The Prospector News

Jaguar Mining Announces Full Repayment of USD$7.85 Million Secured Bridge Facility

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Jaguar Mining Announces Full Repayment of USD$7.85 Million Secured Bridge Facility

 

 

 

 

 

Jaguar Mining Inc. (TSX: JAG) is pleased to announce that it has fully repaid its senior secured bridge facility with Auramet International LLC for USD$7.85 million from the proceeds of Jaguar’s recently completed USD$25 million private placement and general working capital. As a result, the Company’s pledge of the shares of its wholly‐owned subsidiary, Mineracao Serras Do Oeste Eireli (MSOL), as security for the Facility has been discharged.

 

The net proceeds from the Facility, which was initially announced in Jaguar’s news release dated March 15, 2019, were used to fund working capital requirements, underground development at Turmalina and for general corporate purposes.

 

About Jaguar Mining Inc.

 

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration potential from mineral claims covering an area of approximately 64,000 hectares. The Company’s principal operating assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012 and the Roça Grande Mine which has been on care and maintenance since April 2018.

 

Posted July 15, 2019

Share this news article

MORE or "UNCATEGORIZED"


Alamos Gold Announces Friendly Acquisition of Argonaut Gold

Unlocking Value Through the Creation of One of Canada’s Lar... READ MORE

March 27, 2024

Foremost Lithium Reports Widest Intercept to Date; 32.53 Metres of Spodumene-Bearing Pegmatite at its Zoro Lithium Project in Manitoba, Canada

Highlights Include: Drill hole FL 24-009 intersected 32.53 metres... READ MORE

March 27, 2024

WESTERN COPPER AND GOLD ANNOUNCES METALLURGICAL PROGRAM AND ASSOCIATED DRILL RESULTS

Western Copper and Gold Corporation (TSX: WRN) (NYSE American: WR... READ MORE

March 27, 2024

Endeavour Reports Strong FY-2023 Results

ENDEAVOUR REPORTS STRONG FY-2023 RESULTS Production of 1.1Moz at AISC of... READ MORE

March 27, 2024

Orezone Reports 2023 Year-end and Q4 Results, and Provides 2024 Guidance

Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF) reported its o... READ MORE

March 27, 2024

Copyright 2024 The Prospector News