The Prospector News

Hudbay Announces Positive Preliminary Economic Assessment for its Mason Copper Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Hudbay Announces Positive Preliminary Economic Assessment for its Mason Copper Project

 

 

 

 

 

  • 27-year mine life with average annual copper production of approximately 140,000 tonnes over the first ten years of full production.
  • Mason has the potential to more than double Hudbay’s current copper production levels, and if brought into production, Mason is expected to become the third largest copper mine in the United States.
  • After-tax net present value (10%) of $519 million and 13.7% internal rate of return at $3.10 per pound copper, which increases to $773 million and 15.4%, respectively, at $3.25 per pound copper.
  • Mine plan assumes the construction of a 120,000 tonnes per day conventional flotation concentrator and an initial capital cost estimate of approximately $2.1 billion.
  • The mine plan includes 1.1 billion tonnes at 0.34% copper-equivalenti, 98% of which is from the measured and indicated categories.
  • Mason’s 2.2 billion tonne measured and indicated resource estimate is one of the largest greenfield copper projects in the Americas.
  • Opportunities to further enhance project economics through exploration for higher-grade satellite deposits on Hudbay’s prospective land package in Nevada.
  • Mason is a viable long-term option for potential future development and a strong component of Hudbay’s pipeline of long-term growth opportunities in mining friendly jurisdictions.

 

Hudbay Minerals Inc. (TSX:HBM) (NYSE: HBM)  announced the results of its preliminary economic assessment of its 100%-owned Mason copper project located in Nevada, United States. All dollar amounts are in US dollars, unless otherwise noted.

 

“The Mason PEA demonstrates the success of Hudbay’s consistent growth strategy and our team’s ability to create value from accretive acquisitions of high-quality copper projects in mining-friendly jurisdictions,” said Peter Kukielski, Hudbay’s President and Chief Executive Officer. “We added Mason to our development pipeline portfolio in 2018 and have since leveraged our integrated core competencies of exploration, mine planning and project development to demonstrate that Mason is a quality long-term development project in our robust organic growth pipeline.”

 

Hudbay’s Mason Development Strategy

 

The Mason project is a large greenfield copper deposit located in the historic Yerington District of Nevada and is one of the largest undeveloped copper porphyry deposits in North America. Mason’s measured and indicated mineral resource estimates are approximately twice the size of Hudbay’s Constancia and Rosemont deposits. Hudbay views the Mason project as a long-term option for future development and a strong component of its pipeline of long-term growth opportunities in mining friendly jurisdictions. Please refer to Figure 1 for a map showing the location of the Mason project.

 

In 2017, Hudbay made a $2 million toe-hold equity investment in Mason Resources Corp., the entity that owned the Mason project at that time. In October 2018, Hudbay entered into an agreement to acquire the remaining 86% of the issued and outstanding common shares of Mason Resources Corp. that it didn’t already own for approximately $15 million. The acquisition of Mason was completed by way of a plan of arrangement in December 2018. Since acquiring Mason, Hudbay has consolidated a prospective package of patented and unpatented mining claims contiguous to the Mason project in two private transactions in 2019 and 2020, including a property called Mason Valley, as shown in Figure 2. In March 2021, Hudbay announced an updated measured and indicated resource estimate of 2.2 billion tonnes at 0.29% copper at Mason, based on a revised resource model and an updated mine plan constructed by Hudbay personnel using the same methods applied at Constancia. The company has also advanced a number of technical studies to support the completion of its 2021 PEA.

 

Mason 2021 PEA Summary

 

The 2021 Mason PEA contemplates a 27-year mine life with average annual copper production of approximately 140,000 tonnes over the first ten years of full production. At a copper price of $3.10 per pound, the after-tax net present value using a 10% discount rate is $519 million and the internal rate of return is 13.7%. The valuation metrics are highly sensitive to the copper price and at a price of $3.25 per pound, the after-tax net present value using a 10% discount rate increases to $773 million and the internal rate of return increases to 15.4%.

 

A summary of key valuation, production and cost details from the 2021 PEA can be found below. For further details, including metrics provided on an annual basis, please refer to the section titled “Detailed Cash Flow Model” at the end of this news release.

