The Prospector News

Kirkland Lake Gold Extends High-Grade, Visible-Gold Mineralization Down-Plunge of Fosterville Swan Zone

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Kirkland Lake Gold Extends High-Grade, Visible-Gold Mineralization Down-Plunge of Fosterville Swan Zone

 

 

 

 

 

Kirkland Lake Gold Ltd. (TSX:KL) (NYSE:KL) (ASX:KLA) announced new high-grade results from the ongoing underground drilling programs at the Fosterville Mine in Victoria, Australia. Recent underground drilling targeting additional growth in Mineral Reserves and Mineral Resources confirmed significant continuity of mineralization down-plunge and adjacent to existing Mineral Reserves in the Lower Phoenix System. In addition, underground infill drilling into Swan Mineral Reserves continues to return exceptional high-grade results containing VG providing confirmation of the geological model, underpinning confidence in the operation’s mine plan. Drill results reported are from 206 holes (51,521 m) that targeted infill and extension of the Lower Phoenix Mineral Resources. Drill results reported are post the December 2018 Mineral Resource and Mineral Reserve update. (See press release dated February 21, 2019.)

 

Tony Makuch, President and CEO of Kirkland Lake Gold, commented: “We have an extensive exploration program at Fosterville covering four main target areas, Lower Phoenix down-plunge of Swan, Cygnet, Harrier and Robbin’s Hill (Figure 1). Today’s results focus on the Lower Phoenix area. They are encouraging as they include the extension of high-grade, VG-bearing mineralization 80 m down-plunge of the Swan Zone and demonstrate that Lower Phoenix is an extremely large gold system, with continuity of the system having been confirmed to over 950 metres down‑plunge of our deepest Mineral Reserves. In addition, we continue to get strong results from drilling of the Cygnet Zone, where we have intersected high-grade, VG-bearing mineralization, including 239 g/t Au over 1.2 m (ETW 0.9 m). Such results provide significant resource growth potential immediately adjacent to existing underground infrastructure.

 

“We are also progressing well with other components of our exploration program. At Robbin’s Hill, there have been up to six surface drill rigs in operation over recent months, with encouraging results which we plan to release shortly. We also continue to drill the anticline offset target at Harrier South from underground drill platforms and advance our LODE program on district targets. Drilling at Harrier South remains at an early stage given the time required to extend the existing exploration drift and poor ground conditions encountered in some areas. The fact that we have already intersected quartz veins with VG similar in texture to those found in the Swan Zone is promising. We have not yet seen the ultra-high grades you get at Swan, but it is early days and we remain optimistic. Harrier South will continue to be a high-priority target with extensive drilling to continue into, and throughout, 2020.”

 

Lower Phoenix Extension Drilling Program

 

During 2019, underground diamond drilling targeting down-plunge of the Swan Mineral Reserves has continued to return encouraging results, demonstrating the extensive down-plunge extent of the Lower Phoenix System (Figure 2).

 

Progressive step out drilling over 2019 from the Harrier Link Drill Drive, spaced at 100 m x 50 m centres has now confirmed continuity of moderate to high-grade mineralization over a down-plunge distance of 950 m from December 2018 Mineral Reserves in the Lower Phoenix System (Figure 3). Reported drill results are from 22 holes (16,611 m), and include moderate to high grade, large width sulfide intercepts of 14.8 g/t Au over 5.9 m (ETW 4.5 m) in hole UDE210, 6.2 g/t Au over 18.0 m (ETW 13.8 m) in hole UDE204 and 7.3 g/t Au over 8.8 m (ETW 6.7 m) in hole UDE199. The drilling has now defined continuity of mineralization between the Swan and Lower Phoenix South Resource blocks (Swan South Zone) and, with a high frequency of 30 gram-metre intercepts, it is anticipated that substantial additions of Inferred Mineral Resources will be realized in end-of-year model updates as a result of this program.

 

This drilling has also identified mineralization directly footwall to Swan South in the Swan Footwall Splay Zone up to 250 m down-plunge of December 2018 Mineral Reserves. Results of 2.8 g/t Au over 15.7 m (ETW 12.0 m) in hole UDE200A and 42.6 g/t Au over 0.8 m (ETW 0.5 m) in hole UDE204 (Figure 4) highlight the potential for Mineral Resource expansion immediately footwall to the Swan South Zone down-plunge.

 

In August 2019, the establishment of the P4040 drill drive development enabled close space drill targeting of the down-plunge extensions of the Swan Mineral Reserves down to 25 m x 25 m centres with the aim to extend Indicated Mineral Resources to facilitate Mineral Reserve evaluation. Four underground drill rigs have been located in this drill platform since August and results returned demonstrate continuity of high-grade mineralization, including occurrences of quartz vein hosted VG enveloped by sulfide mineralization up to a distance of 150 m down-plunge of Mineral Reserves (Figure 3). Two intercepts containing VG outside Mineral Reserves are greater than 100 gram-m, with 87.6 g/t Au over 7.6 m (ETW 5.5 m) in hole UDH3132 and 45.0 g/t Au over 5.2 m (ETW 4.7 m), including 267 g/t Au over 0.7 m (ETW 0.7 m) in hole UDH3142 which occur 40 m and 80 m down-plunge from Mineral Reserve respectively. A further 11 drill hole intercepts from this program are greater than 30 gram-m and it is anticipated that Mineral Reserves will be extended down-plunge of the Swan Mineral Reserves in the end of year model updates.

 

Cygnet Drilling Program

 

Exploration drilling footwall to Swan in 2018 discovered significant mineralization on a west southwesterly dipping structure, Cygnet. Further drilling into the up-plunge projection of this target has returned several high-grade intercepts containing VG mineralization. Recent key intercepts into the Cygnet Zone are listed below, with further details provided in the commentary that follows:

 

Key Gold Intercepts:

 

  • 239 g/t Au(1) over 1.2 m (ETW 0.9 m), including 701 g/t Au(1) over 0.4 m (ETW 0.3 m) in hole UDE262;
  • 28.4 g/t Au(1) over 1.8 m (ETW 1.5 m) in hole UDE247; and
  • 11.2 g/t Au over 5.4 m (ETW 4.5 m) in hole UDH280
    (1) Visible gold drill intercept

 

Drill results returned to date in the Cygnet Zone demonstrate strike continuity of mineralization over a distance of approximately 650 m and dip continuity of mineralization over a vertical distance of approximately 300 m between the 6100mN and 6750mN and 4050RL and 3750RL (Figure 7).

 

The Cygnet structure sub-parallels the Swan structure and is positioned approximately 125m footwall (east) of the Swan Zone (Figure 6). The north northwest striking mineralized structure transects the eastern limb of an anticline and an anticline-syncline fold pair. The mineralized fault occurs east of the main anticlinal axis, and has an interpreted reverse displacement of approximately 30 m. A shallower structure named the Pen Fault, splays from the Cygnet structure footwall to the Benu Shale stratigraphic units and at the intersection point of these two structures is where occurrences of quartz hosted VG mineralization have been intersected. Further footwall (approximately 70 m), another structure named the Cob Fault has also been identified containing a consistent trend of sulfide mineralization.

 

Drilling further down-plunge of 6100mN into the projected position of the Cygnet Zone also demonstrates that significant mineralization persists approximately 550 m down-plunge. Four intercepts containing significant grades and widths of sulfide mineralization highlight the growth potential down-plunge on the Cygnet Zone including 11.1 g/t Au over 3.4 m (ETW 2.4 m) in hole UDE200, 7.9 g/t Au over 3.1 m (ETW 2.6 m) in hole UDE209, 6.6 g/t Au over 6.6 m (ETW 5.5 m) in hole UDE181A and 8.7 g/t Au over 2.3 m (ETW 2.1 m) in hole UDE185A.

