
MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) announces the Company’s consolidated financial results for the year ended December 31, 2024. For details of the audited consolidated financial statements of the Company for the year ended December 31, 2024 and management’s discussion and analysis for the year ended December 31, 2024, please see the Company’s filings on the System for Electronic Document Analysis and Retrieval Plus (“SEDAR+”) at (www.sedarplus.ca) or on the Electronic Data Gathering, Analysis, and Retrieval (“EDGAR”) at (www.sec.gov).
All amounts herein are reported in thousands of United States dollars unless otherwise specified (C$ refers to thousands of Canadian dollars).
KEY HIGHLIGHTS (on a 100% basis unless otherwise noted)
Expansionary capital expenditures for 2025 are estimated between $22 million and $28 million and are related to the installation of the underground conveyor system which is expected to be commissioned in late 2026 supporting expanded mining rates, delivering enhanced efficiencies and mining cost reductions.
CORPORATE
EXPLORATION
JUANICIPIO RESULTS
All results of Juanicipio in this section are on a 100% basis, unless otherwise noted.
Operating Performance
The following table and subsequent discussion provide a summary of the operating performance of Juanicipio for the years ended December 31, 2024 and 2023, unless otherwise noted.
Key mine performance data of Juanicipio (100% basis) | Year ended | |||
December 31, | December 31, | |||
2024 | 2023 | |||
Metres developed (m) | 14,661 | 14,864 | ||
Material mined (t) | 1,342,786 | 1,097,289 | ||
Material processed (t) | 1,328,178 | 1,268,757 | ||
Silver head grade (g/t) | 468 | 472 | ||
Gold head grade (g/t) | 1.25 | 1.27 | ||
Lead head grade (%) | 1.50 | % | 1.14 | % |
Zinc head grade (%) | 2.78 | % | 2.05 | % |
Equivalent silver head grade (g/t) (1) | 712 | 691 | ||
Silver ounces sold (koz) | 16,590 | 15,318 | ||
Gold ounces sold (koz) | 33.11 | 31.73 | ||
Lead pounds sold (klb) | 36,392 | 25,862 | ||
Zinc pounds sold (klb) | 55,609 | 36,881 | ||
Equivalent silver ounces sold (koz) (2) | 23,023 | 20,812 | ||
(1) | Equivalent silver head grades have been calculated using the following price assumptions to translate gold, lead and zinc to “equivalent” silver head grade in 2024: $23/oz silver, $1,950/oz gold, $0.95/lb lead and $1.15/lb zinc (2023: $21.85/oz silver, $1,775/oz gold, $0.915/lb lead and $1.30/lb zinc). | |
(2) | Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to “equivalent” silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Year ended December 31, 2024 realized prices: $28.78/oz silver, $2,430.76/oz gold, $0.92/lb lead and $1.28/lb zinc (year ended December 31, 2023 realized prices: $23.66/oz silver, $1,978.07/oz gold, $0.96/lb lead and $1.15/lb zinc). | |
During year ended December 31, 2024, a total of 1,342,786 tonnes of ore were mined. This represents an increase of 22% over 2023. Increases in mined tonnages at Juanicipio have been driven by the operational ramp-up of the mine towards steady state mining and milling targets.
During the year ended December 31, 2024, a total of 1,328,178 tonnes of ore were processed through the Juanicipio plant. The 5% increase over 2023 was mainly attributable to the Juanicipio plant operating at nameplate per operating day during 2024, following commencement of commercial production in June 2023.
The silver head grade and equivalent silver head grade for the ore processed in the year ended December 31, 2024 was 468 g/t and 712 g/t, respectively (year ended December 31, 2023: 472 g/t and 691 g/t, respectively). The higher silver and lower base metal head grades in the year ended December 31, 2023 were the result of processing ore from higher levels of the mine, characterized by elevated silver grade, compared to deeper areas in the year ended December 31, 2024. 2023 head grades were also impacted by the processing of low-grade commissioning stockpiles through the Juanicipio plant as it was ramped up. Silver metallurgical recovery during the year ended December 31, 2024 was 93% (year ended December 31, 2023: 87%, respectively) reflecting the commencement of commercial pyrite and gravimetric concentrate production during Q2 2024 delivering incremental silver and gold recovery paired with ongoing optimizations in the processing plant.