 

 

Summary of Key Metrics (at $3.10/lb Cu) Unit Value
Valuation Metrics (Unlevered)1    
Net present value @ 8% (after-tax) $ millions $945
Net present value @ 10% (after-tax) $ millions $519
Internal rate of return (after-tax) % 13.7%
Payback period # years 9.0
EBITDA (annual LOM avg.) $ millions $339
Project Metrics    
Initial capital2 $ millions $2,079
Operating Metrics    
Copper production (annual avg. over first 10 full years) 000 tonnes 138.7
Copper production (annual LOM avg.) 000 tonnes 112.3
Copper recovery % 90.0%
Sustaining capital (annual LOM avg.) $ millions $21
Cash cost3 (LOM avg.) $/lb Cu $1.61
Sustaining cash cost3 (LOM avg.) $/lb Cu $1.76
Mining unit cost(LOM avg.) $/t moved $1.20
Milling unit cost (LOM avg.) $/t milled $4.85
G&A unit cost (LOM avg.) $/t milled $1.15
Combined unit cost(LOM avg.) $/t milled $8.66

 

Note: “LOM” refers to life-of-mine total.

1 Calculated assuming the following commodity prices: copper price of $3.10 per pound, gold price of $1,500 per ounce, silver price of $18.00 per ounce and molybdenum price of $10.00 per pound.
2 Initial capital assumes a 20% contingency.
3 Cash cost and sustaining cash cost, net of by-product credits, per pound of copper produced. By-product credits calculated using the following commodity prices: gold price of $1,500 per ounce, silver price of $18.00 per ounce and molybdenum price of $10.00 per pound. Sustaining cash cost includes sustaining capital expenditures and royalties. Cash cost and sustaining cash cost are non-IFRS financial performance measures with no standardized definition under IFRS. For further details on why Hudbay believes cash costs are a useful performance indicator, please refer to the company’s most recent Management’s Discussion and Analysis for the three and twelve months ended December 31, 2020.
4 Before the impact of capitalized stripping.
5 Combined mine, mill and general and administrative costs per tonne of ore milled, after the impact of capitalized stripping.

 

 

Cu Price Sensitivity Unit $3.00/lb $3.10/lb $3.25/lb $3.50/lb $3.75/lb $4.00/lb
Valuation Metrics              
Net present value1 @ 8% $ millions $739 $945 $1,253 $1,761 $2,264 $2,766
Net present value1 @ 10% $ millions $350 $519 $773 $1,191 $1,606 $2,019
Internal rate of return1 % 12.5% 13.7 % 15.4% 18.1% 20.7% 23.1%
Payback period # years 9.5 9.0 8.4 7.7 7.1 6.7
EBITDA (annual LOM avg.) $ millions $315 $339 $374 $434 $493 $553

1 Net present value and internal rate of return are shown on an after-tax basis.

 

Overview of Proposed Operation

 

The Mason deposit is a large tonnage, copper-molybdenum deposit and is planned to be a traditional open pit shovel/truck operation with a copper sulphide mineral processing plant producing commercial grade copper and molybdenum concentrate. The plant is designed to operate at a throughput rate of 120,000 tonnes per day. Please refer to Figure 3 for a map of the proposed site layout.

 

Mining operations in the pit are designed to be performed from 15 and 30-metre-high benches using large-scale mining equipment including 10 5/8-inch diameter rotary blast hole drills, 74 cubic-yard electric mining shovels, a 55 cubic-yard hydraulic shovel, a 37 cubic-yard front-end loader and 290-tonne capacity haul trucks. During the 27-year operation, the mine plan achieves peak mining rates until year 13, then reduces by about half of the original mining rate from year 14 to 20 as the strip ratio drops. The remaining seven years assumes the processing of rehandled ore from stockpiles.

 

The concentrator design consists of conventional crushing and milling, followed by rougher and cleaner froth flotation, and is a similar flowsheet to that used at Hudbay’s Constancia mine in Peru. The proposed site layout assumes the plant will be located to the northwest of the open pit, northeast of the waste rock facility and east of the tailings management facility. Haul trucks will dump ore at the primary crusher, which will feed the concentrator via overland conveyor.

 

Operating costs were developed by Hudbay based on a bottom-up approach utilizing price quotes from suppliers and local costs for labour. Mine operating costs were validated against actual costs at Constancia and other similar projects and operations.

