The Prospector News

NevGold Intercepts 2.19 g/t Oxide Au Over 61.6 Meters, Including 8.51 g/t Oxide Au Over 11.6 Meters at Limousine Butte

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

NevGold Intercepts 2.19 g/t Oxide Au Over 61.6 Meters, Including 8.51 g/t Oxide Au Over 11.6 Meters at Limousine Butte

 

 

 

 

NevGold Corp. (TSX-V:NAU) (OTCQB:NAUFF) (Frankfurt:5E50) is pleased to announce that it has received assays from the first four holes of the drilling program at its Limousine Butte Project, Nevada located on the southern part of the Carlin Trend. The initial holes are part of the Company’s inaugural 10,000 meter drill program at the Project and further assays from the program are expected shortly. Drill results will continue to be released for the remainder of the first half of 2022.

 

Key Highlights

  • Defining a Near-Surface, High-Grade, Oxide Gold Resource: the drill program is focused on building a near-surface oxide gold resource while expanding the mineralization laterally along strike and at depth. The results received to date, including 2.19 g/t oxide Au over 61.6 meters including 8.51 g/t oxide Au over 11.6 meters, and 1.30 g/t oxide Au over 44.4 meters including 3.11 g/t oxide Au over 11.1 meters, have confirmed the near-surface, high-grade oxide gold mineralization at Limousine Butte.
  • Highly Oxidized Mineralization: assay results from Holes 1-4 report near-surface oxidized mineralization throughout all of the drill holes completed.
  • Open Mineralization: mineralization is open along strike and at depth with numerous untested targets that will be drilled in current and future drill programs.
  • Improved Geological Model: utilizing a core rig has improved confidence in the geological model as the Company advances towards an updated mineral resource estimate for the Project.
  • Second Drill Rig Added: as per the News Release on January 19, 2022, the Company currently has two drill rigs on site, one core rig and one Reverse Circulation rig (“RC”). The RC rig was recently added to expedite the drill program and drill both the Resurrection Ridge and Cadillac Valley targets simultaneously.

 

NevGold CEO, Brandon Bonifacio, comments: “The initial assays from our inaugural drill program at Limousine Butte highlight the near-surface oxide gold nature of mineralization at the project. It is very exciting to see thick intercepts of multi-gram oxide gold material, which is a key indicator of a strongly mineralized system. We are advancing to a near-surface oxide gold resource, which remains open in all directions. The remaining drilling will continue to test the various deposits within our large, 66.5 square kilometer land package with the goal of driving towards a multi-million ounce oxide gold resource base. We eagerly await results from further drilling and thank our Nevada Team for their hard work delivering on the drill program in a safe, expedited fashion.”

 

NevGold Chief Geologist, Derick Unger, comments: “We are very encouraged by this initial data from our drill program at Limousine Butte and expect similar results from the remaining holes over the coming months. Exploration is very active in Nevada, and we are fortunate to have received these results in such a timely manner. The information provided by these core holes has greatly improved the geological model at Limousine Butte. We see many areas with strong mineralization potential that have not been given a proper look using modern exploration methods and applying the latest geologic knowledge. The current program will test the boundaries of mineralization, initially focusing on the Resurrection Ridge and Cadillac Valley targets, which will drive advancement towards a near-surface oxide gold mineral resource estimate.”

Drill Results

 

Hole ID Length, m* g/t Au From, m To, m Material Target Area
LB21-001 44.4** 1.30 23.3 67.7 Oxide Resurrection Ridge
including 11.1 3.11 26.7 37.8    
LB21-002 78.9 0.65 39.3 118.3 Oxide Resurrection Ridge
including 25.0 1.45 49.7 74.7    
LB21-003 37.8 1.17 44.8 82.6 Oxide Resurrection Ridge
including 11.3 2.99 68.6 79.9    
LB21-004 61.6 2.19 81.7 143.3 Oxide Resurrection Ridge
including 11.6 8.51 116.7 128.3    

 

*Downhole thickness is reported; true width varies depending on drill hole dip and is generally 70% to 90% of downhole thickness.
**Interval includes 2.9 meters of no core recovery.

 

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

Figure 1 – Cross-section looking north-northwest through Resurrection Ridge. Red dashed lines represent Au zones of 0.1 g/t defined from historical drilling. Orange dashed lines represent areas with additional mineralization potential.  To view image please click here

 

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

 

Figure 2 – Plan view of the Resurrection Ridge area at Limousine Butte. Red dashed lines represent Au zones of 0.1g/t defined from historical drilling. Limited historical drilling outside these zones indicates the potential for additional mineralization. To view image please click here

 

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

 

Figure 3 – Photo of oxidized jasperoid breccia from LB21-004, interval 394 – 398 feet (120.1 – 121.3 meters) returned a value of 17.3 g/t Au, surrounding intervals ranged from 8.6 – 12.8 g/t Au. To view image please click here

 

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

 

Figure 4 – Plan view of the Limousine Butte district, including other active exploration projects. Both the Resurrection Ridge and Cadillac Valley areas are currently being drilled as per the January 19, 2022 news release. To view image please click here

 

Engagement of IR Consultant and Grant of Stock Options

The Company has engaged Paradox Public Relations Inc. based in Montreal to provide investor relations services. The agreement has a term of up to 36 months, effective February 8, 2022 and may be terminated at any time without charge by either party by giving 30 days’ notice in writing. Paradox will be paid a monthly fee of C$10,000 and will be granted 260,000 options with a three year term vesting in four equal quarterly tranches over twelve months, in accordance with the Company’s stock option plan and Policy 3.4 of the TSX-V. The options will be priced in the context of the market. The Investor Relations Agreement and granting of stock options are subject to TSX Venture approval.

 

About the Company

NevGold is an exploration and development company targeting large-scale mineral systems in the proven districts of Nevada and British Columbia. NevGold owns a 100% interest in the Limousine Butte and Cedar Wash gold projects in Nevada, and the Ptarmigan silver-polymetallic project in Southeast BC.

Posted February 8, 2022

Share this news article

MORE or "UNCATEGORIZED"


Search Minerals Inc. Completes $1M Convertible Note Financing with Closing of Second Tranche in the Amount of $700,000

Search Minerals Inc. (TSX-V: SMY)  is pleased to announce that i... READ MORE

November 1, 2024

NEW FOUND REPORTS POSITIVE PHASE II METALLURGICAL TEST RESULTS DEMONSTRATING 97% GOLD EXTRACTION AT ICEBERG AND ICEBERG EAST

New Found Gold Corp. (TSX-V: NFG) (NYSE-A: NFGC) is pleased to re... READ MORE

November 1, 2024

GoldHaven Enters into Definitive Agreement to Acquire BC Gold & Copper Assets

GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS0) ... READ MORE

November 1, 2024

Eldorado Gold Reports Q3 2024 Financial and Operational Results; Tightens 2024 Operating Guidance

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) reports the Comp... READ MORE

November 1, 2024

Centerra Gold Reports Third Quarter 2024 Results; Consistent Operating Performance Drives Continued Strong Cash Flow From Operations

Centerra Gold Inc. (TSX: CG) (NYSE: CGAU) reported its third quar... READ MORE

November 1, 2024

Copyright 2024 The Prospector News