The Prospector News

Lara Reports First Production at the Celesta Copper Project in Brazil

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lara Reports First Production at the Celesta Copper Project in Brazil

 

 

 

 

 

Lara Exploration Ltd. (TSX-V: LRA) is pleased to report that mining and processing has started at its Celesta Copper Project, located near the town of Curionópolis, in the Carajás Mineral Province, Pará State, northern Brazil, with first concentrates due to be shipped in early August.

 

Lara owns a 2% net smelter returns royalty on the project and a 5% carried (to production) equity interest in the operating company Celesta Mineração S.A. which is jointly operated by partners Tessarema Resources Inc. (with 40% interest), and North Extração de Minério Ltda. (with 55% interest). Ocean Partners UK Ltd., has provided project finance in exchange for life of mine offtake rights. Lara is also owed a US$1 million late penalty fee, of which US$200,000 has been paid to date.

 

Celesta’s mining program will initially focus on the Osmar target that has an Indicated Resource estimate of 2.14 million tonnes, with average grades of 4.2% copper and 0.66 parts per million gold. For details see the National Instrument 43-101 Technical Report entitled “Maravaia Copper-Gold Deposit, Carajás Mining District, Pará, Brazil”, dated January 15, 2016 which is filed on SEDAR, and was prepared for Tessarema and Lara by João Batista G. Teixeira, Geologist, PhD, P.Geo.

 

About Lara

 

Lara is an exploration company following the Prospect and Royalty Generator business model, which aims to minimize shareholder dilution and financial risk by generating prospects and exploring them in joint ventures funded by partners, retaining a minority interest and or a royalty. The Company currently holds a diverse portfolio of prospects, deposits and royalties in Brazil and Peru. Lara’s common shares trade on the TSX Venture Exchange under the symbol “LRA”.

 

Michael Bennell, Lara’s Vice President Exploration and a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), is a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects and has approved the technical disclosure and verified the technical information in this news release.

 

Posted July 27, 2020

Share this news article

MORE or "UNCATEGORIZED"


Titan Mining Closes C$8M Private Placement

Titan Mining Corporation (TSX:TI) is pleased to announce the clos... READ MORE

September 25, 2020

Kutcho Copper Announces Closing of Private Placement for Gross Proceeds of $2.2 Million

KutchoCopper Corp. (TSX-V: KC) (OTC: KCCFF) is please... READ MORE

September 25, 2020

Three Additional Infill Holes Continue to Expand Higher-Grade Core at Canada Nickel's Crawford Nickel-Cobalt Sulphide Project

Highlights The final three holes in the western portion of the Ma... READ MORE

September 24, 2020

Uranium Energy Corp Closes Public Offering of $15 Million

Uranium Energy Corp.(NYSE American: UEC) isple... READ MORE

September 24, 2020

Luminex Intercepts 17 Metres of 3.8 g/t Gold and 9 Metres of 6.5g/t Gold at Soledad Baja

Luminex Resources Corp.(TSX-V: LR) (OTCQX: LUMIF)is p... READ MORE

September 24, 2020

Copyright 2020 The Prospector News - Site design by Spyderbaby Productions