 

Mineral Resource Estimate

 

The PEA and mine plan were based on a revised resource model which was used to publish Hudbay’s first compiled updated resource estimate for Mason. The resource model was constructed using the same methods Hudbay applied at Constancia. Based on this new model, including resource classification criteria calibrated on historical performance at Constancia, control of grade over-smoothing in the central zone of the deposit and the use of a lower cut-off grade, the measured and indicated resources increased to 2.2 billion tonnes at 0.29% copper, from 1.4 billion tonnes at 0.32% copper previously.

 

The current mineral resource estimates for Mason, based on the revised resource model as of January 1, 2021, are summarized below.

 

 

Mason Project
Mineral Resource Estimates1,2,3
Tonnes Cu Grade
(%)
Mo Grade
(g/t)
Au Grade
(g/t)
Ag Grade
(g/t)
Measured   1,417,000,000 0.29 59 0.031 0.66
Indicated   801,000,000 0.30 80 0.025 0.57
Total Measured and Indicated   2,219,000,000 0.29 67 0.029 0.63
Inferred   237,000,000 0.24 78 0.033 0.73

 

Note: totals may not add up correctly due to rounding.

1 Mineral resource estimates that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not include factors for mining recovery or dilution.
2 Metal prices of $3.10 per pound copper, $10.00 per pound molybdenum, $1,500 per ounce gold, and $18.00 per ounce silver were used to estimate mineral resources.
3 Mineral resource estimates are reported as 20 metres by 20 metres by 15 meters blocks above cut-off using a minimum NSR per tonne of $6.25.

 

Regional Upside Potential

 

There is opportunity to further enhance the project economics through exploration for higher grade satellite deposits on Hudbay’s prospective land package in Nevada, including Mason Valley. The Mason Valley property hosts several historical underground copper mines that were in production in the early 1900s. Much of the Mason Valley property is located on Hudbay’s wholly owned private lands and contains highly prospective skarn mineralization. Mason Valley presents a similar opportunity to Hudbay’s Copper World property in Arizona, where the company has recently announced the discovery of four mineral deposits in a historical mining district. Historical drilling and production records from the past producing mines at Mason Valley indicate the mineralization is high grade and starts at or near surface (please refer to Figure 4). In 2015, Metal Bank Limited optioned the Mason Valley property and conducted a limited campaign of nine reverse circulation drillholes at the Bluestone prospect with the objective to define the extent of the high-grade copper mineralization. Two notable holes intersected 42 metres of 1.51% copper and 34 metres of 0.61% copper, both starting from surface.

 

The company also owns the Blue Hill copper oxide deposit located 1.5 kilometres northwest of the Mason deposit, which was not included in the 2021 PEA and may present an opportunity to add an oxide component to the Mason project design in the future.

 

Next Steps

 

Hudbay continues to compile and interpret historical data relating to its land package near Mason. Once this is done, the company expects to complete a geophysical survey to refine the exploration targets in preparation for a potential initial drilling campaign later this year. The company will also continue to advance its local stakeholder engagement program while advancing trade-off studies to support future pre-feasibility work on the project.

 

Non-IFRS Financial Performance Measures

 

Cash cost and sustaining cash cost per pound of copper produced are shown because the company believes they help investors and management assess the performance of its operations, including the margin generated by the operations and the company. Unit operating costs are shown because these measures are used by the company as a key performance indicator to assess the performance of its mining and processing operations. These measures do not have a meaning prescribed by IFRS and are therefore unlikely to be comparable to similar measures presented by other issuers. These measures should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS and are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently. For further details on these measures, please refer to page 53 of Hudbay’s management’s discussion and analysis for the year ended December 31, 2020 available on SEDAR at www.sedar.com.

 

Qualified Person and NI 43-101

 

The scientific and technical information contained in this news release related to the Mason project has been approved by Olivier Tavchandjian, P. Geo, Hudbay’s Vice-President, Exploration and Geology. Mr. Tavchandjian is a qualified person pursuant to NI 43 101. The company expects to voluntarily file a National Instrument 43-101 technical report on Mason in the coming months.

 

This preliminary economic assessment is preliminary in nature, includes inferred resources that are considered too speculative to have the economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty the preliminary economic assessment will be realized.