 

Drilling undertaken to date in the Cygnet Zone has demonstrated sufficient continuity of mineralization and the Company expects to substantially extend Mineral Resources to the north of the December 2018 Cygnet block which hosts an Inferred Mineral Resource of 582Kt @ 6.9g/t Au for 120Koz Au. Opportunity exists for further expansion of Mineral Resources to the north and south and drill targeting of the Cygnet structure will continue into 2020. Drilling will also focus on infill drilling of Mineral Resources to increase geological confidence to facilitate mineral reserve evaluation on this attractive growth target positioned in close proximity to current infrastructure.

 

Swan Infill Drilling Program

 

Results from the ongoing underground infill drilling program targeting Swan, reaffirm the high-grade tenor of the Swan Mineral Reserves. Since the December 2018 Swan Mineral Reserve of 2.34Moz grading at 49.6 g/t Au, a total of 117 holes for 13,484 m have been drilled into this zone in 2019 for the purpose of optimizing development and stope positioning. Of the 117 results returned to date, 19 results returned greater than 1,000 gram-metres and an additional 44 results returned greater than 100 gram-metres (Figure 5). Key intercepts over 2,000 gram-metres include;

 

High-Grade, Visible-Gold Bearing Intercepts >2000 gram-metres include:

 

  • 924 g/t Au over 3.6 m (ETW 3.2 m), including 6,590 g/t Au over 0.5 m (ETW 0.4 m) in hole UDH2872;
  • 918 g/t Au over 7.0 m (ETW 6.8 m), including 1,722 g/t Au over 3.7 m (ETW 3.3 m) in hole UDH3024;
  • 625 g/t Au over 3.6 m (ETW 3.3 m), including 6,123 g/t Au over 0.35 (ETW 0.3 m) in hole UDH2483;
  • 488 g/t Au over 5.0 m (ETW 4.7 m), including 2,527 g/t Au over 1.0 m (ETW 0.9 m) in hole UDH3171;
  • 229 g/t Au over 11.2 m (ETW 11 m), including 3,520 g/t Au over 0.6 m (ETW 0.6 m) in hole UDH3103;
  • 365 g/t Au over 6.8 m (ETW 6.1 m), including 1,629 g/t Au over 1.2 m (ETW 1 m) in hole UDH3101;
  • 367 g/t Au over 6.3 m (ETW 5.9 m), including 1,058 g/t Au over 2.1 m (ETW 2 m) in hole UDH2863

 

Intercepts through the Swan Footwall Splay also returned some exceptional high-grade, VG intercepts, including one over 2,000 gram-metres and a further three intercepts over 100 gram-metres. The Swan Footwall Splay Fault emanates from and branches off the Swan Fault at approximately 6400mN and 4000mRL (Figures 4 & 6). Mineralized widths containing significant VG grades are typically largest on this fault immediately footwall to the Swan Fault. Key infill intercepts returned that contain VG mineralization include;

 

Key Gold Intercepts:

 

  • 1,083 g/t Au over 2.8 m (ETW 2.6 m), including 8,610 g/t Au over 0.4 m (ETW 0.3 m) in hole UDH3108;
  • 40.8 g/t Au over 4.8 m (ETW 4.4 m) in hole UDH3103;
  • 52.4 g/t Au over 2.2 m (ETW 2.0 m) in hole UDH3104; and
  • 38.0 g/t Au over 3.8 m (ETW 3.5 m) in hole UDH3112

 

Results returned from infill drilling into the Swan Mineral Reserves to a spacing of 12.5 m x 12.5 m have verified the continuity of very high-grade mineralization in Swan. This drilling, coupled with model reconciliation performance, has provided increased confidence in the geological model which underpins the mine plan.

 

To view the figures accompanying the press release, please click on the following links:

 

Figure 1 – Location Map – Fosterville Gold Mine: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/ab0f4632-2b7a-4edf-960e-9080974197a6

 

Figure 2 – Lower Phoenix System: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/a009bbdc-dc7b-43d9-a270-e67b70fa8ee6

 

Figure 3 – Swan South Mineralization: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/09b331b7-15e5-44e6-9949-87bff1c43d35

 

Figure 4 – Swan Footwall Splay Mineralization: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/f4406c30-0d5b-4012-ad55-188fade78691

 

Figure 5 – Swan Reserve Mineralization: 

 

https://www.globenewswire.com/NewsRoom/AttachmentNg/c2261dcf-7bd3-4c46-b1cd-ea7c173e3851

Figure 6 – Cross Section, Lower Phoenix and Cygnet: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/1c54b575-57ea-424e-b7f9-320369ea6272

 

Figure 7 – Cygnet, Pen & Cob Fault Mineralization: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/c1bbfefe-7664-48ac-aad9-b0feda2217a7

 

Qualified Persons

 

Troy Fuller, MAIG, Director of Exploration, Australia, is a “Qualified Person” as such term is defined in National Instrument 43-101 and has reviewed and approved the technical information and data included in this News Release.

 

For further information regarding the Company’s 2018 Mineral Reserves and Mineral Resources estimates for the Fosterville Gold Mine, please refer to the Company’s news release dated February 21, 2019 and the Technical Report entitled “Updated NI 43-101 Technical Report Fosterville Gold Mine In the State of Victoria, Australia” effective December 31, 2018.

 

Drilling and Underground Sampling Assay QAQC

 

Kirkland Lake Gold has in place quality-control systems to ensure best practice in drilling, sampling and analysis of drill core. All diamond drill hole collars (Table 2) are accurately surveyed using a Leica TS16 Total Station instrument and down-hole deviations are measured by either electronic gyro or single-shot instruments.

 

Sampling consisted of diamond drill core that was either full core or half core sampled. Half core samples were cut longitudinally in half with a diamond saw; one-half of the drill core was sent to an independent laboratory for analysis and the other drill core half retained for reference. Sample pulps are returned from the assay laboratory for reference and future geological or metallurgical studies. Drill core sample intervals vary between 0.3 and 1.2 m in length and were determined from logging of sulfide and visible gold to geological boundaries.

 

Samples containing VG or considered likely to contain VG were separated from sulfide gold samples and dispatched independently for assaying. At the laboratory, “VG” jobs were processed through a single pulverizer and material barren of gold (‘quartz wash’) was crushed before and after each sample to minimize the potential for gold to contaminate successive samples.

 

Assays are either based on 25-gram or 40-gram charge fire assay. Mean grades are calculated using a variable lower grade cut-off (generally 2 g/t Au) and maximum 2 m internal dilution. No upper gold grade cut is applied to the data. However, during future Mineral Resource studies the requirement for assay top cutting will be assessed.

 

The majority of samples were assayed at On Site Laboratories, an independent laboratory in Bendigo, Victoria. The facility is registered ISO 9001:2008 (CERT-C33510). Some samples were assayed at Bureau Veritas, Adelaide. This facility is registered ISO 9001 : 2015 (CERT RN – 44 100 160145) and NATA accredited (1526).

 

About Kirkland Lake Gold Ltd.

 

Kirkland Lake Gold Ltd. is a growing gold producer operating in Canada and Australia that produced 723,701 ounces in 2018 and is on track to achieve significant production growth over the next three years, including target production of 950,000 – 1,000,000 ounces in 2019, 930,000 – 1,010,000 ounces in 2020 and 995,000 – 1,055,000 ounces in 2021. The production profile of the Company is anchored by two high-grade, low-cost operations, including the Macassa Mine located in Northern Ontario and the Fosterville Mine located in the state of Victoria, Australia. Kirkland Lake Gold’s solid base of quality assets is complemented by district scale exploration potential, supported by a strong financial position with extensive management and operational expertise.