The following table provides a summary of the total cash costs and all-in sustaining costs of Juanicipio for the years ended December 31, 2024, and 2023.
Key mine performance data of Juanicipio (100% basis) | Year ended | |||
December 31, | December 31, | |||
2024 | 2023 | |||
Total cash costs (1) | 14,539 | 93,025 | ||
Cash cost per silver ounce sold ($/oz) (1) | 0.88 | 6.07 | ||
Cash cost per equivalent silver ounce sold ($/oz) (1) | 8.67 | 10.72 | ||
All-in sustaining costs (1) | 91,839 | 158,151 | ||
All-in sustaining cost per silver ounce sold ($/oz) (1) | 5.54 | 10.32 | ||
All-in sustaining cost per equivalent silver ounce sold ($/oz) (1) | 12.03 | 13.85 | ||
(1) | Total cash costs, cash cost per ounce, cash cost per equivalent ounce, all-in sustaining costs, all-in sustaining cost per ounce, and all-in sustaining cost per equivalent ounce are non-IFRS measures, please see below “Non-IFRS Measures” section and section 12 of the 2024 MD&A for a detailed reconciliation of these measures to the 2024 Financial Statements. Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to “equivalent” silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Year ended December 31, 2024 realized prices: $28.78/oz silver, $2,430.76/oz gold, $0.92/lb lead and $1.28/lb zinc (year ended December 31, 2023 realized prices: $23.66/oz silver, $1,978.07/oz gold, $0.96/lb lead and $1.15/lb zinc). | |
Financial Results
The following table presents excerpts of the financial results of Juanicipio for the years ended December 31, 2024 and 2023.
Year ended | ||||
December 31, | December 31, | |||
2024 | 2023 | |||
$ | $ | |||
Sales | 627,366 | 442,288 | ||
Cost of sales: | ||||
Production cost | (153,521 | ) | (171,830 | ) |
Depreciation and amortization | (91,197 | ) | (68,475 | ) |
Gross profit | 382,648 | 201,983 | ||
Consulting and administrative expenses | (14,319 | ) | (18,768 | ) |
Extraordinary mining and other duties | (10,415 | ) | (4,945 | ) |
Interest expense | (9,538 | ) | (18,524 | ) |
Exchange gains (losses) and other | 4,347 | (2,937 | ) | |
Net income before tax | 352,723 | 156,809 | ||
Income tax expense | (151,181 | ) | (27,381 | ) |
Net income (100% basis) | 201,541 | 129,428 | ||
MAG’s 44% portion of net income | 88,678 | 56,948 | ||
Interest on Juanicipio loans – MAG’s 44% | 4,197 | 8,150 | ||
MAG’s 44% equity income | 92,875 | 65,099 | ||
Sales increased by $185,077 during the year ended December 31, 2024, mainly due to 14% higher metal volumes, 19% higher realized metal prices, and $14,919 lower treatment, refining and toll milling costs driven mainly by updated favorable benchmark treatment and refining pricing terms and no toll milling at the Saucito and Fresnillo processing facilities during 2024.
Production costs decreased by $18,309 mainly due to Juanicipio depleting higher-cost, lower-grade commissioning stockpiles during operational ramp-up and processing facility commissioning in 2023 ($22,766), offset by higher mining, milling and G&A costs ($4,457, predominantly volume related) as Juanicipio shifted to nameplate production levels post September 2023.
Depreciation increased by $22,722, impacted by an increased depreciable asset cost base as the Juanicipio mill achieved commercial production and commenced depreciating the processing facility and associated equipment in June 2023. In addition, Juanicipio processed 5% more tonnes in 2024, impacting units of production depreciation.
