The Prospector News

LAHONTAN CLOSES STRATEGIC YORK CLAIMS PURCHASE AT SANTA FE

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

LAHONTAN CLOSES STRATEGIC YORK CLAIMS PURCHASE AT SANTA FE

 

 

 

 

 

Lahontan Gold Corp. (TSX-V: LG) (OTCQB: LGCXF) (FSE: Y2F) is pleased to announce that the Company has completed the Purchase of 27 unpatented lode mining claims from Emergent Metals Corp.  The York claims are contiguous with the southeast corner of the Santa Fe Mine Project and provide a compelling opportunity to significantly expand oxide gold and silver mineral resources previously defined at the York deposit*. Modeling of drill data during the mineral resource estimation process suggests that gold and silver mineralization likely extends onto the York claims. This targeting concept was in part validated by Lahontan’s recent drilling campaign where reverse-circulation drill hole YOR25-001R cut 89.9 metres (45.7 – 135.6m) grading 0.23 g/t gold (please see Lahontan Gold News Release dated September 2, 2025). The Company is currently planning additional drilling at the York target area for this Fall.  With the addition of the York claims, the Company now owns or controls 415 unpatented lode mining claims, 67 unpatented millsite claims, and 24 patented lode mining claims encompassing over 2,832 ha or 28.3 km2 of mineral rights in one of the World’s premier gold belts: Nevada’s Walker Lane.

Kimberly Ann, Lahontan Founder, Chair, CEO, and President commented: “Lahontan is excited to have completed the Purchase of the York claims. The gold and silver resource expansion potential, combined with the ability to further layback the York pit in potential future mining operations, makes the Purchase a strategic acquisition for the Company. Lahontan now controls a district-scale land package that, despite prolific past production and the completion of over 1,200 drill holes, remains largely unexplored with multiple targets for resource expansion and new discoveries.”
Terms of the Purchase include:

  • Lahontan has paid Emergent’s U.S. subsidiary, Golden Arrow Mining Corporation, a sum of US$10,000.
  • Lahontan has issued GAMC a US$50,000 promissory note, with a 1% per month interest rate, and payable within six months of signing this announcement.
  • Lahontan has issued 2,000,000 common shares of Lahontan Gold Corp. to Emergent.
  • GAMC will facilitate the transfer of the York Claims to Lahontan or its designee, to be completed within 30 days of today’s date.

 

As part of the transfer, Lahontan has granted GAMC a 1% NSR royalty on the York Claims.  At any time before the third anniversary of the Agreement, Lahontan may purchase the Royalty for US$500,000.  After the third and before the seventh anniversary of the Agreement, Lahontan may purchase the Royalty for US$1,000,000.

 

About Lahontan Gold Corp

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds, through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of mining friendly Nevada. Lahontan’s flagship property, the 28.3 km2 Santa Fe Mine project, had past production of 359,202 ounces of gold and 702,067 ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing. The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (48,393,000 tonnes grading 0.92 g/t Au and 7.18 g/t Ag, together grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (16,760,000 grading 0.74 g/t Au and 3.25 g/t Ag, together grading 0.76 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report and note below*). The Company plans to continue advancing the Santa Fe Mine project towards production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025. For more information, please visit our website: www.lahontangoldcorp.com

* Please see the “Preliminary Economic Assessment, NI 43-101 Technical Report, Santa Fe Project”, Authors: Kenji Umeno, P. Eng., Thomas Dyer, PE, Kyle Murphy, PE, Trevor Rabb, P. Geo, Darcy Baker, PhD, P. Geo., and John M. Young, SME-RM; Effective Date: December 10, 2024, Report Date: January 24, 2025. The Technical Report is available on the Company’s website and SEDAR+. Mineral resources are reported using a cut-off grade of 0.15 g/t AuEq for oxide resources and 0.60 g/t AuEq for non-oxide resources. AuEq for the purpose of cut-off grade and reporting the Mineral Resources is based on the following assumptions gold price of US$1,950/oz gold, silver price of US$23.50/oz silver, and oxide gold recoveries ranging from 28% to 79%, oxide silver recoveries ranging from 8% to 30%, and non-oxide gold and silver recoveries of 71%.

Posted October 23, 2025

Share this news article

MORE or "UNCATEGORIZED"


Cerro de Pasco Resources Enters Project Development Funding Agreement with U.S. International Development Finance Corporation for Quiulacocha

Cerro de Pasco Resources Inc. (TSX-V: CDPR) (OTCQB: GPPRF) (BVL: CDPR) announces that it has ... READ MORE

March 2, 2026

NorthWest Announces Updated Mineral Resource at Kwanika Reflecting Strategic Shift to Higher-Grade Copper-Gold Focus

NorthWest Copper Corp. (TSX-V: NWST) is pleased to announce an updated mineral resource estimate for... READ MORE

March 2, 2026

Monument Reports Second Quarter Fiscal 2026 Results

Monument Mining Limited (TSX-V: MMY) (FSE: D7Q1) today announced its financial results for the three... READ MORE

March 2, 2026

Taseko announces First Cathode Harvest at Florence Copper

Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) is pleased to announce its F... READ MORE

March 2, 2026

Highland Copper Closes Sale of 34% Interest in White Pine for US$30 Million

Highland Copper Company Inc. (TSX-V: HI) (OTCQB: HDRSF) is pleased to announce, further to its press... READ MORE

March 2, 2026

Copyright 2026 The Prospector News