The Prospector News

McEwen Mining Announces Q1 2020 Production Results, and Re-Starts Black Fox

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

McEwen Mining Announces Q1 2020 Production Results, and Re-Starts Black Fox

 

 

 

 

 

 

McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) reports consolidated production for Q1 2020 was 29,177 gold ounces and 553,179 silver ounces, or 35,062 gold equivalent ounces(1)  at the average gold:silver price ratio for the quarter of 94:1.

 

Black Fox Mine, Timmins, Canada (100%)

 

In Q1, Black Fox produced 8,328 GEOs. Mining was temporarily suspended at Black Fox on March 26, 2020 for two weeks to allow time for management to evaluate and adapt to operating with the risks associated with the COVID-19 pandemic. Over the course of the shutdown we have implemented rigorous policies and procedures to minimize the potential risks to the health of all individuals at the mine. Our miners and teams are overwhelmingly supportive of returning to work with the new safety measures, and the decision has been made to restart operations immediately.

 

San José Mine, Santa Cruz, Argentina (49%(2))

 

In Q1, San José produced 8,993 gold ounces and 551,872 silver ounces, for a total of 14,864 GEOs. Mining was temporarily suspended from March 20, 2020 due to a nationwide mandatory quarantine imposed in Argentina to combat the spread of COVID-19. Permission has now been granted by the government to restart mining at San José. Hochschild Mining has notified us that they are restarting production, with the expectation that ongoing labor and travel restrictions will mean that the ramp-up will take place over an extended period.

 

Gold Bar Mine, Nevada (100%)

 

In Q1, Gold Bar produced 9,133 GEOs. On March 26, 2020, we announced that operations would be temporarily scaled back for two weeks, contract mining stopped on April 1st, and crushing and stacking stopped on April 4th. Downstream activities such as heap leaching and process plant operation are continuing.

 

El Gallo Project, Sinaloa, Mexico (100%)

 

In Q1, El Gallo produced 2,737 GEOs from residual leaching of the heap leach pad. On April 1, 2020, the Mexican government ordered the temporary closure of all non-essential businesses, including mining, to combat the spread of COVID-19. This order limits some activities at El Gallo but is not expected to have a significant effect on residual leaching.

 

Financial Results

 

Operating costs for the quarter ended March 31, 2020 will be released with our 10-Q Quarterly Financial Statements.

 

Notes:
(1)     ‘Gold Equivalent Ounces’ are calculated based on a 94:1 gold to silver price ratio for Q1 2020.
(2)      The San José Mine is 49% owned by McEwen Mining Inc. and 51% owned and operated by Hochschild Mining plc.

 

Technical Information

 

The technical content of this news release has been reviewed and approved by Peter Mah, P.Eng., COO of McEwen Mining and a Qualified Person as defined by Canadian Securities Administrators National Instrument 43-101 “Standards of Disclosure for Mineral Projects.”

 

Reliability of Information Regarding San José

 

Minera Santa Cruz S.A., the owner of the San José Mine, is responsible for and has supplied to the Company all reported results from the San José Mine. McEwen Mining’s joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates other than MSC do not accept responsibility for the use of project data or the adequacy or accuracy of this release.

 

ABOUT MCEWEN MINING

 

McEwen Mining is a diversified gold and silver producer and explorer with operating mines in Nevada, Canada, Mexico and Argentina. It also owns a large copper deposit in Argentina. McEwen Mining’s goal is to create a profitable gold and silver producer focused in the Americas.

 

McEwen Mining has approximately 400 million shares outstanding. Rob McEwen, Chairman and Chief Owner, owns 20% of the shares.

 

Posted April 14, 2020

Share this news article

MORE or "UNCATEGORIZED"


Elevation Gold Reports Financial Results for Year Ended December 31, 2023, including $66.4M in Total Revenue

Elevation Gold Mining Corporation (TSX-V: ELVT) (OTCQB: EVGDF) i... READ MORE

April 18, 2024

Reunion Gold Announces the Signing of a Mineral Agreement With the Government of Guyana for Its Oko West Project

Reunion Gold Corporation (TSX-V: RGD; OTCQX: RGDFF) is pleased to announ... READ MORE

April 18, 2024

Drilling Confirms 4 km of Favourable Corridor at Lynx Gold Trend

Puma Exploration Inc. (TSX-V: PUMA) (OTCQB: PUMXF) is thrilled to... READ MORE

April 18, 2024

Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update

Grid Metals Corp. (TSX-V:GRDM) (OTCQB:MSMGF) is pleased to announ... READ MORE

April 18, 2024

Azimut and SOQUEM Cut Thick Spodumene Pegmatites at Galinée, James Bay Region, Quebec

Azimut Exploration Inc. (TSX-V: AZM) (OTCQX: AZMTF) is pleased ... READ MORE

April 18, 2024

Copyright 2024 The Prospector News