.00  
          606.00 607.00 1.00  
          612.50 621.00 8.50  
          623.50 646.00 22.50  
          649.50 657.00 7.50  
          663.50 671.00 7.50  
          674.00 681.00 7.00  
          684.00 700.00 16.00  
          702.50 704.00 1.50  
          706.50 711.50 5.00  
          718.50 729.50 11.00  
          738.00 739.00 1.00 1200 –  47900
          750.00 755.00 5.00  
          774.00 776.00 2.00  
          783.50 784.50 1.00  
AR-19-253c1 327 -65 712.00 125.45 442.50 443.50 1.00  
          528.00 528.50 0.50  
          537.00 540.50 3.50  
          558.50 560.00 1.50  
          568.00 573.00 5.00  
          580.00 584.00 4.00  
          587.50 589.50 2.00  
          594.50 595.00 0.50  
          623.50 624.00 0.50  
          639.50 672.00 32.50  
          681.00 683.00 2.00  
          690.00 696.00 6.00  
AR-19-253c2 327 -65 744.50 N/A 442.00 442.50 0.50  
          506.00 507.50 1.50  
          538.50 541.50 3.00  
          547.00 548.00 1.00  
          552.50 558.50 6.00  
          568.50 569.00 0.50 660 –  3150
          583.50 585.00 1.50  
          591.50 592.00 0.50  
          606.00 609.00 3.00  
          635.50 640.50 5.00  
          651.00 685.00 34.00  
          687.50 688.50 1.00  
          692.50 701.00 8.50  
          706.50 709.50 3.00  
          742.00 742.50 0.50  
AR-19-254c1 327 -65 684.50 133.10 479.00 480.00 1.00  
          522.00 522.50 0.50  
          527.50 528.00 0.50  
          533.50 534.00 0.50  
          616.50 625.00 8.50  
          631.50 641.00 9.50  
          649.00 651.50 2.50  
          657.00 663.00 6.00  
AR-19-254c2 327 -65 699.50 N/A 468.50 469.00 0.50  
          471.50 472.00 0.50  
          483.50 484.00 0.50 700 –  13100
          514.50 515.00 0.50  
          528.00 529.50 1.50  
          533.00 534.50 1.50  
          538.50 539.50 1.00  
          542.50 550.50 8.00  
          609.50 610.00 0.50  
          622.00 623.50 1.50  
          628.00 658.00 30.00  
          665.50 670.00 4.50  
AR-19-255c1 327 -65 609.50 122.40 505.00 506.00 1.00  
          510.50 513.00 2.50  
          520.00 523.50 3.50  
          545.50 565.00 19.50  
          568.50 569.00 0.50 670 –  2000
          588.00 589.00 1.00  
AR-19-255c2 327 -65 609.50 N/A 523.00 523.50 0.50  
          526.00 532.50 6.50  
          551.00 561.50 10.50  
          565.00 568.00 3.00  
          579.00 579.50 0.50  
          582.00 587.50 5.50  
AR-19-255c3 327 -65 626.00 N/A 436.50 437.00 0.50  
          454.00 454.50 0.50 850 –  1300
          504.00 507.50 3.50  
          510.50 511.50 1.00  
          514.00 520.50 6.50  
          528.00 530.00 2.00  
          533.50 535.50 2.00  
          538.50 539.50 1.00  
          549.00 550.00 1.00  
          567.50 584.50 17.00  
          587.50 589.50 2.00  
          603.00 603.50 0.50 570 –  1240
          606.00 606.50 0.50  
AR-19-256c1 327 -65 537.00 141.00 453.50 456.50 3.00  
          467.00 467.50 0.50 800 –  27000
          471.50 472.50 1.00  
          478.00 512.00 34.00  
AR-19-256c2 327 -65 552.50 N/A 457.50 458.50 1.00  
          463.00 467.50 4.50  
          470.00 470.50 0.50  
          474.00 476.00 2.00  
          480.00 481.00 1.00 750 –  13000
          484.50 485.00 0.50  
          488.00 489.00 1.00  
          492.00 516.50 24.50  
AR-19-256c3 327 -65 705.20 N/A 461.50 462.00 0.50  
          469.00 471.50 2.50  
          479.00 481.00 2.00  
          483.50 484.00 0.50  
          487.00 487.50 0.50  
          491.00 491.50 0.50 3400 –  61000
          501.00 505.50 4.50  
          512.00 513.50 1.50  
          516.50 527.00 10.50  
          543.50 544.00 0.50  
          547.50 550.50 3.00  
          655.50 660.50 5.00  
          674.50 678.00 3.50  
          698.00 698.50 0.50  
AR-19-257c1 327 -65 651.50 120.50 480.00 481.50 1.50  
          524.00 524.50 0.50  
          536.00 538.00 2.00  
          553.00 554.00 1.00  
          561.50 563.00 1.50  
          570.00 571.00 1.00  
          586.00 594.50 8.50  
