l4 Published December 6, 2023 at 1600 × 1488 in LIFT Intersects 26 m at 1.14% Li2O at the Fi Southwest pegmatite and 20 m at 1.52% Li2O at the Shorty pegmatite, Yellowknife Lithium Project, NWT