The Prospector News

Lithium Ionic Secures LOI from EXIM for US$266M, Representing 100% of Bandeira Project CAPEX

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium Ionic Secures LOI from EXIM for US$266M, Representing 100% of Bandeira Project CAPEX

 

 

 

 

 

Lithium Ionic Corp. (TSX-V: LTH) (OTCQX: LTHCF) (FSE: H3N) is pleased to announce the receipt of a non-binding Letter of Interest from the Export-Import Bank of the United States to provide up to US$266 million in debt financing for its 100%-owned flagship Bandeira Lithium Project  located in Minas Gerais, Brazil. This funding represents 100% of the capital expenditure outlined in the May 2024 Feasibility Study, marking a pivotal milestone as the Company accelerates toward construction and production within the next 2 years.

 

EXIM LOI Highlights:

  • Up to US$266 million in debt financing for Bandeira Project development, covering the entire CAPEX outlined in the May 2024 Feasibility Study.
  • Maximum repayment term of 15 years.
  • EXIM, the official export credit agency of the United States, plays a pivotal role in supporting U.S. exporters and strengthening supply chains.
  • The LOI reflects the Project’s alignment with EXIM’s China and Transformational Export Program (CTEP), which emphasizes critical minerals essential for energy security and electrification.
  • EXIM’s support underscores the critical role of the Bandeira Project in bolstering the United States’ energy security and supporting the global battery supply chain.
  • Lithium Ionic will now work with EXIM to complete the due diligence process and secure a definitive financial agreement.

 

Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, “This Letter of Interest from EXIM is a major achievement for Lithium Ionic, providing a clear pathway to fully fund the development of the Bandeira Project. Securing this support demonstrates the viability of the Project, reflects the strength of our Project and team, and the growing recognition and importance of Brazil’s Lithium Valley in the global move towards electrification. We extend our sincere appreciation to the US Southern Command (SOUTHCOM) and the US State Department for their direct interest in the Project and for reaffirming its strategic value to the security of the United States, Canada, and partner nations. With this backing, we are a major step closer to achieving our goal of becoming Brazil’s next major lithium producer.”

 

While the Bandeira Project covers only approximately 1% of its ~17,000-hectare land holdings in the Lithium Valley, it represents the cornerstone of Lithium Ionic’s growth strategy. In May 2024, a robust Feasibility Study demonstrated a 14-year mine life, average annual production of 178,000 tonnes of high-quality 5.5% Li2O spodumene concentrate (24.2k tpa LCE), and competitive on-site operating costs of US$444 per tonne. The study demonstrated a low CAPEX of US$266 million, delivering a post-tax NPV of US$1.3 billion and an IRR of 40%. Bandeira has access to excellent infrastructure, including low-cost hydroelectric power, established transport networks, and proximity to international markets via nearby ports, significantly contributing to its cost efficiency and competitiveness.

 

The LOI reflects the culmination of extensive effort, collaboration, and expertise from Arlington Innovation Partners, BMO Capital Markets, and the Ervin Graves Strategy Group, who have all played an instrumental role in reaching this important milestone for the Bandeira Project.

 

EXIM’s funding commitment to the Company is conditional upon Lithium Ionic completing the application for funding, satisfactory due diligence by EXIM and EXIM’s customary approval process of a final financial commitment.

 

About Lithium Ionic Corp.

 

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga and Salinas group of properties cover ~17,000 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

 

Posted November 27, 2024

Share this news article

MORE or "UNCATEGORIZED"


Leviathan Metals Announces Closing of $10 Million LIFE Offering

Leviathan Metals Corp. (TSX-V: LVX) (OTCQB: LVXFF) (FSE: 0GP) is pleased to announce that it has clo... READ MORE

May 20, 2026

Orezone Reports First Set Of Drill Results From Casa Berardi Mine Including16.10g/T Au Over 6.7m And 6.47g/T Au Over 21.5m

Orezone Gold Corporation (TSX: ORE) (ASX: ORE) (OTCQX: ORZCF) is pleased to announce the first set o... READ MORE

May 20, 2026

Valhalla Metals Announces Closing of First Tranche of Over-Subscribed Private Placement

Valhalla Metals Inc. (TSX-V: VMXX) (OTCQB: VMXXF) is pleased to announce that the Company has comple... READ MORE

May 20, 2026

Azimut Continues to Expand the Fortin Antimony-Gold Zone, Wabamisk Property, James Bay Region, Québec

Azimut Exploration Inc. (TSX-V: AZM) (OTCQX: AZMTF) is pleased to report the complete results of it... READ MORE

May 20, 2026

DPM Metals Reports New High-Grade Intercepts from the Chelopech Wedge Zone Deep Prospect; Expects Mineral Resource Estimate by Year-End 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) is pleased to report results from delineation drilling at the ... READ MORE

May 20, 2026

Copyright 2026 The Prospector News