The Prospector News

Lahontan Mobilizes Drill Rig to West Santa Fe, Grants Stock Options

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lahontan Mobilizes Drill Rig to West Santa Fe, Grants Stock Options

Lahontan Gold Corp. (TSX-V:LG) (OTCQB:LGCXF) (FSE:Y2F) is pleased to announce the mobilization of a track-mounted reverse-circulation drill rig and crew to its West Santa Fe Project in Nevada’s prolific Walker Lane. The Foremost MPD-1500 track-mounted RVC drill rig will conduct approximately 3,500 metres of drilling in 20 holes focused on gold and silver resource definition and step-out targets. The track-mounted configuration will allow multiple holes to be completed from individual drill pads, helping to minimize surface disturbance. Lahontan’s maiden drilling campaign at West Santa Fe in December 2025 successfully reproduced high-grade gold and silver mineralization reported in historic drilling, including 36.6 metres grading 3.11 g/t AuEq (1.47 g/t Au and 140.1 g/t Ag) from surface in drill hole WSF25-04R. The entire interval is oxide mineralization (please see Lahontan’s February 24, 2026 press release).

Kimberly Ann, Lahontan Executive Chair, President, CEO, and Founder, commented: “Lahontan is excited to resume drilling at West Santa Fe following the success of our maiden drill campaign last December. Our geological team has been modeling the distribution and geometry of gold and silver mineralization throughout the West Santa Fe system, with particular emphasis on areas that were under-explored by previous operators. This work has identified numerous targets where additional drilling can both expand the known mineralized system and improve our understanding of its geometry. We expect results from this program later in 2026.”

West Santa Fe is located approximately 13 kilometres from Lahontan’s flagship Santa Fe Mine Project and represents an important component of the Company’s regional Walker Lane exploration strategy. Historic drilling at West Santa Fe established extensive gold and silver mineralization, while Lahontan’s 2025 drilling provided confirmation of high-grade oxide mineralization near surface.

The Company also announces that it has granted an aggregate of 3,000,000 options to purchase common shares of the Company exercisable at a price of Cdn$0.40 per common share for a period of five (5) years to officers and consultants of the Company. The options vest over an 18 month period; the common shares issuable upon exercise of the options are subject to a four-month hold period from the original date of grant.

About Lahontan Gold Corp.

Lahontan Gold Corp. is a Nevada-focused mine development company advancing a portfolio of four gold and silver projects in mining-friendly Nevada’s prolific Walker Lane. The Company’s primary focus is the restart of its flagship, the 28.3 km² Santa Fe Mine project, with a targeted return to production in 2027.

  • Santa Fe Mine historic production: 359,202 ounces of gold and 702,067 ounces of silver, open pit mining with heap-leach processing (1988-1995; Nevada Bureau of Mines).
  • Current Resources: The Santa Fe Mine has a NI 43-101 compliant Indicated Mineral Resource of 1,195,000 oz Au Eq (47,532,000 tonnes grading 0.72 g/t Au and 5.55 g/t Ag, together grading 0.78 g/t Au Eq) and an Inferred Mineral Resource of 1,190,000 oz Au Eq (60,605,000 tonnes grading 0.59 g/t Au and 2.40 g/t Ag, together grading 0.61 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report and note below*).
  • Objectives 2026:
    • Complete an updated Preliminary Economic Assessment for the Santa Fe Mine, including the first analysis of mining and processing sulfide resources,
    • Advancing mine permitting activities with the objective of commencing construction in 2027,
    • Continue drill testing the satellite West Santa Fe project, with a maiden resource estimate targeted by year-end,
    • Conduct exploration drilling at Santa Fe focused on expanding known gold and silver mineralization,
    • Drill test historic heap-leach pads to evaluate residual gold and silver mineralization for potential future reprocessing opportunities.

For more information, please visit our website: www.lahontangoldcorp.com

* Please see the “Updated Mineral Resource Estimate, NI 43-101 Technical Report, Santa Fe Project”, Authors: Michael S. Lindholm, C.P.G., and Thomas Dyer, PE; Effective Date: August 13, 2026, Report Date: Maximum 45 days from August 17, 2026. The Technical Report will be available on the Company’s website and SEDAR+. Mineral resources are reported using a cut-off grade of 0.10 g/t AuEq for oxide and transition resources and 0.30 g/t AuEq for non-oxide resources. AuEq for the purpose of cut-off grade and reporting the Mineral Resources is based on the following assumptions gold price of US$3,250/oz, silver price of US$40.00/oz, and oxide gold recoveries ranging from 60% to 79%, oxide silver recoveries ranging from 0% to 30%, transitional gold recoveries ranging from 28% to 45%, transitional silver recoveries ranging from 0 to 13%, and non-oxide gold and silver recoveries of 68% except for the York deposit where non-oxide recoveries are estimated to be 0%.

Qualified Person

Brian J. Maher, M.Sc., CPG-12342, is a “Qualified Person” as defined under Canadian National Instrument 43-101, Standards of Disclosure for Mineral Projects, and has reviewed and approved the content of this news release in respect of all technical disclosure other than the Mineral Resource Estimate as noted above.‎ Mr. Maher is Senior Vice President, Mine Development & Exploration for Lahontan Gold and has verified the data disclosed in this news release, including the sampling, ‎‎analytical and test data underlying the disclosure.

On behalf of the Board of Directors

Kimberly Ann

Founder, CEO, President, Executive Chair

FOR FURTHER INFORMATION, PLEASE CONTACT:

Lahontan Gold Corp.

Kimberly Ann

Founder, CEO, President, Executive Chair

Phone: 1-530-414-4400

Email: Kimberly.ann@lahontangoldcorp.com

Website: www.lahontangoldcorp.com

Posted September 21, 2026

Share this news article

MORE or "UNCATEGORIZED"


PMET Increases Grade and Scale of Caesium Mineral Resource at Shaakichiuwaanaan

PMET Resources Inc. (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce an upda... READ MORE

November 4, 2026

West Red Lake Gold Announces Integrated PFS Delivering C$764 Million Post-Tax NPV and Annual Gold Production of 100,000 Ounces Once Rowan Enters Production

West Red Lake Gold Mines Ltd. (TSX-V: WRLG) (OTCQX: WRLGF) is pleased to announce the results of an ... READ MORE

November 4, 2026

Independence Gold Reports Additional Gold-Silver Intersections and Gives an Exploration Update at the 3Ts Project, BC

Independence Gold Corp. (TSX-V: IGO) (OTCQB: IEGCF) (FSE: 625) is pleased to announce additional gol... READ MORE

November 4, 2026

Lodestar Intersects Gold-Silver Mineralisation at All Four Targets in the Maiden Drill Program at Gold Run, Nevada, Including 71.6 m at 0.9 g/t AuEq at Crown North

Lodestar Metals Corp. (TSX-V: LSTR) (OTCQB: SVTNF) (FSE: PR90), an exploration company focused on go... READ MORE

November 4, 2026

Northmin Reports Broad, Shallow Polymetallic Mineralisation Comprising 38.25 Metres at 0.35% Copper, 5.05% Zinc+Lead and 19.88 g/t Silver from 68.55m Downhole to the East of the Historic Zone 3 Mine

Northmin Corporation (TSX-V: NMB) is pleased to announce additional assay results from three drill h... READ MORE

November 4, 2026

Copyright 2026 The Prospector News