Cash operating margin (gross profit plus depreciation divided by sales) increased from 61% to 76%, mainly due to reduced operating costs as well as positive commodity prices augmented by operational leverage and no processing at the nearby Fresnillo and Saucito processing facilities.
Other expenses decreased by $15,249 mainly as a result of lower consulting and administrative expenses ($4,449), higher foreign exchange gains and other costs ($7,284) driven mainly by a weakening in the Mexican peso versus the US dollar, and lower interest expense ($8,986) as Juanicipio reduced its outstanding shareholder loans balance by $209,920 over the course of 2024, offset by higher selling and other duties ($5,470) driven by the commencement of commercial pyrite concentrate production in the second quarter of 2024.
Taxes increased by $123,800 mainly due to higher taxable profits generated during 2024, as well as non-cash deferred tax charges on fixed assets driven by a depreciation in the Mexican peso versus the US dollar.
Gross Profit from Ore Processed at Juanicipio Plant (100% basis)
Year Ended December 31, 2024 (1,328,178 tonnes processed) | Year Ended December 31, 2023 Amount $ |
|||||
Metals Sold | Quantity | Average Price $ |
Amount $ |
|||
Silver | 16,590,111 ounces | 28.78 per oz | 447,480 | 362,457 | ||
Gold | 33,111 ounces | 2,431 per oz | 80,484 | 62,774 | ||
Lead | 16,507 tonnes | 0.92 per lb. | 33,581 | 24,746 | ||
Zinc | 25,224 tonnes | 1.28 per lb. | 71,087 | 42,496 | ||
Treatment, refining, and other processing costs (2) | (35,266 | ) | (50,185 | ) | ||
Sales | 627,366 | 442,288 | ||||
Production cost | (153,521 | ) | (171,830 | ) | ||
Depreciation and amortization (1) | (91,197 | ) | (68,475 | ) | ||
Gross Profit | 382,648 | 201,983 |
(1) The underground mine was considered readied for its intended use on January 1, 2022, whereas the Juanicipio processing facility started commissioning and ramp-up activities in January 2023, achieving commercial production status on June 1, 2023.
(2) Includes toll milling costs from processing mineralized material at the Saucito and Fresnillo plants for the year ended December 31, 2023.
Sales and treatment charges are recorded on a provisional basis and are adjusted based on final assay and pricing adjustments in accordance with the offtake contracts.
MAG FINANCIAL RESULTS – YEAR ENDED DECEMBER 31, 2024
As at December 31, 2024, MAG had working capital of $160,113 (December 31, 2023: $67,262) including cash of $162,347 (December 31, 2023: $68,707) and no long-term debt. As well, as at December 31, 2024, Juanicipio had working capital of $105,499 including cash of $53,193 (MAG’s attributable share is 44%).
The Company’s net income for the year ended December 31, 2024 amounted to $77,779 (December 31, 2023: $48,659) or $0.75/share (December 31, 2023: $0.47/share). MAG recorded its 44% income from equity accounted investment in Juanicipio of $92,875 (December 31, 2023: $65,099) which included MAG’s 44% share of net income from operations as well as loan interest earned on loans advanced to Juanicipio (see above for a discussion of MAG’s share of income from its equity accounted investment in Juanicipio).
December 31, | December 31, | |||
2024 | 2023 | |||
$ | $ | |||
Income from equity accounted investment in Juanicipio | 92,875 | 65,099 | ||
General and administrative expenses | (14,790 | ) | (13,461 | ) |
General exploration and business development | (642 | ) | (736 | ) |
Operating Income | 77,443 | 50,902 | ||
Interest income | 4,611 | 2,594 | ||
Other income | 1,969 | 1,017 | ||
Financing costs | (726 | ) | (133 | ) |
Foreign exchange loss | (480 | ) | (144 | ) |
Income before income tax | 82,817 | 54,236 | ||
Deferred income tax expense | (5,038 | ) | (5,577 | ) |
Net income | 77,779 | 48,659 | ||
NON-IFRS MEASURES
The following table provides a reconciliation of cash cost per silver ounce of Juanicipio to production cost of Juanicipio on a 100% basis (the nearest IFRS measure) as presented in the notes to the 2024 Financial Statements.