 

About Hudbay

 

Hudbay is a diversified mining company primarily producing copper concentrate (containing copper, gold and silver) and zinc metal. Directly and through its subsidiaries, Hudbay owns three polymetallic mines, four ore concentrators and a zinc production facility in northern Manitoba and Saskatchewan (Canada) and Cusco (Peru), and copper projects in Arizona and Nevada (United States). The company’s growth strategy is focused on the exploration, development, operation and optimization of properties it already controls, as well as other mineral assets it may acquire that fit its strategic criteria. Hudbay’s vision is to be a responsible, top-tier operator of long-life, low-cost mines in the Americas. Hudbay’s mission is to create sustainable value through the acquisition, development and operation of high-quality, long-life deposits with exploration potential in jurisdictions that support responsible mining, and to see the regions and communities in which the company operates benefit from its presence. The company is governed by the Canada Business Corporations Act and its shares are listed under the symbol “HBM” on the Toronto Stock Exchange, New York Stock Exchange and Bolsa de Valores de Lima. Further information about Hudbay can be found on www.hudbay.com.

 

 

Detailed Cash Flow Model

 

Mason Cash Flow Model Unit LOM Y-03 Y-02 Y-01 Y01 Y02 Y03 Y04 Y05 Y06 Y07
Mining Activities                        
Ore mined 000 tonnes 1,133,427         41,929   45,929   60,172   64,130   57,167   56,756   53,605  
Waste mined 000 tonnes 1,448,540         117,871   113,781   99,828   95,870   102,833   103,244   106,395  
Rehandle 000 tonnes 301,531         200   290            
Pre-strip – Ore mined 000 tonnes 3,012       3,012                
Pre-strip – Waste mined 000 tonnes 116,988       116,988                
Mineral moved 000 tonnes 3,003,498       120,000   160,000   160,000   160,000   160,000   160,000   160,000   160,000  
Strip ratio excl. pre-strip waste/ore 1.28         2.81   2.48   1.66   1.49   1.80   1.82   1.98  
Mining rate 000 t/day 353       329   438   438   438   438   438   438   438  
Unit cost $/t moved 1.20         1.20   1.20   1.20   1.25   1.25   1.25   1.29  
Milling Activities                        
Ore milled 000 tonnes 1,136,439         36,500   43,800   43,800   43,800   43,800   43,800   43,800  
Headgrade – Cu % 0.296%         0.310%   0.381%   0.356%   0.380%   0.367%   0.369%   0.364%  
Headgrade – Mo % 0.006%         0.006%   0.008%   0.005%   0.007%   0.003%   0.002%   0.003%  
Headgrade – Au g/tonne 0.032         0.013   0.026   0.024   0.027   0.042   0.029   0.025  
Headgrade – Ag g/tonne 0.667         0.381   0.516   0.527   0.659   0.826   0.590   0.597  
Milling Rate 000 t/day 115         100   120   120   120   120   120   120  
Unit cost $/t milled 4.85         4.90   4.90   4.90   4.90   4.90   4.90   4.90  
Concentrates Produced & Sold                        
Copper concentrate 000 tonnes 10,108         339   501   468   499   482   485   479  
Contained metal – Cu 000 tonnes 3,033         102   150   140   150   145   145   144  
Contained metal – Au 000 ounces 696         9   22   20   23   36   24   21  
Contained metal – Ag 000 ounces 14,630         268   436   445   556   698   499   504  
Payable metal – Cu 000 tonnes 2,926         98   145   135   145   140   140   139  
Payable metal – Au 000 ounces 618           20   18   21   32   22   19  
Payable metal – Ag 000 ounces 12,133               501   628   449   454  
Moly concentrate 000 tonnes 64         2   3   2   3   1   1   1  
Contained metal – Mo 000 tonnes 32         1   2   1   1   1   1   1  
Payable metal – Mo 000 tonnes 31         1   2   1   1   1   1   1  
Capital Costs                        
Project capital $ millions 2,079   228   839   1,012                
Sustaining capital $ millions 541         29   34   34   34   34   29   29  
Deferred stripping $ millions 427         77   66   28   17   37   38   49  
Total $ millions 3,046   228   839   1,012   106   100   62   51   71   67   78  
Operating Costs                        
Mining $ millions 3,458         192   192   192   200   200   200   206  
Deferred stripping $ millions (427)         (77)   (66)   (28)   (17)   (37)   (38)   (49)  
Milling $ millions 5,506         179   215   215   215   215   215   215  
G&A $ millions 1,272         46   55   55   55   55   55   55  
Closure + surety bonds $ millions 153   1   1   1   1   1   1   1   1   1   1  
Total $ millions 9,963   1   1   1   340   396   435   453   433   432   427  
Cost Metrics                        
Cash cost $/lb Cu prod. 1.61         1.81   1.40   1.65   1.56   1.52   1.58   1.59  
Sustaining cash cost $/lb Cu prod. 1.76         2.30   1.72   1.86   1.73   1.76   1.81   1.85  
Combined unit cost $/t milled 8.66         9.32   9.05   9.93   10.34   9.89   9.86   9.76  
Cash Flow Summary                        
Gross revenue $ millions 21,838         697   1,059   975   1,061   1,030   1,011   998  
TC/RC $ millions (1,417)         (47)   (70)   (64)   (70)   (66)   (65)   (65)  
Freight $ millions (1,320)         (44)   (65)   (61)   (65)   (63)   (63)   (62)  
NSR royalty $ millions (76)         (2)   (4)   (3)   (4)   (4)   (4)   (3)  
Operating costs $ millions (9,963)   (1)   (1)   (1)   (340)   (396)   (435)   (453)   (433)   (432)   (427)  
Federal tax $ millions (576)             (2)   (2)   (5)   (16)   (15)  
State tax $ millions (314)             (6)   (5)   (10)   (9)   (8)  
WC changes $ millions 0   37   100   28   (139)   (16)   6   (5)   2   1   2  
Cash from operations $ millions 8,173   36   99   27   123   507   409   458   451   423   419  
Capital costs $ millions (3,046)   (228)   (839)   (1,012)   (106)   (100)   (62)   (51)   (71)   (67)   (78)  
Unlevered free cash flow $ millions 5,127   (192)   (740)   (984)   17   407   348   407   380   356   342  