          601.50 602.50 1.00  
          614.50 617.00 2.50  
          622.50 631.50 9.00  
AR-19-257c2 327 -65 666.50 N/A 526.00 527.50 1.50  
          549.00 550.00 1.00  
          560.00 564.50 4.50  
          582.00 582.50 0.50  
          598.00 600.00 2.00  
          611.00 612.50 1.50  
          637.00 641.50 4.50  
AR-19-257c3 327 -65 654.50 N/A 482.50 483.00 0.50  
          487.00 487.50 0.50  
          491.00 491.50 0.50  
          517.50 518.50 1.00  
          526.00 527.00 1.00  
          539.50 542.50 3.00  
          546.50 547.50 1.00  
          555.50 557.00 1.50  
          568.50 571.00 2.50  
          584.00 585.00 1.00  
          587.50 597.00 9.50  
          600.00 600.50 0.50  
          606.00 612.00 6.00  
          614.50 621.00 6.50  
          624.50 630.50 6.00  
AR-19-257c4 327 -65 666.50 N/A 485.00 485.50 0.50  
          490.00 491.50 1.50  
          517.00 528.00 11.00  
          559.50 560.50 1.00  
          564.50 565.00 0.50  
          570.00 571.00 1.00  
          573.50 574.00 0.50  
          598.00 598.50 0.50 3700 –  30400
          606.00 606.50 0.50  
          610.00 610.50 0.50  
          621.00 630.50 9.50  
          637.00 644.00 7.00  
AR-19-258c1 327 -65 495.50 138.05 418.00 419.00 1.00  
          436.00 447.50 11.50  
          452.50 462.00 9.50  
          466.50 470.50 4.00  
          476.50 481.50 5.00  
          484.00 487.50 3.50  
          493.50 495.50 2.00  
AR-19-258c2 327 -65 501.50 N/A 413.50 414.00 0.50 550 –  6700
          419.00 419.50 0.50  
          427.00 428.00 1.00 1350 –  38700
          446.50 480.50 34.00  
          485.00 489.50 4.50  
          494.50 496.00 1.50  
          501.00 501.00 0.00  
AR-19-259c1 327 -65 651.50 127.95 456.00 457.00 1.00  
          460.50 461.00 0.50  
          483.00 490.00 7.00  
          508.50 509.00 0.50  
          583.50 596.00 12.50  
          598.50 607.00 8.50  
          613.00 613.50 0.50  
          616.50 621.50 5.00  
AR-19-259c2 327 -65 666.50 N/A 462.50 463.00 0.50  
          493.00 494.00 1.00  
          502.50 503.50 1.00  
          508.00 508.50 0.50  
          524.00 525.00 1.00  
          565.00 566.00 1.00  
          596.50 604.00 7.50  
          607.50 609.00 1.50  
          614.50 619.50 5.00  
          628.00 628.50 0.50  
          631.00 634.50 3.50  
          637.50 638.50 1.00  
AR-19-260c1 327 -65 600.50 126.00 436.50 437.00 0.50  
          454.00 454.50 0.50  
          470.00 470.50 0.50  
          476.50 477.50 1.00  
          481.00 481.50 0.50  
          493.50 495.50 2.00  
          500.00 503.00 3.00  
          507.50 508.00 0.50  
          527.50 548.50 21.00  
AR-19-260c2 327 -65 597.50 N/A 475.00 476.00 1.00  
          483.00 484.00 1.00  
          490.50 491.50 1.00  
          494.00 494.50 0.50  
          498.00 498.50 0.50  
          502.00 504.50 2.50  
          515.50 516.00 0.50  
          521.00 544.00 23.00  
AR-19-261c1 327 -65 765.50 120.80 195.50 196.00 0.50  
          541.50 542.50 1.00  
          553.50 559.00 5.50  
          563.00 564.00 1.00  
          567.00 568.00 1.00  
          575.00 575.50 0.50 2000 –  50000
          578.50 579.50 1.00  
          594.50 595.00 0.50  
          608.00 616.00 8.00  
          621.50 623.50 2.00  
          627.50 628.50 1.00  
          631.50 634.50 3.00  
          658.00 662.50 4.50  
          671.50 689.00 17.50  
          695.00 716.00 21.00  
          721.00 722.50 1.50  
AR-19-261c2 327 -65 774.50 N/A 497.50 499.00 1.50  
          520.50 521.00 0.50  
          553.00 554.50 1.50  
          566.00 568.50 2.50  
          571.00 576.50 5.50  
          589.50 592.50 3.00  
          612.50 615.00 2.50  
          626.50 628.00 1.50  
          635.50 638.00 2.50  
          652.50 653.00 0.50  
          666.50 667.50 1.00  
          671.50 687.50 16.00  
          695.00 695.50 0.50  
          698.00 699.00 1.00  
AR-19-262c1 327 -65 636.50 125.00 484.50 485.00 0.50  
          492.00 492.50 0.50  
          503.00 506.50 3.50  