 

 

 

Table 1: Drill Assay Intercepts for the Swan, Swan Footwall Splay, Swan South, Cygnet Zone and Cob Diamond Drilling, Lower Phoenix Mineralized System, Fosterville Gold Mine
  (The results are later than those presented in the December 31, 2018 Technical Report on the Mineral Resources and Mineral Reserves of The Fosterville Gold Mine, dated April 1, 2019, and available on sedar.com)

 

Hole ID From
(m)
To
(m)
Downhole Interval
(m)
Estimated True Width (m) Gold Grade
(g/t Au)
Geological Structure
Swan Fault Mineralization – Drill Intercepts within Mineral Reserves
UDH2483 (1) 353.65 357.25 3.6 3.3 625 Swan
Including (1) 353.65 354.0 0.35 0.3 6,123 Swan
UDH2700 (1) 362.45 371.4 8.95 8.4 10.9 Swan
UDH2717 (1) 100.15 107.25 7.1 4.8 381 Swan
Including (1) 101.2 102.2 1.0 0.7 922 Swan
And (1) 104.95 105.5 1.85 1.3 934 Swan
UDH2729 (1) 355.5 358.1 2.6 2.4 63.6 Swan
Including (1) 356.05 356.5 0.45 0.4 334 Swan
UDH2787 157.35 164.3 6.95 6.5 26.0 Swan
UDH2829 297.1 305.2 8.1 6.6 5.8 Swan
UDH2832 (1) 76.5 79.0 2.5 2.2 34.8 Swan
UDH2834 77.65 80.45 2.8 2.3 19.1 Swan
UDH2835 72.6 73.65 1.05 0.9 11.3 Swan
UDH2836 (1) 115.4 125.85 10.45 4.4 170 Swan
Including (1) 117.25 119.05 1.8 0.8 623 Swan
UDH2837 (1) 96.75 102.2 5.45 2.7 119 Swan
Including (1) 101.2 101.65 0.45 0.2 1,150 Swan
UDH2838 (1) 100.0 106.25 6.25 4.0 28.7 Swan
UDH2839 (1) 99.95 102.5 2.55 1.8 123 Swan
Including (1) 101.05 101.4 0.35 0.3 804 Swan
UDH2840 (1) 82.95 88.1 5.15 3.3 14.9 Swan
UDH2841 92.35 92.7 0.35 0.2 19.9 Swan
UDH2842 (1) 83.2 92.1 8.9 5.1 123 Swan
Including (1) 88.1 89.25 1.15 0.7 874 Swan
UDH2843 (1) 76.4 78.1 1.7 1.5 704 Swan
Including (1) 76.4 77.0 0.6 0.5 1,410 Swan
UDH2844 (1) 81.1 84.0 2.9 2.6 37.4 Swan
UDH2845 (1) 70.0 77.7 7.7 7.2 133 Swan
Including (1) 72.2 74.9 2.7 2.5 352 Swan
UDH2846 (1) 82.0 84.8 2.8 2.3 202 Swan
Including (1) 83.15 84.15 1.0 0.8 560 Swan
UDH2847 (1) 106.45 109.45 3.0 1.5 55.9 Swan
Including (1) 108.3 108.7 0.4 0.2 400 Swan
UDH2848 (1) 95.3 98.05 2.75 1.8 234 Swan
UDH2849 (1) 96.5 97.2 2.7 2.2 840 Swan
Including (1) 96.5 99.2 0.7 0.6 3,220 Swan
UDH2850 84.55 86.5 1.95 1.6 44.7 Swan
UDH2851 (1) 77.55 78.9 1.35 1.2 120 Swan
UDH2852 70.45 74.0 3.55 2.7 10.6 Swan
UDH2853 (1) 71.15 75.7 4.55 3.9 302 Swan
Including (1) 72.5 74.15 1.65 1.4 824 Swan
UDH2854 (1) 69.0 72.6 3.6 3.3 287 Swan
Including (1) 72.0 72.6 0.6 0.5 1,710 Swan
UDH2855 (1) 67.9 69.3 1.4 1.3 40.3 Swan
UDH2856 (1) 66.05 67.4 1.35 1.3 339 Swan
UDH2857 65.4 67.5 2.1 2.0 13.4 Swan
UDH2858 (1) 66.4 67.5 1.1 1.1 34.3 Swan
UDH2859 (1) 63.6 66.6 3.0 2.8 505 Swan
Including (1) 66.0 66.3 0.3 0.3 4,060 Swan
UDH2860 (1) 60.8 66.6 5.8 5.7 32.3 Swan
Including (1) 63.15 64.4 1.25 1.2 114 Swan
UDH2862 (1) 65.2 71.55 6.35 5.5 34.4 Swan
Including (1) 71.0 71.55 0.55 0.5 318 Swan
UDH2863 (1) 64.15 70.45 6.3 5.9 367 Swan
Including (1) 64.15 66.25 2.1 2.0 1,058 Swan
UDH2864 (1) 65.2 68.5 3.3 3.1 232 Swan
Including (1) 65.7 66.25 0.55 0.5 1,340 Swan
UDH2865 (1) 64.4 65.9 1.5 1.4 214 Swan
Including (1) 65.0 65.4 0.4 0.4 680 Swan
UDH2866 (1) 57.7 68.4 10.7 10.1 138 Swan
Including (1) 61.65 62.9 1.25 1.2 1,094 Swan
UDH2867 61.25 62.95 1.7 1.6 10.4 Swan
UDH2868 (1) 57.0 67.2 10.2 9.9 45.2 Swan
Including (1) 59.55 59.85 0.3 0.3 1,180 Swan
UDH2869 (1) 54.25 67.5 13.25 12.0 145 Swan
Including (1) 59.9 62.1 2.2 2.0 840 Swan
UDH2870 70.0 72.55 2.55 2.2 269 Swan
UDH2871 (1) 67.2 69.2 2 1.9 57.6 Swan
Including (1) 68.8 69.2 0.4 0.4 263 Swan
UDH2872 (1) 63.25 66.8 3.55 3.2 924 Swan
Including (1) 63.9 64.35 0.45 0.4 6,590 Swan
UDH2873 83.4 84.9 1.5 1.2 36.2 Swan
UDH2874 (1) 80.35 83.9 3.55 2.9 117 Swan
Including (1) 80.8 81.7 0.9 0.7 430 Swan
UDH2877 72.3 73.15 0.85 0.7 149 Swan
UDH2878 76.3 78.2 1.9 1.6 33.6 Swan
UDH2880 69.0 70.45 1.45 1.3 12.0 Swan
UDH2882 68.5 69.7 1.2 1.0 128 Swan
UDH2883 66.1 67.4 1.3 1.3 65.7 Swan
UDH2917 55.8 56.5 0.7 0.5 6.0 Swan
UDH2919 53.4 57.4 4 3.3 4.8 Swan
UDH2920 53.7 64.0 10.3 7.4 12.8 Swan
UDH2928 289.6 291.6 2.0 1.7 9.3 Swan
UDH2971 63.4 65.8 2.4 1.8 10.0 Swan
UDH2972 68.6 71.85 3.25 2.2 9.1 Swan
UDH2973 70.4 72.7 2.3 2.0 4.5 Swan
UDH2975 73.8 78.25 4.45 3.1 6.6 Swan
UDH2976 82.6 87.7 5.1 3.8 15.8 Swan
UDH2979 64.95 66.3 1.35 1.1 15.2 Swan
UDH2981 79.3 84.1 4.8 2.6 5.1 Swan
UDH2983 59.75 62.1 2.35 2.0 8.8 Swan
UDH2984 84.0 87.1 3.1 2.7 8.2 Swan
UDH2985 73.2 77.0 3.8 3.2 12.2 Swan
UDH2986 78.1 88.45 10.38 8.8 9.2 Swan
UDH2987 90.65 94.15 3.5 3.0 14.5 Swan
UDH2995 (1) 70.25 71.95 1.7 1.0 6.3 Swan
UDH3017 (1) 31.4 41.0 9.6 9.2 18.2 Swan
UDH3023 (1) 37.75 43.45 5.7 5.6 306 Swan
Including (1) 42.65 43.05 0.4 0.3 4,000 Swan
UDH3024 (1) 33.0 40.0 7.0 6.8 918 Swan
Including (1) 36.0 39.7 3.7 3.3 1,722 Swan
UDH3054 111.8 113.5 1.7 1.5 26.4 Swan
UDH3055 106.9 112.9 6.0 3.6 34.4 Swan