 

 

 

Mason Cash Flow Model

Unit Y08 Y09 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18
Mining Activities                        
Ore mined 000 tonnes 61,926   60,606   75,486   69,209   72,697   60,446   56,742   65,268   69,051   62,323   45,688  
Waste mined 000 tonnes 98,074   99,394   84,514   90,791   87,303   99,554   94,242   44,732   6,993   746   103  
Rehandle 000 tonnes                      
Pre-strip – Ore mined 000 tonnes                      
Pre-strip – Waste mined 000 tonnes                      
Mineral moved 000 tonnes 160,000   160,000   160,000   160,000   160,000   160,000   150,983   110,000   76,043   63,069   45,791  
Strip ratio excl. pre-strip waste/ore 1.58   1.64   1.12   1.31   1.20   1.65   1.66   0.69   0.10   0.01   0.00  
Mining rate 000 t/day 438   438   438   438   438   438   414   301   208   173   125  
Unit cost $/t moved 1.29   1.29   1.29   1.31   1.32   1.30   1.37   1.41   1.43   1.44   1.39  
 

 

Milling Activities

                       
Ore milled 000 tonnes 43,800   43,800   43,800   43,800   43,800   43,800   43,800   43,800   43,800   43,800   43,800  
Headgrade – Cu % 0.336%   0.312%   0.314%   0.339%   0.357%   0.349%   0.319%   0.330%   0.329%   0.320%   0.285%  
Headgrade – Mo % 0.008%   0.003%   0.004%   0.004%   0.003%   0.006%   0.008%   0.008%   0.008%   0.009%   0.004%  
Headgrade – Au g/tonne 0.042   0.044   0.043   0.040   0.026   0.026   0.037   0.039   0.040   0.040   0.051  
Headgrade – Ag g/tonne 0.904   0.916   0.751   0.733   0.639   0.572   0.854   1.008   0.867   0.846   1.028  
Milling Rate 000 t/day 120   120   120   120   120   120   120   120   120   120   120  
Unit cost $/t milled 4.90   4.90   4.90   4.90   4.90   4.90   4.90   4.90   4.90   4.90   4.90  
 

 

