The Prospector News

Montage Gold Closes First Tranche of Investment in African Gold

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Montage Gold Closes First Tranche of Investment in African Gold

 

 

 

 

 

Montage Gold Corp. (TSX-V: MAU) (OTCQX: MAUTF) is pleased to announce the closing of the first tranche of its previously announced strategic investment in African Gold Limited (ASX:A1G).

 

The strategic partnership transaction consists of a share exchange transaction between Montage and African Gold including the issuance to Montage of 92,377,787 fully paid ordinary shares of African Gold at deemed issue price of A$0.07 per African Gold Ordinary Share, and the issuance to African Gold of 2,026,388 common shares of Montage at a deemed issue price of C$2.87 per Montage Common Share. Montage and African Gold have closed Tranche 1 of the Share Exchange Transaction resulting in the issuance of 46,019,641 African Gold Ordinary Shares to Montage, and the issuance to African Gold of 1,009,481 Montage Common Shares. The Montage Common Shares issued to African Gold are subject to a 4-month hold period that expires on August 8, 2025.

 

In connection with the Share Exchange Transaction, Montage and African Gold have entered into a Share Subscription Agreement, through which Montage is entitled to certain investor rights provided that Montage maintains a 9% ownership in African Gold until the completion of Tranche 2 and 10% thereafter. Furthermore, Montage and African Gold have entered into a Project Rights Agreement, through which Montage is entitled to certain project-related rights as stated in the press release dated March 24, 2025.

 

The second tranche of the Share Exchange Transaction is expected to close in Q2-2025 as it is subject to an African Gold shareholder vote.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

ABOUT MONTAGE GOLD

Montage Gold Corp. is a Canadian-listed company focused on becoming a premier multi-asset African gold producer, with its flagship Koné project, located in Côte d’Ivoire, at the forefront. Based on the Updated Feasibility Study published in 2024 (the “UFS”), the Koné project has an estimated 16-year mine life and sizeable annual production of +300koz of gold over the first 8 years and is expected to enter production in Q2-2027.

 

QUALIFIED PERSONS STATEMENT

The scientific and technical contents of this press release have been verified and approved by Silvia Bottero, BSc, MSc, a Qualified Person pursuant to NI 43-101. Mrs. Bottero, EVP Exploration of Montage, is a registered Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), a member of the Geological Society of South Africa and a Member of AusIMM.

 

Posted April 7, 2025

Share this news article

MORE or "UNCATEGORIZED"


Silver Elephant Received US$1.4 Million in Cash Proceeds from Apuradita Silver Concentrate Sales in 2026

Silver Elephant Mining Corp. (TSX: ELEF) (OTCQB: SILEF) (FSE: 1P... READ MORE

August 21, 2026

Bunker Hill and Silver47 Announce Merger to Create a ‘Made in America’ U.S. Silver & Critical Minerals Champion

Bunker Hill Mining Corp. (TSX: BNKR) (OTCQB: BHLL), and Silver47 ... READ MORE

August 21, 2026

Goliath Reports Multiple Holes Up To 7.38 g/t AuEq Over 35.7 Meters, Including 19.51 g/t AuEq Over 8.32 Meters at the High-Grade Gold Surebet Discovery that Remains Open for Expansion, Golden Triangle, B.C.

Drill hole GD-26-436 from the Surebet Zone, intersected an extens... READ MORE

August 21, 2026

IMPACT Silver Reports Q2 2026 Results: Revenue Increased by 124%, Gross Profit up 756% on Silver Leverage, Higher Grades

IMPACT Silver Corp. (TSX-V: IPT) (OTCQB: ISVLF) (FSE: IKL) anno... READ MORE

August 21, 2026

Osisko Gold Announces Amendment to US$450 Million Appian Credit Facility and Satisfaction of Key Technical Conditions Precedent Following Successful Completion of the Lowhee Infill Drill Program at the Cariboo Gold Project

HIGHLIGHTS Appian confirms satisfaction of certain key technical ... READ MORE

August 21, 2026

Copyright 2026 The Prospector News