Year ended December 31, | ||||
(in thousands of US$, except per ounce amounts) | 2024 | 2023 | ||
Production cost as reported | 153,521 | 171,830 | ||
Depreciation on inventory movements | 489 | (3,919 | ) | |
Adjusted production cost | 154,009 | 167,911 | ||
Treatment, refining, and other processing costs | 35,266 | 50,185 | ||
By-product revenues (2) | (185,151 | ) | (130,016 | ) |
Extraordinary mining and other duties | 10,415 | 4,945 | ||
Total cash costs (1) | 14,539 | 93,025 | ||
Add back by-product revenues (2) | 185,151 | 130,016 | ||
Total cash costs for equivalent silver (1) | 199,690 | 223,041 | ||
Silver ounces sold | 16,590,111 | 15,317,765 | ||
Equivalent silver ounces sold (3) | 23,023,226 | 20,812,352 | ||
Cash cost per silver ounce sold ($/ounce) | 0.88 | 6.07 | ||
Cash cost per equivalent silver ounce sold ($/ounce) | 8.67 | 10.72 | ||
(1) | As Q3 2023 represented the first full quarter of commercial production, information presented for total cash costs and total cash costs for equivalent silver together with their associated per unit values are not directly comparable. | |
(2) | By-product revenues relate to the sale of other metals namely gold, lead, and zinc. | |
(3) | Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to “equivalent” silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Year ended December 31, 2024 realized prices: $28.78/oz silver, $2,430.76/oz gold, $0.92/lb lead and $1.28/lb zinc (year ended December 31, 2023 realized prices: $23.66/oz silver, $1,978.07/oz gold, $0.96/lb lead and $1.15/lb zinc). | |
The following table provides a reconciliation of AISC of Juanicipio to production cost and various operating expenses of Juanicipio on a 100% basis (the nearest IFRS measure), as presented in the notes to the 2024 Financial Statements.
Year ended December 31, | ||||
(in thousands of US$, except per ounce amounts) | 2024 | 2023 | ||
Total cash costs | 14,539 | 93,025 | ||
General and administrative expenses | 14,319 | 18,768 | ||
Exploration | 8,155 | 7,575 | ||
Sustaining capital expenditures | 53,597 | 37,728 | ||
Sustaining lease payments | 1,016 | 856 | ||
Interest on lease liabilities | (60 | ) | (48 | ) |
Accretion on closure and reclamation costs | 273 | 247 | ||
All-in sustaining costs (1) | 91,839 | 158,151 | ||
Add back by-product revenues (2) | 185,151 | 130,016 | ||
All-in sustaining costs for equivalent silver (1) | 276,991 | 288,167 | ||
Silver ounces sold | 16,590,111 | 15,317,765 | ||
Equivalent silver ounces sold (3) | 23,023,226 | 20,812,352 | ||
All-in sustaining cost per silver ounce sold ($/ounce) | 5.54 | 10.32 | ||
All-in sustaining cost per equivalent silver ounce sold ($/ounce) | 12.03 | 13.85 | ||
Average realized price per silver ounce sold ($/ounce) | 28.78 | 23.66 | ||
All-in sustaining margin ($/ounce) | 23.25 | 13.34 | ||
All-in sustaining margin ($/equivalent ounce) | 16.75 | 9.82 | ||
All-in sustaining margin | 385,641 | 204,306 | ||
(1) | As Q3 2023 represented the first full quarter of commercial production, information presented for all-in sustaining costs, all-in sustaining costs for equivalent silver, and all-in sustaining margin together with their associated per unit values are not directly comparable. | |
(2) | By-product revenues relate to the sale of other metals namely gold, lead, and zinc. | |
(3) | Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to “equivalent” silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Year ended December 31, 2024 realized prices: $28.78/oz silver, $2,430.76/oz gold, $0.92/lb lead and $1.28/lb zinc (year ended December 31, 2023 realized prices: $23.66/oz silver, $1,978.07/oz gold, $0.96/lb lead and $1.15/lb zinc). | |
For the year ended December 31, 2024, the Company incurred corporate G&A expenses of $14,131 (year ended December 31, 2023: $13,109), which exclude depreciation expense.
