The Prospector News

Lithium Argentina Announces 2023 Production Results for Caucharí-Olaroz

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium Argentina Announces 2023 Production Results for Caucharí-Olaroz

 

 

 

 

 

Lithium Americas (Argentina) Corp. (TSX: LAAC) (NYSE: LAAC) announced preliminary 2023 operational results for the Caucharí-Olaroz lithium brine operation in Jujuy, Argentina.

 

HIGHLIGHTS

  • 2023 production surpassed guidance reaching approximately 6,000 tonnes of lithium carbonate.
  • Lithium carbonate plant is producing at approximately 50% capacity.
  • The KCl plant is operational and in the process of ramping up in production volume and product quality.
  • Lithium Argentina to report year-end financial results on March 21, 2024 after market close.

 

“We are very pleased with the production results from Caucharí-Olaroz to date and continue to progress of the ramp up of both production volume and product quality,” commented John Kanellitsas Executive Chair, President and interim CEO. “The team in Argentina has gained valuable experience and has consistently achieved important milestones as the Project transitioned from construction into operations. We look forward to 2024 with a focus on achieving nameplate capacity and laying the foundation for our next phase of growth.”

 

Following the achievement of first lithium carbonate production in June 2023, Caucharí-Olaroz has been consistently producing lithium carbonate as commissioning and ramp-up continue. Production is currently achieving 99.5% lithium carbonate content with technical quality specifications approaching battery quality.

 

The Project produced approximately 6,000 tonnes of lithium carbonate in 2023 exceeding the Company’s previous guidance of 5,000 tonnes. The first lithium shipment left Argentina in early October with regular shipments continuing since then.

 

Fourth Quarter and Full Year 2023 Financial Results

 

Lithium Argentina plans release its fourth quarter and full year 2023 financial results, including an update on production guidance for 2024, after market hours on, March 21, 2024.

 

ABOUT LITHIUM ARGENTINA

 

Lithium Argentina is an emerging producer of lithium carbonate for use predominately in lithium-ion batteries and electric vehicles. The Company, in partnership with Ganfeng Lithium Co, Ltd., is ramping up production of the Caucharí-Olaroz lithium brine operation in Argentina and advancing development of additional lithium resources in the region. Lithium Argentina currently trades on the TSX and on the NYSE, under the ticker symbol “LAAC.”

 

TECHNICAL INFORMATION

 

The Technical Information in this news release with respect to Caucharí-Olaroz, has been reviewed and approved by Ernest Burga, P.Eng., a Qualified Person as defined by National Instrument 43-101 independent of the Company.

 

Posted January 11, 2024

Share this news article

MORE or "UNCATEGORIZED"


Juggernaut Exploration Closes Bought Deal Private Placement for Gross Proceeds of C$11.5M

Juggernaut Exploration Ltd. (TSX-V: JUGR) (OTCPK: JUGRF) (FSE: 4J... READ MORE

March 19, 2026

NevGold Intercepts 11.42 g/t AuEq Over 7.7 Meters (2.64% Antimony And 1.17 g/t Au) Within 4.91 g/t AuEq Over 27.4 Meters (1.09% Antimony And 0.67 g/t Au); Initial Antimony-Gold Mineral Resource Estimate On Schedule For Q2-2026 With Focus On Near-Term Antimony Production

NevGold Corp.  (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is ple... READ MORE

March 19, 2026

Scorpio Gold Drills 24.69 Metres Grading 0.75 g/t Gold, from 230.12 Metres at Black Mammoth, a 250 Metre Step-Out from Goldwedge, at the Manhattan District, Nevada

Highlights                           ... READ MORE

March 19, 2026

Titan Mining Reports Strong 2025 Results as Kilbourne Graphite Project Advances

Titan is positioning itself to establish the first domestic end-t... READ MORE

March 19, 2026

Mirasol Signs LOI for the Sale of the Rubi Copper Project for US$4 Million Plus 2% NSR Royalty

San Lorenzo Gold to acquire Rubi Project for a total consideratio... READ MORE

March 19, 2026

Copyright 2026 The Prospector News