UDH3060 (1) 63.6 71.6 8.0 7.8 184 Swan
UDH3061 (1) 63.3 68.65 5.35 5.25 87.6 Swan
UDH3063 (1) 67.6 74.0 6.4 6.2 17.9 Swan
UDH3064 92.85 96.6 3.75 2.5 3.9 Swan
UDH3064A 90.65 92.9 2.25 1.8 177 Swan
UDH3065 (1) 82.4 86.8 4.4 3.5 14.1 Swan
UDH3066 (1) 73.95 80.55 6.6 6.0 97.1 Swan
UDH3067 (1) 67.4 77.0 9.6 9.2 139 Swan
UDH3076 49.45 52.05 2.6 1.4 33.2 Swan
UDH3077 (1) 58.2 62.7 4.5 2.2 320 Swan
UDH3101 (1) 77.5 84.25 6.75 6.1 365 Swan
Including (1) 81.0 82.15 1.15 1.0 1,629 Swan
UDH3102 (1) 75.65 77.7 2.05 2.0 34.1 Swan
UDH3103 (1) 65.1 76.3 11.2 11.0 229 Swan
Including (1) 68.7 69.3 0.6 0.6 3,520 Swan
UDH3104 66.2 72.0 5.8 5.7 22.1 Swan
UDH3105 (1) 65.1 72.1 7.0 6.8 25.8 Swan
Including (1) 71.1 71.5 0.4 0.4 339 Swan
UDH3106 (1) 74.0 79.2 5.2 4.3 120 Swan
Including (1) 77.05 78.8 1.75 1.5 322 Swan
UDH3107 96.35 97.3 0.95 0.7 7.6 Swan
UDH3108 (1) 83.45 88.55 5.1 4.2 48.8 Swan
Including (1) 85.9 86.3 0.4 0.3 368 Swan
UDH3109 77.4 77.95 0.55 0.5 8.6 Swan
UDH3110 (1) 74.85 76.45 1.6 1.5 419 Swan
Including (1) 75.5 75.95 0.45 0.4 1,300 Swan
UDH3111 (1) 68.9 78.9 10.0 9.9 35.4 Swan
Including (1) 69.25 69.8 0.55 0.5 472 Swan
UDH3112 (1) 70.6 73.35 2.75 2.4 791 Swan
Including (1) 71.15 71.8 0.65 0.6 3,300 Swan
UDH3113 (1) 71.3 75.0 3.7 3.7 40.6 Swan
Including (1) 72.1 72.4 0.3 0.3 395 Swan
UDH3114 70.7 74.2 3.5 2.7 16.4 Swan
UDH3115 83.25 88.6 5.35 4.3 14.6 Swan
UDH3116 94.25 95.1 0.85 0.8 31.4 Swan
UDH3117 91.5 93.4 1.9 1.7 69.3 Swan
UDH3118 (1) 95.8 97.15 1.35 1.1 111 Swan
Including (1) 96.1 96.45 0.35 0.3 356 Swan
UDH3119 198.9 212.15 13.25 11.5 3.0 Swan
UDH3119 205.25 212.15 6.9 6.5 3.8 Swan
UDH3119A 199.8 203.1 3.3 3.1 7.0 Swan
UDH3164 (1) 101.85 103.65 1.8 1.6 15.9 Swan
UDH3165 92.45 94.9 2.45 1.9 10.6 Swan
UDH3166 (1) 76.0 78.1 2.1 2.0 298 Swan
Including (1) 77.0 77.4 0.4 0.4 1,470 Swan
UDH3171 (1) 81.1 86.1 5.0 4.7 488 Swan
Including (1) 84.85 85.8 0.95 0.9 2,527 Swan
UDH3172 (1) 67.35 74.75 7.4 7.4 159 Swan
Including (1) 73.25 74.0 0.75 0.8 1,448 Swan
UDH3174 (1) 67.1 74.5 7.4 6.7 34.7 Swan
Including (1) 70.35 71.3 0.95 0.9 230 Swan
UDH3176A 83.6 87.05 3.45 3.4 12.6 Swan
UDH3177 (1) 88.0 95.4 7.4 6.1 39.5 Swan
Including (1) 94.8 95.1 0.3 0.3 730 Swan
UDH3178 (1) 84.7 92.7 8.0 5.1 131 Swan
Including (1) 86.35 86.65 0.3 0.2 2,250 Swan
UDH3180 158.1 163.55 5.45 4.2 15.0 Swan
UDH3184A (1) 148.75 155.8 7.05 6.1 17.7 Swan
Including (1) 150.8 151.25 0.45 0.4 145 Swan
UDH3186 (1) 118.65 120.0 1.35 0.9 321 Swan
Including (1) 118.65 119.3 0.65 0.4 639 Swan
UDH3188 (1) 121.0 128.75 7.75 2.7 342 Swan
Including (1) 125.9 127.2 1.3 0.4 1,612 Swan
Swan Footwall Splay Mineralization – Drill Intercepts within Mineral Reserves
UDH3061 77.55 78.7 1.15 1.1 18.8 Swan FW Splay
UDH3063 93.65 95.0 1.35 1.0 5.4 Swan FW Splay
UDH3101 95.9 96.7 0.8 0.7 6.5 Swan FW Splay
UDH3102 87.6 88.7 1.1 1.0 6.5 Swan FW Splay
UDH3103 (1) 76.3 81.1 4.8 4.4 40.8 Swan FW Splay
Including (1) 79.05 79.35 0.3 0.3 267 Swan FW Splay
UDH3104 (1) 76.85 79.0 2.15 2.0 52.4 Swan FW splay
Including (1) 77.9 78.25 0.35 0.3 266 Swan FW splay
UDH3105 82.35 83.95 1.6 1.5 4.2 Swan FW splay
UDH3107 98.35 99.1 0.75 0.7 16.1 Swan FW splay
UDH3108 (1) 90.85 93.65 2.8 2.6 1,083 Swan FW splay
Including (1) 90.85 91.2 0.35 0.3 8,610 Swan FW splay
UDH3109 84.1 86.0 1.9 1.9 4.4 Swan FW splay
UDH3111 (1) 81.2 82.5 1.3 1.3 62.4 Swan FW splay
UDH3112 (1) 83.45 84.25 3.75 3.5 38.0 Swan FW splay
Including (1) 83.75 84.25 0.5 0.5 229 Swan FW splay
UDH3113 84.1 85.8 1.7 1.6 28.6 Swan FW splay
UDH3114 92.2 97.1 4.9 4.9 6.9 Swan FW splay
UDH3115 95.15 96.3 1.15 0.4 8.0 Swan FW splay
UDH3166 82.2 85.0 2.8 2.6 13.0 Swan FW splay
UDH3060 76.25 79.1 2.85 2.7 2.9 Swan FW Splay
Swan South Mineralization – Drill Intercepts outside of Mineral Reserves
UDE175A 941.3 956.2 14.9 11.4 4.4 Swan South
UDE181A 927.1 932.55 5.45 4.2 8.7 Swan South
UDE184 819.75 823.0 3.25 2.5 8.8 Swan South
UDE184A 803.7 808.6 4.9 3.8 6.7 Swan South
UDE184B 772.6 777.0 4.4 3.4 5.0 Swan South
UDE184C 772.45 777.4 4.95 3.8 6.8 Swan South
UDE185A 871.9 879.1 7.2 7.1 7.9 Swan South
UDE199 773.0 781.75 8.75 6.7 7.3 Swan South
UDE200 716.5 732.0 15.5 11.9 4.9 Swan South
UDE200A 719.0 726.8 7.8 6.0 4.6 Swan South
UDE201 835.45 837.65 2.2 1.7 0.2 Swan South
UDE203 622.4 626.4 4.0 3.1 2.2 Swan South
UDE204 634.3 652.3 18 13.8 6.2 Swan South
UDE205 627.5 633.65 6.15 4.7 10.4 Swan South
UDE206 656.9 660.0 3.1 2.4 5.5 Swan South
UDE207 759.2 759.7 0.5 0.4 0.0 Swan South
UDE208 675.0 681.8 6.8 5.2 9.9 Swan South
Including 678.2 678.7 0.5 0.4 65.2 Swan South
UDE209 681.5 685.0 3.5 2.7 1.8 Swan South
UDE210 709.6 715.5 5.9 4.5 14.8 Swan South
UDE211 729.4 735.2 5.8 4.4 7.6 Swan South
UDE212A 1045.1 1045.5 0.4 0.3 2.6 Swan South
UDE265 621.2 621.8 0.6 0.5 2.1 Swan South
