The Prospector News

Interview: The KE Report – Dryden Gold Corp. (Video)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Interview: The KE Report – Dryden Gold Corp. (Video)

 

In this KE Report, Shad Marquitz interviews Trey Wasser, CEO of Dryden Gold Corp. to discuss some of the 2024 milestones and upcoming work plans for 2025 with respect to exploration initiatives at the Gold Rock Camp, and ongoing work programs at some of the Company’s highly prospective regional target areas, namely Sherridon and Hyndman.

Investors who are in Vancouver for the Metals Investor Forum or AME Roundup conferences, can expect to meet with management in person at the available dates and times below:

Metals Investor Forum
Fairmont Pacific Rim Hotel
January 17-18
9am-6pm Pacific Time
Agenda | Register for free here

Note: President, Maura Kolb, P. Geo., will be presenting at 9am on Friday, January 17th.

AME Roundup
Vancouver Convention Centre East
Core Shack #821
January 20-21
9am-4pm Pacific Time
Schedule | Register here

Posted January 20, 2025

Share this news article

MORE or "UNCATEGORIZED"


Scorpio Gold Announces Closing of Public Offering for Gross Proceeds of $10,800,000

Scorpio Gold Corporation (TSX-V: SGN) (OTCQB: SRCRF) (FSE: RY9) i... READ MORE

July 23, 2026

Altamira Gold Expands Mineralized Porphyry System at Maria Bonita Gold Deposit, Cajueiro District, Brazil

Altamira Gold Corp. (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF), is ... READ MORE

July 23, 2026

Element 29 Extends Mineralization in ELID035 with Longest Intercept of 1,534.6 m Grading 0.58% CuEq2 at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

Including 1,071.1 m grading 0.61% CuEq2, beyond the limits of the... READ MORE

July 23, 2026

Osisko Gold Reports Final Results from its Lowhee Zone Infill Program at the Cariboo Gold Project

HIGHLIGHTS Completion of the infill drill program in the Lowhee Z... READ MORE

July 23, 2026

Troilus Drills 1.10 g/t AuEq Over 103 m as Z87 Optimization Program Continues to Strengthen Mine Planning

*1.10 G/T AUEQ (0.98 G/T AU, 0.54 G/T AG, 0.07 % CU) OVER 103 M &... READ MORE

July 23, 2026

Copyright 2026 The Prospector News