          516.00 521.50 5.50  
          560.50 573.50 13.00  
          576.50 577.00 0.50  
          585.00 593.50 8.50  
          596.00 599.50 3.50  
          602.00 604.50 2.50  
          607.50 617.00 9.50  
AR-19-262c2 327 -65 648.50 N/A 494.50 497.00 2.50  
          506.00 509.50 3.50  
          517.00 518.00 1.00  
          520.50 521.00 0.50  
          526.00 527.00 1.00  
          537.00 537.50 0.50  
          558.50 559.00 0.50  
          568.50 576.50 8.00  
          580.50 583.00 2.50  
          592.00 594.00 2.00  
          600.50 620.00 19.50  
          626.50 628.00 1.50  
AR-19-262c3 327 -65 654.50 N/A 492.50 493.50 1.00  
          496.00 497.00 1.00  
          502.00 502.50 0.50  
          505.50 507.50 2.00  
          532.50 533.50 1.00  
          555.50 556.50 1.00  
          577.50 597.00 19.50  
          601.00 601.50 0.50  
          605.50 608.00 2.50  
          614.50 615.00 0.50  
          617.50 627.00 9.50  
          634.50 637.00 2.50  
          640.00 642.50 2.50  
AR-19-263c1 325 -65 662.00 136.30 539.00 546.00 7.00  
          557.50 558.00 0.50  
          566.50 568.50 2.00  
          575.50 590.00 14.50  
          594.50 595.50 1.00  
          598.50 602.00 3.50  
          605.00 611.50 6.50  
          614.50 638.50 24.00  
          641.00 644.00 3.00  
AR-19-263c2 325 -65 666.50 N/A 540.00 545.00 5.00  
          560.00 582.50 22.50  
          590.50 592.50 2.00  
          605.00 611.00 6.00  
          619.00 627.50 8.50  
          634.00 636.50 2.50  
          640.50 641.00 0.50  
          644.50 645.50 1.00  
AR-19-263c3 325 -65 669.50 N/A 535.00 536.00 1.00  
          547.00 550.50 3.50  
          567.50 568.50 1.00  
          573.00 573.50 0.50  
          581.50 584.00 2.50  
          589.00 594.50 5.50  
          597.00 598.50 1.50  
          601.50 604.50 3.00  
          614.00 619.50 5.50  
          622.00 626.00 4.00  
          631.00 654.00 23.00  
          656.50 660.50 4.00  
AR-19-264c1 327 -65 759.50 124.85 503.00 503.50 0.50  
          532.00 534.00 2.00  
          541.00 541.50 0.50 500 –  6300
          564.50 565.00 0.50  
          572.00 572.50 0.50  
          580.50 581.50 1.00  
          591.50 596.00 4.50  
          598.50 599.00 0.50  
          606.00 606.50 0.50  
          610.00 610.50 0.50  
          621.00 622.00 1.00  
          641.50 645.50 4.00  
          657.00 658.00 1.00  
          663.50 664.50 1.00  
          669.00 681.00 12.00  
          686.50 690.50 4.00  
          694.00 707.00 13.00  
          711.00 730.50 19.50  
          757.00 757.50 0.50  
AR-19-264c2 327 -65 789.50 N/A 535.50 536.00 0.50 2500 –  39000
          580.00 581.00 1.00  
          585.50 587.50 2.00  
          593.00 595.50 2.50  
          600.50 604.50 4.00  
          615.50 616.00 0.50  
          623.00 630.50 7.50  
          638.00 638.50 0.50  
          646.00 647.50 1.50  
          652.00 652.50 0.50  
          667.50 668.50 1.00  
          677.00 696.00 19.00  
          701.00 714.00 13.00  
          717.00 728.50 11.50  
          731.00 735.00 4.00  
          742.00 746.50 4.50  
          749.00 749.50 0.50  
          753.50 755.00 1.50  
          775.00 776.50 1.50  
AR-19-265c1 327 -65 615.50 125.20 456.00 458.00 2.00  
          479.00 480.50 1.50  
          484.50 486.00 1.50  
          490.00 492.50 2.50  
          500.00 503.00 3.00  
          510.00 511.50 1.50  
          515.00 516.50 1.50  
          529.50 556.50 27.00  
          560.50 569.00 8.50  
          571.50 579.50 8.00  
          591.50 592.50 1.00 560 –  7100
AR-19-265c2 327 -65 627.50 N/A 445.00 445.50 0.50  
          475.50 484.00 8.50  
          497.50 498.50 1.00  
          501.00 501.50 0.50  
          508.50 509.00 0.50  
          516.00 516.50 0.50  
          522.50 523.00 0.50  
          532.00 532.50 0.50  
          535.50 570.50 35.00  
          573.50 577.00 3.50  
          588.00 590.00 2.00  
          594.00 597.50 3.50  
          600.50 606.50 6.00  