UDH2482 390.0 402.65 12.65 7.3 3.6 Swan South
UDH2489 (1) 386.0 391.0 5.0 4.7 59.1 Swan South
Including (1) 389.3 390 0.7 0.7 319 Swan South
UDH2831 257.0 258.7 1.7 1.6 14.6 Swan South
UDH3068 (1) 67.3 75.0 7.7 7.5 63.2 Swan South
UDH3094 392.4 393.25 0.85 0.8 6.2 Swan South
UDH3120 202.3 212.7 10.4 10.1 8.0 Swan South
UDH3122 199.1 204.3 5.2 4.2 5.8 Swan South
UDH3123 199.3 200.1 0.8 0.8 2.8 Swan South
UDH3124 198.6 199.8 1.2 1.1 12.5 Swan South
UDH3126 254.45 260.9 6.45 5.6 6.4 Swan South
UDH3127 (1) 249.9 253.35 3.45 3.0 19.7 Swan South
Including (1) 251.8 252.1 0.3 0.3 141 Swan South
UDH3128 230.1 233.95 3.85 3.5 8.5 Swan South
UDH3129 237.0 240.5 3.5 2.9 8.1 Swan South
UDH3130 231.85 234.0 2.15 2.0 13.1 Swan South
UDH3131 (1) 266.7 277.85 11.2 9.7 6.8 Swan South
UDH3132 (1) 268.3 275.85 7.55 5.5 87.6 Swan South
UDH3133A 299.35 300.1 0.75 0.7 5.4 Swan South
UDH3134 299.0 303.0 4.0 2.8 2.7 Swan South
UDH3135 248.2 255.5 7.3 6.7 6.4 Swan South
UDH3136 254.8 259.9 5.1 5.0 4.3 Swan South
UDH3137 (1) 246.9 249.4 2.5 2.1 2.2 Swan South
UDH3138 249.25 253.9 4.65 4.2 5 Swan South
UDH3139 247.2 251.2 4.0 3.7 6.3 Swan South
UDH3140 237.7 241.3 3.6 3.5 9.3 Swan South
UDH3141 239.65 240.7 1.05 1.0 4.3 Swan South
UDH3142 (1) 255.5 260.65 5.15 4.7 45 Swan South
Including (1) 258.7 259.4 0.7 0.7 267 Swan South
UDH3143 270.2 283.1 12.9 12.1 26.4 Swan South
UDH3145 (1) 242.25 243.5 1.25 1.2 40.4 Swan South
Including (1) 242.25 242.95 0.7 0.7 73.6 Swan South
UDH3146 (1) 239.1 245.5 6.4 6.3 4.6 Swan South
UDH3148 236.65 240.3 3.65 3.6 8.5 Swan South
UDH3148A 235.9 240.0 4.1 3.6 5.9 Swan South
UDH3149 245.45 249.6 4.15 4.0 6.9 Swan South
UDH3149A 238.0 239.7 1.7 1.6 16.0 Swan South
UDH3150 231.1 237.6 6.5 6.5 9.0 Swan South
UDH3151 234.4 236.45 2.05 1.9 6.2 Swan South
UDH3153 234.0 237.3 3.3 3.3 8.9 Swan South
UDH3154 238.75 245.45 6.7 6.3 13.5 Swan South
UDH3156 242.0 249.2 7.2 7.1 8.7 Swan South
UDH3179 152.55 155.45 2.9 2.9 7.1 Swan South
UDH3182 139.2 140.5 1.3 1.1 4.5 Swan South
UDH3183 142.2 143.7 1.5 1.2 10.2 Swan South
UDH3228 248.0 250.05 2.05 1.8 5.2 Swan South
Swan Footwall Splay Mineralization – Drill Intercepts outside of Mineral Reserves
UDE200A 728.25 743.95 15.7 12.0 2.8 Swan FW Splay
UDE204 671.9 672.7 0.8 0.5 42.6 Swan FW Splay
UDE208 684.5 687.0 2.5 2.3 6.2 Swan FW Splay
UDH3124 225.2 226.0 0.8 0.8 17.9 Swan FW Splay
UDH3130 248.0 249.1 1.1 1.0 7.9 Swan FW splay
Cygnet Mineralized Zone – Drill intercepts outside of Mineral Reserves
UDE181A 1,124.05 1,130.65 6.6 5.5 6.6 Cygnet
Including 1,127.1 1,127.4 0.3 0.3 27.9 Cygnet
UDE184A 956.7 957.0 0.3 0.3 1.8 Cygnet
UDE185A 1,054.6 1,056.9 2.3 2.1 8.7 Cygnet
UDE195 222.0 280.7 58.7 20.0 4.8 Cygnet
UDE201 1030.5 1031 0.5 0.4 2.7 Cygnet
UDE203 770.6 771.0 0.4 0.3 2.9 Cygnet
UDE204 820.7 821.0 0.3 0.3 5.0 Cygnet
UDE205 804.45 804.9 0.45 0.4 4.6 Cygnet
UDE206 848.1 848.4 0.3 0.3 5.0 Cygnet
UDE207 1011.5 1011.95 0.5 0.4 2.1 Cygnet
UDE208 790.6 790.9 0.3 0.3 1.8 Cygnet
UDE209 888.0 891.1 3.1 2.6 7.9 Cygnet
UDE210 916.6 917.3 0.7 0.6 3.2 Cygnet
UDE211 975.2 977.8 2.6 2.2 3.3 Cygnet
UDE243 617.15 619.75 2.6 2.5 2.8 Cygnet
UDE245 207.7 208.9 1.2 1.1 2.2 Cygnet
UDE246 225.9 227.4 1.5 1.2 11.5 Cygnet
UDE247 (1) 212.6 214.4 1.8 1.5 28.4 Cygnet
UDE248 277.05 278.65 1.6 1.3 7.9 Cygnet
UDE249 315.45 316.75 1.3 1.1 8.3 Cygnet
UDE250 338.9 340.0 1.1 0.9 3.4 Cygnet
UDE258 296.1 297.15 1.05 0.9 3.0 Cygnet
UDE259 318.4 325.2 6.8 5.6 4.4 Cygnet
UDE260 319.2 320.9 1.7 1.0 3.5 Cygnet
UDE261 364.1 365.3 1.2 1.0 9.3 Cygnet
UDE263 391.35 392.35 1.0 0.8 7.3 Cygnet
UDE265 754.95 756.25 1.3 1.1 9.4 Cygnet
UDE280 274.65 280.05 5.4 4.5 11.2 Cygnet
UDE282 355.3 357.5 2.2 1.2 0.1 Cygnet
UDE282A 356.0 357.0 1.0 0.8 0.0 Cygnet
UDH2831 371.0 377.0 6.0 5.7 6.1 Cygnet
UDH2886 384.65 388.15 3.5 3.2 11.4 Cygnet
UDH2887 400.65 405.6 4.95 3.8 4.1 Cygnet
UDH2928 379.0 381.95 3.0 2.8 4.9 Cygnet
UDH2931 97.0 101.3 4.3 2.3 3.3 Cygnet
UDH2932 58.0 59.2 1.2 1.0 18.8 Cygnet
UDH2933 69.9 73.85 3.95 3.0 11.4 Cygnet
UDH3068 208.1 209.75 1.65 1.4 6.1 Cygnet
UDH3094 477.4 479.55 2.15 1.9 7.2 Cygnet
UDH3122 266.7 272.6 5.3 5.2 12.3 Cygnet
UDH3163 341.25 343.0 1.75 1.4 2.6 Cygnet
UDH3203 325.0 327.2 2.2 1.4 2.4 Cygnet
UDH3106 240.1 240.8 0.7 0.5 10.7 Cygnet
UDE248 (1) 194.55 196.05 1.5 1.3 9.2 Pen
UDE249 225.95 226.7 0.75 0.3 7.3 Pen
UDE259 272.3 272.6 0.3 0.3 0.0 Pen
UDE261 333.55 334.55 1.0 0.6 23.1 Pen
UDE262 (1) 317.7 318.9 1.2 0.9 239 Pen
Including (1) 318.05 318.45 0.4 0.3 701 Pen
UDE263 315.2 316.1 0.9 0.5 5.7 Pen
UDE280 198.0 200.6 2.6 2.1 3.1 Pen
Cob Fault Mineralization – Drill Intercepts outside of Mineral Reserves
UDE184 1,049.0 1,051.0 2.0 1.7 5.7 Cob
UDE185A 1,079.7 1,080.4 0.7 0.6 5.7 Cob
UDE200 922.25 925.65 3.4 2.4 11.1 Cob

