The Prospector News

Marathon Gold Closes Flow-Through Offering

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Marathon Gold Closes Flow-Through Offering

 

 

 

 

 

Marathon Gold Corporation (TSX: MOZ) is pleased to announce the closing of its previously announced C$6.9 million non-brokered charity flow-through offering at a price of C$1.0488 per flow-through share. Marathon intends to use the proceeds of the Offering for eligible exploration expenditures at its Valentine Gold Project. Franco-Nevada Corporation acquired the common shares comprising the entire back-end of the Offering.

 

About Marathon

 

Marathon is a Toronto based gold company advancing its 100%-owned Valentine Gold Project located in the central region of Newfoundland and Labrador, one of the top mining jurisdictions in the world. The Project comprises a series of five mineralized deposits along a 32-kilometre system. A December 2022 Updated Feasibility Study outlined an open pit mining and conventional milling operation producing 195,000 ounces of gold a year for 12 years within a 14.3-year mine life. The Project was released from federal and provincial environmental assessment in 2022 and construction commenced in October 2022. The Project has estimated Proven Mineral Reserves of 1.43 Moz (23.36 Mt at 1.89 g/t) and Probable Mineral Reserves of 1.27 Moz (28.22 Mt at 1.40 g/t). Total Measured Mineral Resources (inclusive of the Mineral Reserves) comprise 2.06 Moz (29.23 Mt at 2.19 g/t) with Indicated Mineral Resources (inclusive of the Mineral Reserves) of 1.90 Moz (35.40 Mt at 1.67 g/t). Additional Inferred Mineral Resources are 1.10 Moz (20.75 Mt at 1.65 g/t Au). Please see the NI 43-101 Technical Report “Valentine Gold Project, NI 43-101 Technical Report and Feasibility Study” effective November 30, 2022, Marathon’s Annual Information Form for the year ended December 31, 2022 and other filings made with Canadian securities regulatory authorities available at www.sedar.com for further details and assumptions relating to the Valentine Gold Project.

 

Posted July 11, 2023

Share this news article

MORE or "UNCATEGORIZED"


Brazil Potash Presells 91% of Future Production, Catalyzing Construction Financing Phase

Final critical mineral offtake agreement with Kimia Solutions key... READ MORE

October 28, 2025

Midnight Sun Closes Oversubscribed C$30,475,575 "Bought Deal" LIFE Offering

Midnight Sun Mining Corp. (TSX-V: MMA) (OTCQX: MDNGF) is pleased ... READ MORE

October 28, 2025

AbraSilver Drilling at Diablillos Intersects 8.5 Metres at 13.81 g/t Gold at Oculto East

Separate Hole Intersects Broad Zone of 180 m Grading 0.65 g/t Gol... READ MORE

October 28, 2025

Koryx Copper Announces Further Positive Drill Results at the Haib Copper Project, Southern Namibia

Highlights  • Assays reported for a further 17 drill holes for... READ MORE

October 28, 2025

Scottie Resources Announces Impressive Economics in Preliminary Economic Assessment for Scottie Gold Mine Project

Scottie Resources Corp. (TSX-V: SCOT) (OTCQB: SCTSF) (FSE: SR80) ... READ MORE

October 28, 2025

Copyright 2025 The Prospector News