The Prospector News

Jeff Christian – “Commodities After Russia: Long-term Outlooks for Gold, Silver, Nickel, and the PGMs” (Video)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Jeff Christian – “Commodities After Russia: Long-term Outlooks for Gold, Silver, Nickel, and the PGMs” (Video)

 

 

 

 

 

CPM Group Expects Higher Long-Term Prices for Gold, Silver, Nickel, and the PGMs long after the end of the Russian Ukrainian Conflict.

 

In this live Q&A with Group Ten Metals, Jeffrey Christian discusses some of the reasons to get excited for the long-term growth of Gold, Silver, PGMS, and Nickel.

 

He also discusses the importance of properly sourcing materials, whether the US Russia relationship will recover after the war, how the Fed fights inflation, and Bitcoin.

 

Courtesy of The CPM Group

Posted March 14, 2022

Share this news article

MORE or "UNCATEGORIZED"


RPX GOLD FURTHER EXTENDS ZONE OF HIGH-GRADE MINERALIZATION WITHIN THE PEA OPEN PIT, Intersects 25.50 g/t gold over 4.26 metres, including 135.00 g/t gold over 0.71 metres

RPX Gold Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased to announce ... READ MORE

October 7, 2026

Bullion Gold Intersects 1.73 g/t Au Over 13.4 Metres Including 3.80 g/t Au Over 4.4 Metres in DDH TG-04 at Terragold

Bullion Gold Discoveries Corp. (TSX-V: BGD) is pleased to announc... READ MORE

October 7, 2026

SAGA Metals Drills 495.6 m at 37.86% Fe2O3, 5.51% TiO2, 0.273% V2O5 Including 68.2 m at 52.95% Fe2O3, 8.57% TiO2, 0.381% V2O5 at Radar Critical Minerals Project in Labrador

SAGA Metals Corp. (TSX-V: SAGA) (OTCQX SAGMF) (FSE: 20H) a North ... READ MORE

October 7, 2026

Revival Gold Intersects 8.4 g/t Gold over 6.2 Meters and 8.5 g/t Gold over 3.4 Meters Supporting Overall Continuity of Mineralization at the Beartrack-Arnett Joss Target

Revival Gold Inc. (TSX-V: RVG) (OTCQX: RVLGF) is pleased to repor... READ MORE

October 7, 2026

Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li₂O and 101.6 Metres at 1.02% Li₂O

Highlights: CS26-096: two separate intervals, including: 134.5 m ... READ MORE

October 7, 2026

Copyright 2026 The Prospector News