 

  Notes:
  (1) – Visible-gold observed in drill intercept.

Drill intercepts greater than 30 Gram-Metre (gold grade x estimated true width) or containing visible-gold are shown in bold text.

For Table 2 (below), collar locations are in Fosterville Mine Grid coordinate system.

For Table 2 (below), Collar Plunges with negative values indicate drilling downwards from the horizontal.

 

Table 2:                 Underground Diamond Drill Hole Collar Locations, Fosterville Gold Mine

Hole ID Northing
(m)
Easting
(m)
Elevation
(m)
Collar
Azimuth (°)
Collar
Plunge (°)
Total Depth
(m)
Drilled Metres
Underground Diamond Drilling inside Swan Mineral Reserves
UDH2483 6,226 1,341 4,194 84.9 -43.8 377.9 377.9
UDH2700 6,226 1,341 4,194 92.0 -63.0 431.8 431.8
UDH2717 6,577 1,622 4,101 229.4 -14.4 117.0 117.0
UDH2729 6,226 1,341 4,195 86.0 -49.5 384.2 384.2
UDH2787 6,392 1,395 4,055 96.2 -39.9 219.0 219.0
UDH2829 6,353 1,406 4,192 113.7 -31.5 349.0 349.0
UDH2832 6,401 1,512 4,044 40.0 2.0 89.0 89.0
UDH2834 6,401 1,511 4,045 48.0 5.0 96.0 96.0
UDH2835 6,401 1,512 4,044 54.0 -1.0 88.0 88.0
UDH2836 6,410 1,497 4,045 17.0 17.0 147.4 147.4
UDH2837 6,410 1,497 4,045 17.0 9.0 119.3 119.3
UDH2838 6,410 1,497 4,045 29.0 13.5 123.4 123.4
UDH2839 6,410 1,498 4,045 36.0 13.0 114.0 114.0
UDH2840 6,410 1,497 4,045 27.0 6.0 108.1 108.1
UDH2841 6,410 1,497 4,045 35.0 9.0 105.0 105.0
UDH2842 6,410 1,497 4,044 18.0 2.0 101.8 101.8
UDH2843 6,410 1,497 4,044 19.0 -9.0 93.0 93.0
UDH2844 6,410 1,497 4,044 25.0 -2.0 98.5 98.5
UDH2845 6,410 1,497 4,044 27.0 -10.0 92.4 92.4
UDH2846 6,410 1,497 4,044 33.0 1.0 93.0 93.0
UDH2847 6,397 1,514 4,045 27.0 16.0 116.8 116.8
UDH2848 6,397 1,514 4,045 39.0 15.5 115.0 115.0
UDH2849 6,396 1,514 4,045 29.0 11.0 107.5 107.5
UDH2850 6,396 1,514 4,045 28.0 4.0 104.9 104.9
UDH2851 6,397 1,514 4,044 26.0 -4.0 98.9 98.9
UDH2852 6,396 1,514 4,044 41.0 -4.0 84.0 84.0
UDH2853 6,396 1,514 4,044 24.0 -11.0 84.0 84.0
UDH2854 6,396 1,514 4,044 33.0 -9.0 81.0 81.0
UDH2855 6,396 1,514 4,044 45.0 -12.0 79.0 79.0
UDH2856 6,390 1,517 4,044 45.0 -20.0 80.0 80.0
UDH2857 6,390 1,517 4,044 49.0 -28.0 78.0 78.0
UDH2858 6,390 1,517 4,044 39.0 -32.0 89.0 89.0
UDH2859 6,390 1,517 4,043 31.0 -38.5 86.8 86.8
UDH2860 6,390 1,517 4,043 35.0 -50.0 87.0 87.0
UDH2862 6,407 1,504 4,044 14.0 -18.0 83.9 83.9
UDH2863 6,407 1,504 4,044 25.0 -20.0 80.9 80.9
UDH2864 6,407 1,504 4,043 18.0 -26.0 81.0 81.0
UDH2865 6,407 1,504 4,043 38.0 -23.0 78.0 78.0
UDH2866 6,407 1,504 4,043 29.0 -31.0 75.0 75.0
UDH2867 6,407 1,504 4,043 40.0 -34.5 75.0 75.0
UDH2868 6,407 1,504 4,043 35.0 -43.0 87.0 87.0
UDH2869 6,407 1,504 4,043 28.0 -52.5 84.0 84.0
UDH2870 6,390 1,517 4,044 31.0 -17.0 86.9 86.9
UDH2871 6,390 1,517 4,044 29.0 -28.0 78.0 78.0
UDH2872 6,391 1,517 4,043 19.0 -57.0 83.0 83.0
UDH2873 6,390 1,517 4,045 48.0 7.0 101.9 101.9
UDH2874 6,390 1,517 4,045 56.0 4.0 90.0 90.0
UDH2877 6,390 1,517 4,044 56.0 -4.0 83.6 83.6
UDH2878 6,390 1,517 4,044 64.0 0.0 89.9 89.9
UDH2880 6,390 1,517 4,044 49.0 -9.0 84.0 84.0
UDH2882 6,390 1,517 4,044 60.0 -9.0 83.0 83.0
UDH2883 6,390 1,517 4,044 55.0 -18.0 77.0 77.0
UDH2917 6,484 1,672 4,086 234.0 5.0 69.1 69.1
UDH2919 6,463 1,685 4,087 244.0 15.0 71.7 71.7
UDH2920 6,463 1,685 4,086 245.0 6.0 70.7 70.7
UDH2928 6,353 1,406 4,193 100.7 -26.3 415.7 415.7
UDH2971 6,411 1,718 4,085 256.4 17.9 83.1 83.1
UDH2972 6,411 1,718 4,084 260.3 11.2 86.6 86.6
UDH2973 6,410 1,719 4,084 244.7 7.8 92.9 92.9
UDH2975 6,410 1,719 4,084 249.2 5.8 89.9 89.9
UDH2976 6,410 1,719 4,084 250.8 -3.7 126.1 126.1
UDH2979 6,432 1,704 4,085 254.1 6.9 92.9 92.9
UDH2981 6,432 1,703 4,085 258.0 -2.2 92.6 92.6
UDH2983 6,442 1,697 4,086 259.5 10.1 80.6 80.6
UDH2984 6,440 1,697 4,085 250.6 -8.1 98.9 98.9
UDH2985 6,410 1,719 4,084 229.5 5.9 100.0 100.0
UDH2986 6,410 1,719 4,084 234.8 -4.4 108.0 108.0
UDH2987 6,409 1,719 4,084 248.7 -7.6 104.7 104.7
UDH2995 6,484 1,672 4,086 234.0 -2.3 83.8 83.8
