l8 Published November 21, 2023 at 1375 × 1001 in LIFT Intersects 14 m at 1.50% Li2O at the Ki pegmatite and 10 m at 1.75% Li2O at the Shorty pegmatite, Yellowknife Lithium Project, NWT