The Prospector News

Mining Americas Inc. Reports Second Quarter 2026 Gold Production

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Mining Americas Inc. Reports Second Quarter 2026 Gold Production

 

 

 

 

 

Mining Americas Inc. (TSX: MAI) (OTCQX: MAIFF) is pleased to announce preliminary production results for the three months ended June 30, 2026  from the Company’s 100%-owned Pan gold mine in White Pine County, Nevada. All amounts are stated in United States dollars, unless otherwise stated.

 

Mining Americas CEO, Darren Blasutti, commented, “Second quarter gold production of 8,137 ounces was on budget for our 2026 mine plan at the Pan mine, and represents 16,871 ounces of gold production year to date. Since introducing the new mining contractor at the start of the year, mining rates at Pan successfully ramped up to over 80,000 tonnes per day, as compared with 55,000 tonnes per day previously. As a result, we look forward to higher gold production in the second half of 2026, in line with our budget. The Pan mine also recently achieved an important milestone of five years with no lost time incidents, which is a testament to the operating team’s daily commitment to safety.”

 

The Pan mine produced 8,137 ounces of gold and sold 8,249 ounces in Q2 2026, in line with the Company’s budget. As previously reported, the new mine plan adopted in early 2026 required additional pushbacks near the limits of mineralized zones, resulting in a modest decrease in mined grade and associated gold production for Q2 2026.

 

The new mining contractor started on site at the Pan mine at the start of 2026, and by the end of Q2 2026 had successfully ramped up to a mining rate of over 80,000 tonnes per day, as compared with approximately 55,000 tonnes per day previously.

 

Gold production in the second half of 2026 is anticipated to be higher than the first half, benefitting from higher mining rates as well as increased waste stripping completed in Q2 2026. Production guidance for the full-year 2026 remains unchanged at between 32,000 and 38,000 ounces of gold.

 

The Pan mine recently achieved an important milestone of five years with no lost time incidents, which is a testament to the operating team’s daily commitment to safety.

 

The Company’s unaudited cash balance was $44 million as of June 30, 2026, compared to $46 million on March 31, 2026. In addition to increased waste stripping in the quarter, certain non-recurring items impacting the cash balance included an annual income tax instalment and a bonding payment for the Gold Rock project. In addition, project expenditures on the Company’s Copperstone project ramped up in Q2 2026. The Company anticipates releasing full operational and financial results for Q2 2026 in mid-August 2026.

 

Qualified Person

 

The scientific and technical information contained in this news release has been reviewed and approved by President & COO Mr. Darren Koningen, P.Eng., who is the Company’s Qualified Person under National Instrument 43-101.

 

About Mining Americas

 

Mining Americas Inc. (formerly Minera Alamos Inc.) is a growing North American gold production and development company with projects in Nevada, Arizona, and Mexico. The Company owns the Pan Operating Complex in White Pine County, Nevada, comprised of the producing Pan mine and the adjacent permitted Gold Rock project.

 

The Company also owns the Copperstone project in La Paz County, Arizona, a permitted, advanced underground gold project. The Company maintains a portfolio of high-quality Mexican assets, including the Cerro de Oro project, an open pit heap leach gold development project in northern Zacatecas.

 

The Company’s strategy is to become a leading, U.S.-focused intermediate gold producer by growing production at its Pan Operating Complex and developing its pipeline of high-quality, low-capital projects while expanding gold resources across its portfolio.

 

Posted July 14, 2026

Share this news article

MORE or "UNCATEGORIZED"


1911 Gold Reports High-Grade Intercepts from the SAM W Target at True North of 11.31 g/t Au over 1.70 m and 6.79 g/t Au over 2.40 m

1911 Gold Corporation (TSX-V: AUMB) (OTCQX: AUMBF) (FRA: 2KY) is ... READ MORE

August 25, 2026

Minaurum Significantly Expands Quintera Vein Zone with 26 m of 369 g/t AgEq and Europa Sur Returns 3.4 m of 589 g/t AgEq

Minaurum Silver Inc. (TSX-V: MGG) (OTCQX: MMRGF)  is pleased to report ... READ MORE

August 25, 2026

Tectonic Metals Drills 5.09 g/t Au Over 21.34 Metres at Black Creek – Second Gold Centre Emerging at Flat Gold Project, Alaska

Multiple High-Grade Drill Intercepts, Broad Intervals and Holes E... READ MORE

August 25, 2026

Emperor Metals Delivers Another Strong High-Grade Gold Intercept at Duquesne West: 20.1 m of 5.0 g/t Au

Emperor Metals Inc. (CSE: AUOZ) (OTCQB: EMAUF) (FSE: 9NH) is ple... READ MORE

August 25, 2026

NexGold Intersects 3.08 g/t over 17.0 Metres, 4.80 g/t Gold over 5.6 Metres, 84.30 g/t over 1.0 Metres and Expands Drilling Program at the Goldlund Deposit, Ontario

NexGold Mining Corp. (TSX-V: NEXG; OTCQX: NXGCF) is pleased to p... READ MORE

August 25, 2026

Copyright 2026 The Prospector News