UDH3017 6,434 1,510 4,038 11.0 -44.0 50.5 50.5
UDH3023 6,434 1,509 4,038 22.9 -58.4 50.5 50.5
UDH3024 6,435 1,522 4,038 17.8 -19.6 48.8 48.8
UDH3054 6,314 1,536 4,042 55.0 10.7 126.1 126.1
UDH3055 6,314 1,536 4,042 61.1 11.3 113.5 113.5
UDH3060 6,314 1,536 4,041 54.4 -31.5 86.8 86.8
UDH3061 6,314 1,536 4,040 62.7 -39.5 89.0 89.0
UDH3063 6,314 1,536 4,040 58.2 -59.9 102.0 102.0
UDH3064 6,347 1,528 4,046 55.3 -1.1 107.5 107.5
UDH3064A 6,348 1,528 4,045 55.3 -1.1 110.2 110.2
UDH3065 6,347 1,528 4,045 59.9 -6.5 98.5 98.5
UDH3066 6,347 1,528 4,045 52.9 -15.9 89.6 89.6
UDH3067 6,347 1,528 4,045 69.8 -26.5 89.7 89.7
UDH3076 6,408 1,555 4,048 75.9 11.3 62.0 62.0
UDH3077 6,408 1,555 4,048 63.5 21.6 74.6 74.6
UDH3101 6,331 1,532 4,044 56.0 -8.0 99.2 99.2
UDH3102 6,331 1,532 4,044 64.0 -11.0 100.7 100.7
UDH3103 6,331 1,532 4,044 62.0 -26.0 89.6 89.6
UDH3104 6,331 1,532 4,043 67.0 -44.0 86.5 86.5
UDH3105 6,331 1,532 4,043 60.0 -52.5 95.4 95.4
UDH3106 6,331 1,532 4,043 62.5 -63.5 260.1 260.1
UDH3107 6,310 1,537 4,042 66.0 4.0 111.0 111.0
UDH3108 6,310 1,537 4,041 65.0 -1.0 113.7 113.7
UDH3109 6,310 1,537 4,041 75.0 -13.0 101.9 101.9
UDH3110 6,310 1,537 4,041 70.0 -20.5 95.9 95.9
UDH3111 6,310 1,537 4,040 73.5 -30.5 95.8 95.8
UDH3112 6,309 1,537 4,040 86.5 -43.5 95.7 95.7
UDH3113 6,310 1,537 4,040 77.0 -53.0 98.5 98.5
UDH3114 6,310 1,537 4,040 72.0 -64.0 110.1 110.1
UDH3115 6,310 1,537 4,041 82.5 -10.0 107.8 107.8
UDH3116 6,310 1,537 4,041 85.0 -3.0 111.2 111.2
UDH3117 6,309 1,537 4,041 78.5 -2.0 102.2 102.2
UDH3118 6,310 1,537 4,042 74.0 4.0 113.9 113.9
UDH3119 6,084 1,391 3,955 48.0 -26.0 266.6 266.6
UDH3119A 6,084 1,391 3,955 57.6 -19.8 209.8 209.8
UDH3164 6,309 1,537 4,041 90.5 2.5 119.5 119.5
UDH3165 6,309 1,538 4,041 90.0 -8.0 111.5 111.5
UDH3166 6,310 1,537 4,041 81.0 -24.0 96.0 96.0
UDH3171 6,373 1,519 4,044 347.0 -48.0 95.7 95.7
UDH3172 6,372 1,520 4,044 15.7 -50.1 116.8 116.8
UDH3174 6,372 1,520 4,044 25.0 -54.0 95.7 95.7
UDH3176A 6,371 1,520 4,044 66.0 -84.0 102.0 102.0
UDH3177 6,369 1,521 4,044 122.0 -83.0 105.0 105.0
UDH3178 6,369 1,521 4,044 111.0 -72.0 102.0 102.0
UDH3180 6,400 1,396 4,054 98.0 -40.0 170.5 170.5
UDH3184A 6,400 1,396 4,054 86.5 -36.0 194.2 194.2
UDH3186 6,396 1,395 4,055 77.0 -41.0 205.1 205.1
UDH3188 6,401 1,396 4,054 70.0 -32.0 196.2 196.2
Underground Diamond Drilling outside of Swan Mineral Reserves
UDE175A 5,553 1,446 4,447 90.8 -84.9 1,071.0 422.9
UDE181A 5,681 1,403 4,428 92.8 -79.7 1,140.0 769.0
UDE184 5,831 1,350 4,404 100.5 -74.3 1,142.8 1,142.8
UDE184A 5,831 1,350 4,404 100.5 -74.3 1,038.0 587.1
UDE184B 5,831 1,350 4,404 100.5 -74.3 813.0 521.6
UDE184C 5,831 1,350 4,404 100.5 -74.3 782.0 25.0
UDE185A 5,830 1,350 4,404 104.9 -79.2 1,105.3 616.2
UDE195 6,174 1,854 4,246 240.8 -71.4 670.0 670.0
UDE199 5,956 1,306 4,383 105.1 -71.3 1,011.5 1,011.5
UDE200 5,956 1,306 4,383 102.9 -68.4 987.0 987.0
UDE200A 5,956 1,306 4,383 102.9 -68.4 761.9 86.1
UDE201 5,956 1,306 4,383 109.4 -78.9 1,128.1 1,128.1
UDE203 6,081 1,288 4,362 90.9 -58.5 836.8 836.8
UDE204 6,081 1,288 4,362 94.4 -61.4 846.0 846.0
UDE205 6,082 1,285 4,362 98.0 -66.2 852.1 852.1
UDE206 6,082 1,285 4,362 99.4 -71.2 861.1 861.1
UDE207 6,081 1,286 4,362 102.0 -78.5 1,106.1 1,106.1
UDE208 5,956 1,311 4,383 83.7 -65.0 900.0 900.0
UDE209 5,956 1,306 4,383 88.2 -67.5 903.0 903.0
UDE210 5,956 1,306 4,383 86.5 -70.7 951.2 951.2
UDE211 5,956 1,306 4,383 84.0 -75.2 1,004.7 1,004.7
UDE212A 5,553 1,446 4,447 93.9 -84.3 1,113.0 147.0
UDE243 5,830 1,355 4,404 77.6 -45.1 677.6 677.6
UDE245 6,559 1,482 4,046 95.5 -21.3 330.0 330.0
UDE246 6,559 1,482 4,045 103.9 -35.7 350.9 350.9
UDE247 6,560 1,482 4,045 103.7 -48.0 356.9 356.9
UDE248 6,560 1,482 4,045 104.1 -61.3 686.6 686.6
UDE249 6,582 1,471 4,046 118.2 -67.0 452.9 452.9
UDE250 6,582 1,471 4,046 126.9 -74.4 502.4 502.4
UDE258 6,802 1,442 4,170 109.2 -36.1 317.9 317.9
UDE259 6,802 1,442 4,169 111.6 -46.5 447.0 447.0
UDE260 6,802 1,442 4,169 110.9 -54.3 456.3 456.3
