The Prospector News

Lithium Ionic drills 1.59% Li2O over 15m and 1.58% Li2O over 9m at Salinas Project, Minas Gerais, Brazil; NI 43-101 Mineral Resource Estimate Underway

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium Ionic drills 1.59% Li2O over 15m and 1.58% Li2O over 9m at Salinas Project, Minas Gerais, Brazil; NI 43-101 Mineral Resource Estimate Underway

 

 

 

 

 

Lithium Ionic Corp. (TSX-V: LTH) (OTCQX: LTHCF) (FSE: H3N) reports assay results from the Salinas Lithium Project, located approximately 100 kilometres north of its Itinga group of properties which hosts the Feasibility-stage Bandeira lithium project and the Outro Lado lithium deposit (see press releases dated October 19, 2023 and June 27, 2023) (See location map and drill highlights in Figure 1).

 

With properties covering 14,182 hectares, the Company is the second largest landholder in Brazil’s “Lithium Valley”, in northern Minas Gerais State, Brazil, where two lithium producers currently operate.

 

Salinas Drill Intercept Highlights:

  • 1.59% Li2O over 15.0m, directly at surface from 42 metres (hole BGDD-23-095)
  • 1.58% Li2O over 9.0m (hole BGDD-23-098)
  • 1.13% Li2O over 9.1m, including 1.61% Li2O over 4.0m (hole BGDD-23-100)
  • 0.96% Li2O over 11.0m, including 1.21% Li2O over 5.0m (hole BGDD-23-102)

 

Blake Hylands, P.Geo., Chief Executive Officer of Lithium Ionic, commented, “Our drilling efforts at Salinas have proved very successful, with assay results that continue to demonstrate high grades over significant widths that reinforce this target’s potential. We look forward to seeing the results from the last 9 months of drilling at Salinas materialize into an initial mineral resource, which we expect to deliver in the coming months. While our focus remains on getting Bandeira to production, the advancement of our other regional targets, including Salinas underscores the scalability of our projects in this prolific lithium district.”

 

The Company is actively drilling at Salinas, one of its main targets of the 50,000-metre drill program planned for 2024, where it is testing and delineating multiple outcropping spodumene-rich pegmatite bodies. Approximately 25,000 metres (105 holes) have been completed at Salinas since the Company began drilling in May 2023.

 

Lithium Ionic acquired the Salinas group of properties in early 2023 from Neolit Minerals Participações Ltda. (“Neolit”; see press release dated March 13, 2023) and began selectively drilling the area in May 2023, following up on a 4,000-metre, 24-hole, drill program completed by the previous owner in 2022, which yielded excellent results, including highlights of 1.53% Li2O over 11.4m, 1.22% Li2O over 13.8m, 1.71% Li2O over 9.8m and 1.19% Li2O over 13.4m. On July 25, 2023, the Company reported initial results from its drilling program at Salinas, including highlights of 1.38% Li2O over 16m, 1.60% Li2O over 12m, 1.55% Li2O over 9m, 1.26% Li2O over 11m and 1.34% Li2O over 10m. On December 7, 2023, the Company reported the widest and highest-grade lithium intercept to date at this target, including 1.13% Li2O over 27.6m, including 1.34% Li2O over 9m.

 

 Figure 1. Salinas Lithium Project Location & Drill Intercept Highlights

 

Table 1. Salinas Drill Results

 

Hole ID Az Dip From To Metres Li2O (%)
BGDD-23-094 310 -79 206.50 208.50 2.00 0.58
and 223.17 226.40 3.23 0.48
and 279.34 282.39 3.05 1.41
BGDD-23-095 310 -70 42.16 57.16 15.00 1.59
BGDD-23-098 260 -75 199.70 208.70 9.00 1.58
BGDD-23-099 0 -90 63.06 66.10 3.04 0.95
and 109.22 114.22 5.00 0.93
including 109.22 112.22 3.00 1.24
BGDD-23-100 310 -60 120.18 129.25 9.07 1.13
including 120.18 124.18 4.00 1.61
BGDD-23-101 310 -60 nsv
BGDD-23-102 310 -60 65.94 70.98 5.04 1.29
and 75.43 86.40 10.97 0.96
including 76.43 81.43 5.00 1.21

*No significant results/values (nsv) for holes BGDD-23-101
**Assays pending for holes: BGDD-23-096 and BGDD-23-103 to BGDD-23-107
***Hole BGDD-23-097 reported on December 7, 2023.

 

About Lithium Ionic Corp.

 

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga and Salinas group of properties cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

 

Quality Assurance and Control

 

During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

 

Qualified Persons

 

The technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, who are both “qualified persons” as defined in NI 43-101.

 

The technical information relating to the historical exploration conducted by Neolit is historical in nature and has not been independently verified by Lithium Ionic. A qualified person, as defined in National Instrument 43-101, has not done sufficient work on behalf of Lithium Ionic to classify the historical drilling reported above as current mineral resources or mineral reserves and Lithium Ionic is not treating the historical drill results as current mineral resources or mineral reserves.

 

Posted January 9, 2024

Share this news article

MORE or "UNCATEGORIZED"


Pan American Silver Announces Agreement to Acquire MAG Silver Corp.

Adds Strategic Interest in Tier-One Juanicipio Silver Mine and Si... READ MORE

May 12, 2025

Opus One Gold Obtains 4.12 g/t Gold Over 7.3 m at 135 m; Including 6.1 g/t Gold Over 4 m From the First Hole of the Drilling Season on its Zone 1 Gold Discovery, on Noyell Project

Opus One Gold Corp. (TSX-V: OOR) is pleased to announce that the... READ MORE

May 12, 2025

Silvercorp Announces Updated Mineral Resource Estimate for its Condor Project, located in the Zamora Chinchipe Province of Ecuador

Silvercorp Metals Inc. (TSX: SVM) (NYSE: SVM) is pleased to repor... READ MORE

May 12, 2025

Imperial Reports First Quarter 2025 Financial Results

Imperial Metals Corporation  (TSX:III) reports financial results... READ MORE

May 12, 2025

Abcourt intersects 3.7 g/t gold over 11 metres directly below the Cartwright stripping and publishes a summary of the 2025 drilling campaign on its Flordin property in the Lebel-Sur-Quévillon area

Abcourt Mines Inc. (TSX-V : ABI) (OTCQB : ABMBF) is pleased to a... READ MORE

May 12, 2025

Copyright 2025 The Prospector News