The Company’s attributable silver ounces sold and equivalent silver ounces sold for the year ended December 31, 2024 were 7,299,649 and 10,130,219 respectively (year ended December 31, 2023: 6,739,817 and 9,175,435 respectively), resulting in additional all‐in sustaining cost for the Company of $1.94/oz and $1.39/oz respectively (year ended December 31, 2023: $1.95/oz and $1.43/oz respectively), in addition to Juanicipio’s all-in-sustaining costs presented in the above table.
The following table provides a reconciliation of EBITDA and Adjusted EBITDA attributable to the Company based on its economic interest in Juanicipio to net income (the nearest IFRS measure) of the Company per the 2024 Financial Statements. All adjustments are shown net of estimated income tax.
Year ended December 31, | ||||
(in thousands of US$) | 2024 | 2023 | ||
Net income after tax | 77,779 | 48,659 | ||
Add back (deduct): | ||||
Taxes | 5,038 | 5,577 | ||
Depreciation and depletion | 659 | 352 | ||
Finance costs (income and expenses) | (5,374 | ) | (3,334 | ) |
EBITDA (1) | 78,102 | 51,254 | ||
Add back (deduct): | ||||
Adjustment for non-cash share-based compensation | 3,829 | 2,894 | ||
Share of net earnings related to Juanicipio | (92,875 | ) | (65,099 | ) |
MAG attributable interest in Junicipio Adjusted EBITDA | 197,678 | 108,564 | ||
Adjusted EBITDA (1) | 186,734 | 97,613 | ||
(1) | As Q3 2023 represents the first full quarter of commercial production, information presented for EBITDA and Adjusted EBITDA is not directly comparable. | |
The following table provides a reconciliation of free cash flow of Juanicipio to its cash flow from operating activities on a 100% basis (the nearest IFRS measure), as presented in the notes to the 2024 Financial Statements.
Year ended December 31, | ||||
(in thousands of US$) | 2024 | 2023 | ||
Cash flow from operating activities | 356,691 | 145,064 | ||
Less: | ||||
Cash flow used in investing activities | (63,326 | ) | (83,393 | ) |
Sustaining lease payments | (1,016 | ) | (856 | ) |
Juanicipio free cash flow (1) | 292,349 | 60,814 | ||
(1) | As Q3 2023 represents the first full quarter of commercial production, comparative information presented for free cash flow of Juanicipio is not directly comparable. | |
Qualified Persons: All scientific or technical information in this press release including assay results referred to, mineral resource estimates and mineralization, if applicable, is based upon information prepared by or under the supervision of, or has been approved by Gary Methven, P.Eng., Vice President, Technical Services and Lyle Hansen, P.Geo, Geotechnical Director; both are “Qualified Persons” for purposes of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About MAG Silver Corp.
MAG Silver Corp. is a growth-oriented Canadian mining and exploration company focused on advancing high-grade, district scale precious metals projects in the Americas. MAG is emerging as a top-tier primary silver mining company through its (44%) joint venture interest in the 4,000 tonnes per day Juanicipio Mine, operated by Fresnillo plc (56%). The mine is located in the Fresnillo Silver Trend in Mexico, the world’s premier silver mining camp, where in addition to underground mine production and processing of high-grade mineralised material, an expanded exploration program is in place targeting multiple highly prospective targets. MAG is also executing multi-phase exploration programs at the 100% earn-in Deer Trail Project in Utah and the 100% owned Larder Project, located in the historically prolific Abitibi region of Canada.
Rupert Resources Ltd. (TSX:RUP) is pleased to announce that it h... READ MORE
Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) an... READ MORE
First Mining Gold Corp. (TSX: FF) (OTCQX: FFMGF) (FRANKFURT: FMG)... READ MORE
Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced fi... READ MORE
G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to ... READ MORE