l4 Published October 24, 2023 at 1375 × 921 in LIFT Intersects 18 m at 1.72% Li2O at the BIG East pegmatite and 12 m at 1.04% Li2O at the Shorty pegmatite, Yellowknife Lithium Project, NWT