Concentrates Produced & Sold

                       
Copper concentrate 000 tonnes 442   410   412   445   469   459   419   433   432   420   374  
Contained metal – Cu 000 tonnes 132   123   124   134   141   138   126   130   130   126   112  
Contained metal – Au 000 ounces 35   37   36   34   22   22   31   33   34   34   43  
Contained metal – Ag 000 ounces 764   774   634   619   540   483   721   852   733   715   869  
Payable metal – Cu 000 tonnes 128   119   119   129   136   133   121   125   125   122   108  
Payable metal – Au 000 ounces 32   33   33   30   20   20   28   30   30   31   39  
Payable metal – Ag 000 ounces 688   696   571   557   486   435   649   767   660   644   782  
Moly concentrate 000 tonnes 3   1   2   2   1   2   4   4   3   4   2  
Contained metal – Mo 000 tonnes 2   1   1   1   1   1   2   2   2   2   1  
Payable metal – Mo 000 tonnes 2   1   1   1   1   1   2   2   2   2   1  
 

 

Capital Costs

                       
Project capital $ millions                      
Sustaining capital $ millions 29   27   27   25   25   25   25   27   27   10   10  
Deferred stripping $ millions 25   28     3     29   30          
Total $ millions 54   55   27   28   25   54   55   27   27   10   10  
 

 

Operating Costs

                       
Mining $ millions 207   206   206   210   211   209   207   155   109   91   64  
Deferred stripping $ millions (25)   (28)     (3)     (29)   (30)          
Milling $ millions 215   215   215   215   215   215   215   215   215   215   215  
G&A $ millions 55   55   55   55   55   55   55   55   53   53   53  
Closure + surety bonds $ millions 1   1   1   1   1   1   1   1   1   1   1  
Total $ millions 453   448   477   478   481   450   448   426   377   359   332  
 

 

Cost Metrics

                       
Cash cost $/lb Cu prod. 1.63   1.77   1.87   1.77   1.78   1.67   1.70   1.56   1.41   1.35   1.38  
Sustaining cash cost $/lb Cu prod. 1.83   1.98   1.98   1.87   1.87   1.86   1.91   1.67   1.51   1.39   1.43  
Combined unit cost $/t milled 10.35   10.23   10.88   10.91   10.98   10.27   10.22   9.72   8.61   8.20   7.58  
 

 

Cash Flow Summary

                       
Gross revenue $ millions 971   889   892   958   982   974   921   955   949   932   832  
TC/RC $ millions (63)   (56)   (57)   (61)   (64)   (64)   (60)   (62)   (61)   (61)   (52)  
Freight $ millions (58)   (53)   (54)   (58)   (61)   (60)   (55)   (57)   (56)   (55)   (49)  
NSR royalty $ millions (3)   (3)   (3)   (3)   (3)   (3)   (3)   (3)   (3)   (3)   (3)  
Operating costs $ millions (453)   (448)   (477)   (478)   (481)   (450)   (448)   (426)   (377)   (359)   (332)  
Federal tax $ millions (14)   (21)   (24)   (23)   (29)   (31)   (31)   (27)   (34)   (41)   (43)  
State tax $ millions (7)   (11)   (13)   (12)   (15)   (16)   (17)   (15)   (18)   (21)   (21)  
WC changes $ millions 2   5   (0)   (4)   (1)   0   3   (10)   (8)   (5)   2  
Cash from operations $ millions 374   302   266   318   328   350   310   355   390   388   334  
Capital costs $ millions (54)   (55)   (27)   (28)   (25)   (54)   (55)   (27)   (27)   (10)   (10)  
Unlevered free cash flow $ millions 321   246   239   289   303   296   255   328   363   378   324  

 

 

 

Mason Cash Flow Model

Unit Y19 Y20 Y21 Y22 Y23 Y24 Y25 Y26 Y27 Y28 Y29
Mining Activities                        
Ore mined 000 tonnes 43,800   10,498                    
Waste mined 000 tonnes 2,031   241                    
Rehandle 000 tonnes   33,302   43,800   43,800   43,800   43,800   43,800   43,800   4,939      
Pre-strip – Ore mined 000 tonnes                      
Pre-strip – Waste mined 000 tonnes                      
Mineral moved 000 tonnes 45,831   44,041   43,800   43,800   43,800   43,800   43,800   43,800   4,939      
Strip ratio excl. pre-strip waste/ore 0.05   0.02                    
Mining rate 000 t/day 126   29                    
Unit cost $/t moved 1.02   0.50   0.50   0.50   0.50   0.50   0.50   0.50   0.50      
 