 

Parameters:
   
•  Maximum internal dilution 2.00 m downhole
•  All depths and intervals are metres downhole, true thicknesses are yet to be determined
•  “Anomalous” means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
•  “Off-scale” means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
•  Where “Min cps” is
•  Directional drilling has often resulted in mineralization intersected at a more favourable and shallower dip
•  If a drill hole deviates from a target a section of the drill hole may need to be re-drilled – this can potentially cause small discrepancies (in metres) between the reported total length of a drill hole (depth at end of hole minus the starting depth) and the actual number of metres drilled for a given drill hole.

 

 

About NexGen

 

NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production. 

 

NexGen owns a portfolio of prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada; including a 100% interest in Rook I, location of the Arrow Deposit discovered in February 2014, the Bow discovery in March 2015, the Harpoon discovery in August 2016 and the Arrow South discovery in July 2017. NexGen is the recipient of the PDAC’s 2018 Bill Dennis Award and the 2019 Environmental and Social Responsibility Award.

 

Technical Disclosure

 

The technical information in this news release with respect to the PFS has been reviewed and approved by Paul O’Hara, P.Eng. of Wood., David Robson, P.Eng., M.B.A., and Jason Cox, P.Eng. of RPA, each of whom is a “qualified person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects

 

The Mineral Resource Estimate was completed by Mr. Mark Mathisen, C.P.G., Senior Geologist at RPA and Mr. David Ross, P.Geo., Director of Resource Estimation and Principal Geologist at RPA.  Both are independent Qualified Persons in accordance with the requirements of National Instrument (NI) 43-101 and they have approved the disclosure herein. All other technical information in this news release has been approved by Mr. Troy Boisjoli, Geoscientist Licensee, Vice President – Operations & Project Development for NexGen.  Mr. Boisjoli is a qualified person for the purposes of NI 43-101 and has verified the sampling, analytical, and test data underlying the information or opinions contained herein by reviewing original data certificates and monitoring all of the data collection protocols.  All other technical information in this news release has been approved by Mr. James Hatley, a Professional Engineer, Senior Vice-President – Project Development for NexGen.  Mr. Hatley is a qualified person for the purposes of NI 43-101 and has reviewed the underlying the information or opinions contained herein on mine design.

 

A technical report in respect to the PFS is filed on SEDAR (www.sedar.com) and EDGAR (www.sec.gov/edgar.shtml) and is available for review on NexGen Energy’s website (www.nexgenenergy.ca).

 

 


Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

 

Posted August 7, 2019

Share this news article

MORE or "UNCATEGORIZED"


KOOTENAY SILVER CLOSES BROKERED PUBLIC OFFERING FOR GROSS PROCEEDS OF C$10.35 MILLION

Kootenay Silver Inc. (TSX-V: KTN) is pleased to announce that the... READ MORE

April 25, 2024

U.S. Gold Corp. Closes $4.9 Million Non-Brokered Registered Direct Offering

U.S. Gold Corp. (NASDAQ: USAU), is pleased to announce that it h... READ MORE

April 25, 2024

Getchell Gold Corp. Announces Final Tranche of Debenture Financing

Getchell Gold Corp. (CSE: GTCH) (OTCQB: GGLDF) (FWB: GGA1) is ple... READ MORE

April 25, 2024

Imperial Reports Production Update for 2024 First Quarter

Imperial Metals Corporation (TSX:III) reports quarterly copper an... READ MORE

April 25, 2024

ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

ALX Resources Corp. (TSX-V: AL) (FSE: 6LLN) (OTC: ALXEF) is pleas... READ MORE

April 25, 2024

Copyright 2024 The Prospector News