UDE261 6,802 1,442 4,169 113.0 -64.2 445.0 445.0
UDE262 6,802 1,442 4,169 107.5 -59.6 443.7 443.7
UDE263 6,801 1,441 4,169 119.8 -70.6 551.9 551.9
UDE265 6,081 1,288 4,362 89.2 -54.9 905.7 905.7
UDE280 6,583 1,471 4,046 64.3 -67.1 494.9 494.9
UDE282 6,801 1,442 4,170 128.2 -34.0 416.9 416.9
UDE282A 6,801 1,442 4,170 128.2 -34.0 377.6 42.7
UDH2482 6,234 1,339 4,194 100.0 -27.0 428.9 428.9
UDH2489 6,226 1,341 4,195 101.0 -49.0 411.0 411.0
UDH2831 6,354 1,406 4,193 73.0 -29.4 396.0 396.0
UDH2886 6,444 1,317 4,060 99.7 -20.8 424.8 424.8
UDH2887 6,444 1,317 4,060 95.8 -40.0 501.0 501.0
UDH2931 6,463 1,690 4,085 13.9 -84.5 119.9 119.9
UDH2932 6,464 1,691 4,085 86.4 -41.5 74.6 74.6
UDH2933 6,463 1,690 4,085 123.0 -67.9 113.7 113.7
UDH2989 6,502 1,656 4,086 235.1 -6.3 92.9 92.9
UDH3068 6,347 1,528 4,044 52.5 -34.0 236.4 236.4
UDH3094 6,227 1,341 4,195 88.0 -26.0 492.1 492.1
UDH3120 6,083 1,391 3,955 56.5 -25.7 248.0 248.0
UDH3122 6,083 1,391 3,955 61.2 -33.1 368.9 368.9
UDH3123 6,084 1,391 3,955 44.5 -29.2 257.9 257.9
UDH3124 6,083 1,391 3,955 58.0 -41.0 260.6 260.6
UDH3126 6,046 1,366 3,949 66.1 -18.5 286.2 286.2
UDH3127 6,046 1,366 3,949 65.0 -22.8 281.6 281.6
UDH3128 6,046 1,366 3,949 58.6 -33.5 269.3 269.3
UDH3129 6,046 1,366 3,949 66.0 -33.5 253.9 253.9
UDH3130 6,046 1,366 3,948 65.3 -38.3 254.2 254.2
UDH3131 6,046 1,365 3,949 64.3 -12.9 290.1 290.1
UDH3132 6,046 1,366 3,949 70.0 -14.6 295.0 295.0
UDH3133A 6,046 1,366 3,950 70.0 -9.0 314.6 314.6
UDH3134 6,046 1,366 3,950 64.9 -8.0 320.3 320.3
UDH3135 6,014 1,373 3,944 62.1 -23.3 283.0 283.0
UDH3136 6,014 1,373 3,944 69.4 -23.9 280.4 280.4
UDH3137 6,014 1,372 3,944 57.9 -25.4 278.7 278.7
UDH3138 6,014 1,373 3,943 66.6 -27.8 257.8 257.8
UDH3139 6,014 1,373 3,943 67.1 -32.9 277.2 277.2
UDH3140 6,014 1,373 3,943 61.5 -37.4 257.5 257.5
UDH3141 6,014 1,373 3,943 64.2 -41.9 251.5 251.5
UDH3142 6,014 1,373 3,944 64.7 -19.9 284.6 284.6
UDH3143 6,014 1,373 3,944 69.0 -15.0 299.6 299.6
UDH3145 5,992 1,395 3,940 65.1 -29.6 269.7 269.7
UDH3146 5,991 1,395 3,940 73.0 -30.6 270.0 270.0
UDH3148 5,991 1,395 3,940 68.3 -36.0 257.0 257.0
UDH3148A 5,991 1,395 3,940 74.0 -31.1 240.0 54.3
UDH3149 5,991 1,395 3,940 77.2 -35.1 270.0 270.0
UDH3149A 5,991 1,395 3,940 72.0 -40.0 275.8 275.8
UDH3150 5,992 1,395 3,939 61.0 -39.8 257.7 257.7
UDH3151 5,991 1,395 3,939 68.0 -43.0 257.8 257.8
UDH3153 5,992 1,394 3,939 62.0 -47.0 254.7 254.7
UDH3154 5,991 1,395 3,939 74.0 -48.0 260.5 260.5
UDH3156 5,991 1,395 3,940 68.0 -23.5 279.0 279.0
UDH3163 6,801 1,442 4,169 123.1 -59.0 391.5 391.5
UDH3179 6,400 1,396 4,054 92.7 -47.9 224.4 224.4
UDH3182 6,395 1,395 4,055 80.0 -41.0 203.9 203.9
UDH3183 6,401 1,396 4,054 80.0 -48.0 149.4 149.4
UDH3203 6,803 1,443 4,169 123.0 -51.0 366.1 366.1
UDH3228 6,014 1,373 3,943 63.0 -29.0 278.4 278.4

 

Posted December 3, 2019

Share this news article

MORE or "UNCATEGORIZED"


STLLR Gold’s Tower Gold Project Infill Drilling Continues to Confirm Mineralization at the Jonpol Deposit

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces ... READ MORE

March 28, 2024

Hudbay Provides Annual Reserve and Resource Update and Production Outlook

Consolidated copper production is expected to average 153,000i to... READ MORE

March 28, 2024

Aya Gold & Silver: Record 2023 Production, Revenue and Operating Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

March 28, 2024

GOLD ROYALTY REPORTS 2023 FINANCIAL AND OPERATING RESULTS AND FORECASTS APPROXIMATE 100% GROWTH IN REVENUE IN 2024 DRIVEN BY CORNERSTONE ROYALTIES ENTERING PRODUCTION

Gold Royalty Corp. (NYSE American: GROY) is pleased to announce t... READ MORE

March 28, 2024

Eloro Resources Announces Closing of Previously Announced Non-Brokered Prospectus Exempt Offering Pursuant to the Listed Issuer Exemption

Eloro Resources Ltd. (TSX: ELO) (OTCQX: ELRRF) (FSE: P2QM) is ple... READ MORE

March 28, 2024

Copyright 2024 The Prospector News