 

Milling Activities

                       
Ore milled 000 tonnes 43,800   43,800   43,800   43,800   43,800   43,800   43,800   43,800   4,939      
Headgrade – Cu % 0.282%   0.245%   0.217%   0.202%   0.190%   0.177%   0.161%   0.141%   0.117%      
Headgrade – Mo % 0.006%   0.007%   0.006%   0.006%   0.006%   0.006%   0.005%   0.004%   0.003%      
Headgrade – Au g/tonne 0.054   0.032   0.026   0.023   0.021   0.019   0.020   0.016   0.012      
Headgrade – Ag g/tonne 1.067   0.637   0.510   0.453   0.419   0.379   0.373   0.300   0.249      
Milling Rate 000 t/day 120   120   120   120   120   120   120   120   14      
Unit cost $/t milled 4.90   4.70   4.70   4.70   4.70   4.70   4.70   4.70   4.70      
 

 

Concentrates Produced & Sold

                       
Copper concentrate 000 tonnes 370   322   285   265   249   232   212   185   17      
Contained metal – Cu 000 tonnes 111   97   86   80   75   70   64   56   5      
Contained metal – Au 000 ounces 46   27   22   19   18   16   17   13   1      
Contained metal – Ag 000 ounces 901   538   431   383   354   321   315   253   24      
Payable metal – Cu 000 tonnes 107   93   83   77   72   67   61   54   5      
Payable metal – Au 000 ounces 41   24   20   17   16   15   15   12   1      
Payable metal – Ag 000 ounces 811   484   387   345   319   288   283   228   21      
Moly concentrate 000 tonnes 3   3   3   3   3   3   2   2   0      
Contained metal – Mo 000 tonnes 1   1   1   1   1   1   1   1   0      
Payable metal – Mo 000 tonnes 1   1   1   1   1   1   1   1   0      
 

 

Capital Costs

                       
Project capital $ millions                      
Sustaining capital $ millions 10   10   10   10   5   5   5   5        
Deferred stripping $ millions                      
Total $ millions 10   10   10   10   5   5   5   5        
 

 

Operating Costs

                       
Mining $ millions 47   22   22   22   22   22   22   22   2      
Deferred stripping $ millions                      
Milling $ millions 215   206   206   206   206   206   206   206   23      
G&A $ millions 44   44   35   35   35   35   35   35   4      
Closure + surety bonds $ millions 1   1   1   1   1   1   1   1   41   41   40  
Total $ millions 306   273   264   264   264   264   264   264   71   41   40  
 

 

Cost Metrics

                       
Cash cost $/lb Cu prod. 1.23   1.34   1.47   1.57   1.66   1.77   1.93   2.22   2.78      
Sustaining cash cost $/lb Cu prod. 1.28   1.40   1.54   1.64   1.70   1.82   1.97   2.27   2.79      
Combined unit cost $/t milled 6.99   6.23   6.02   6.02   6.02   6.02   6.02   6.02   6.22      
 

 

Cash Flow Summary

                       
Gross revenue $ millions 838   714   629   586   552   515   472   410   38      
TC/RC $ millions (53)   (46)   (41)   (38)   (36)   (34)   (31)   (27)   (2)      
Freight $ millions (48)   (42)   (37)   (35)   (33)   (30)   (28)   (24)   (2)      
NSR royalty $ millions (3)   (3)   (2)   (2)   (2)   (2)   (2)   (1)   (0)      
Operating costs $ millions (306)   (273)   (264)   (264)   (264)   (264)   (264)   (264)   (71)   (41)   (40)  
Federal tax $ millions (37)   (43)   (34)   (26)   (22)   (20)   (17)   (13)   (8)      
State tax $ millions (19)   (20)   (17)   (13)   (12)   (10)   (9)   (7)   (4)      
WC changes $ millions (5)   3   4   3   1   2   3   4   (8)   (2)    
Cash from operations $ millions 367   290   239   210   185   158   125   77   (58)   (43)   (40)  
Capital costs $ millions (10)   (10)   (10)   (10)   (5)   (5)   (5)   (5)        
Unlevered free cash flow $ millions 357   280   229   200   180   153   120   72   (58)   (43)   (40)  

