Golden Minerals Company (NYSE American:AUMN) (TSX: AUMN) is pleased to report payable production for the second quarter 2021 of 3,634 gold equivalent ounces consisting of 3,452 gold ounces and 12,323 silver ounces from the first full quarter of production at its Rodeo gold-silver mine located in Durango State, Mexico. Compared to the first quarter 2021, payable AuEq production increased by 2,075 ounces or 133%. Gold equivalents are calculated at the realized metals prices shown below. Average Au grade processed during the second quarter increased to 3.6 g/t Au from 3.0 g/t in the first quarter 2021.

 

Golden Minerals’ President and Chief Executive Officer, Warren Rehn, added, “We are very pleased to report the first full quarter of production data from Rodeo. We completed the planned ramp-up of production during the second quarter, and after the regrind mill was installed at the end of April, plant throughput averaged over 500 tonnes per day in May and June combined. The Company remains on track to achieve our production guidance of between 12,000-14,000 oz gold and 25,000-30,000 oz silver for full year 2021.”

 

  Rodeo Operations Statistics (in thousands,
except per unit amounts)
  Three Months
Ended June 30,
2021
Three Months
Ended March
31, 2021
Six Months
Ended June 30,
2021
         
Total tonnes mined (1)   164,954 171,905 336,859
Total tonnes in stockpiles awaiting processing (2) 9,215 5,108 9,215
Total tonnes in low grade stockpiles (3)   49,552 26,410 49,552
Tonnes processed   38,814 18,791 57,605
Tonnes per day processed   427 209 318
         
Gold grade processed (grams per tonne)   3.6 3.0 3.4
Silver grade processed (grams per tonne)   10.0 14.3 11.4
         
Plant recovery – gold (%)   78.0 84.3 80.0
Plant recovery – silver (%)   83.9 86.6 84.8
         
Payable gold produced in dore (ounces)   3,452 1,390 4,841
Payable silver produced in dore (ounces)   12,323 11,289 23,612
Payable gold equivalent produced in dore (ounces) (4) 3,634 1,559 5,186
         
Gold sold in dore (ounces)   3,064 909 3,973
Silver sold in dore (ounces)   11,225 9,698 20,923
Gold equivalent sold in dore (ounces) (4)   3,230 1,054 4,284
         
Realized price, before refining and selling costs        
    Gold (dollar per ounce)   1,843 1,721 1,815
    Silver (dollar per ounce)   27.20 25.76 26.53

 

(1) Includes all mined material transported to the plant, stockpiled or designated as waste

(2) Includes mined material stockpiled at the mine or transported to the plant awaiting processing in the plant

(3) Material grading between 2 g/t (current cut-off grade) and 1 g/t Au held for possible future processing

(4) Gold equivalents based on realized $ Au and $ Ag price

 

Production began at Rodeo in January 2021, with a second ball mill installed and operating at the end of April which enabled the Company to easily exceed its targeted processing rate of 450 tonnes per day. As production ramped up in the second quarter, the Company saw a temporary drop in gold recovery from 84% in Q1 to 78% in Q2 related primarily to higher than planned throughput, which in turn yielded slightly coarser grind and lower gold recovery. The Company believes it will be able to improve gold recovery as it targets 550 tpd throughput and optimizes the operation of the leach and extraction circuits at the plant during the third quarter. Target recovery for gold as indicated in metallurgical test results is 85%.

 

About Golden Minerals

 

Golden Minerals is a growing gold and silver producer based in Golden, Colorado. The Company is primarily focused on producing gold and silver from its Rodeo Mine and advancing its Velardeña Properties in Mexico and, through partner funded exploration, its El Quevar silver property in Argentina, as well as acquiring and advancing selected mining properties in Mexico, Nevada and Argentina.

 

Posted July 13, 2021

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Intersects 92.5 m of 11.82% Igneous Phosphate Starting at Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

April 23, 2024

Kuya Silver Provides Update on Mine Start-up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Targeting Commencement of Production at Bethania in H1 2024 ... READ MORE

April 23, 2024

Silvercorp Reports Operational Results and Financial Results Release Date for Fiscal 2024, and Issues Fiscal 2025 Production, Cash Costs, and Capital Expenditure Guidance

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reports pr... READ MORE

April 23, 2024

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m; 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m, and 1.32% Li2O over 14m

Excellent follow-up drill results from high-grade discovery holes... READ MORE

April 23, 2024

Solaris Reports First Drilling Results from 2024 Program and Exploration Update, Including 150m of 0.67% CuEq within 384m of 0.51% CuEq and 284m of 0.53% CuEq from Near Surface

Solaris Resources Inc. (TSX: SLS) (NYSE: SLSR) is pleased to repo... READ MORE

April 23, 2024

Copyright 2024 The Prospector News