 

 

Model Assumptions

 

METAL UNIT PRICE  
Copper $/lb $3.10  
Molybdenum $/lb $10.00  
Gold $/oz $1,500.00  
Silver $/oz $18.00  
       
 

 

METAL

UNIT RECOVERIES  
Copper % 90.00%  
Molybdenum % 50.00%  
Gold % 60.00%  
Silver % 60.00%  
       
 

 

METAL

UNIT CONC. GRADE  
Copper % 30.00%  
Molybdenum % 50.00%  
       
 

 

METAL

UNIT PAYABILITY  
Copper % 96.50%  
Molybdenum % 99.00%  
Gold % 90.00%  
Silver % 90.00%  
 

Note: a 0.4% net smelter return royalty is payable on minerals extracted from the Mason claims.

       
 

 

MATERIAL

TYPE UNIT CHARGE
Cu concentrate Treatment $/dmt $80.00
Payable moly Roasting $/lb $1.20
Payable copper Refining $/lb $0.08
Payable gold Refining $/oz $5.00
Payable silver Refining $/oz $0.50
       
MATERIAL TYPE UNIT VALUE
Cu concentrate Moisture % H2O 8.00%
Blended freight $/wmt $119.67
Mo concentrate Moisture % H2O 4.00%
Blended freight $/wmt $72.73

 

 

Figure 1: Mason Location Map

The Mason project is located in west-central Nevada, approximately 75 kilometres southeast of Reno and seven kilometres west of the town of Yerington. The area is known as the historic Yerington Mining District due to known historical mining activities.


https://www.globenewswire.com/NewsRoom/AttachmentNg/89db298e-d898-4b48-b2b7-1565d3fd4946

 

Figure 2: Mason Land Package

Through a combination of patented and unpatented mineral claims on public and private land, the Mason project has a total area of approximately 13,820 hectares, including the land acquired through the Mason Valley acquisition in 2019.


https://www.globenewswire.com/NewsRoom/AttachmentNg/dc4575cd-44d2-42fe-ab83-1f44007456c5

 

Figure 3: Mason Proposed Site Layout

Proposed site layout including the location of the Mason open pit mine, the processing plant, waste rock facility and tailings management facility.


https://www.globenewswire.com/NewsRoom/AttachmentNg/21526cfc-d5dd-4a51-992a-8a61373cfd48

 

Figure 4: Mason Valley Historical Mines

The Mason Valley property consists of several past-producing mines with visuals of copper mineralization in the area.


https://www.globenewswire.com/NewsRoom/AttachmentNg/81253ee0-79e4-437d-b8a2-d26212189dd1

 

________________________
i
 Copper equivalent grade calculated using the following commodity price assumptions: $3.10 per pound copper, $1,500 per ounce gold, $18.00 per ounce silver and $10.00 per pound molybdenum.

 

Posted April 6, 2021

Share this news article

MORE or "UNCATEGORIZED"


PPX Mining Announces Closing Of $1.35 Million Private Placement

PPX Mining Corp. is pleased to announce that it has closed its fu... READ MORE

April 19, 2024

Elevation Gold Reports Financial Results for Year Ended December 31, 2023, including $66.4M in Total Revenue

Elevation Gold Mining Corporation (TSX-V: ELVT) (OTCQB: EVGDF) i... READ MORE

April 18, 2024

Reunion Gold Announces the Signing of a Mineral Agreement With the Government of Guyana for Its Oko West Project

Reunion Gold Corporation (TSX-V: RGD; OTCQX: RGDFF) is pleased to announ... READ MORE

April 18, 2024

Drilling Confirms 4 km of Favourable Corridor at Lynx Gold Trend

Puma Exploration Inc. (TSX-V: PUMA) (OTCQB: PUMXF) is thrilled to... READ MORE

April 18, 2024

Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update

Grid Metals Corp. (TSX-V:GRDM) (OTCQB:MSMGF) is pleased to announ... READ MORE

April 18, 2024

Copyright 2024 The Prospector News