Golconda Gold Ltd. (TSX-V: GG) (OTCQX: GGGOF) is pleased to announce quarterly production of 3,648 ounces of gold for the second quarter of 2026 at its Galaxy Gold Mine, consistent with gold production compared to Q1 2026 and a 20% increase on Q2 2025.

 

The Q2 production numbers are as follow:

 

Mining     Q2
2026
Q1
2026
YTD
2026
FY
2025
Q2
2025
Princeton Ore Mined (t) 14,110 17,953 32,063 59,428 12,346
Ore Grade (g/t) 3.75 3.41 3.56 3.88 4.63
Waste (t) 244 274 518 952 243
Galaxy Ore Mined (t) 26,049 26,089 52,138 76,000 19,135
Ore Grade (g/t) 2.56 2.77 2.66 3.13 3.05
Waste (t) 143 128 271 371 113
Total Ore Mined (t) 40,159 44,042 84,201 135,428 31,481
Ore Grade (g/t) 2.98 3.03 3.01 3.46 3.67
Waste (t) 387 402 789 1,323 356

 

Processing     Q2
2026
Q1
2026
YTD
2026
FY
2025
Q2
2025
Ore processed   (t) 44,811 41,180 85,991 130,637 29,429
Concentrate produced   (t) 3,602 4,372 7,974 11,289 2,480
Concentrate grade   (g/t) 31.5 25.9 28.4 35.9 38.0
Gold produced   (oz) 3,648 3,637 7,285 13,020 3,030

 

Golconda Gold CEO, Ravi Sood commented: “We are pleased to announce we have maintained gold production levels at Galaxy for Q2 while also focusing on required waste movement at Princeton. We expect ore tonnes to increase in the second half of 2026,(1) as, in late Q2, we took delivery of additional mining equipment, including one drill rig, three loaders and one dump truck, which is continuing our fleet enhancement and standardisation program. We also progressed well with infrastructure enhancements including a new engineering workshop and management and administration block.

 

We are also very pleased to announce that we have appointed High Desert Mining LLC as mining contractor at the Summit Mine in New Mexico, USA. High Desert has been on site since May 25 and underground establishment activities are underway with key mining equipment having been mobilised. First ore was delivered to surface on July 7, mining faces are readily accessible and we expect to begin to build a stockpile. Wet commissioning of the plant and first concentrate production is expected by the end of September. Restarting Summit is a major milestone for Golconda Gold and is expected to increase our production, revenue, and ultimately profitability while diversifying geographically and adding significant exposure to silver.” (1)

 

About Golconda Gold

 

Golconda Gold is an un-hedged gold producer and explorer with mining operations and exploration tenements in South Africa and New Mexico. Golconda Gold is a public company and its shares are quoted on the TSX Venture Exchange under the symbol “GG” and the OTCQX under the symbol “GGGOF”. Golconda Gold’s management team is comprised of senior mining professionals with extensive experience in managing mining and processing operations and large-scale exploration programmes. Golconda Gold is committed to operating at the highest standards, focused on the safety of its employees, respecting the environment, and contributing to the communities in which it operates.

Posted July 10, 2026

Share this news article

MORE or "UNCATEGORIZED"


Namibia Critical Metals Announces Completion of Japan's C$23 Million Earn-In and Formation of Strategic Joint Venture Company for the Lofdal Heavy Rare Earth Project

Namibia Critical Metals Inc. (TSX-V: NMI) (OTCQB: NMREF) is pleased to announce that Japan Organizat... READ MORE

July 31, 2026

Eldorado Gold Reports Solid Q2 2026 Financial and Operational Results; Skouries On Track for Q3 2026

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) today reports the Company’s financial and operati... READ MORE

July 31, 2026

DPM Metals Reports Record Q2 2026 Free Cash Flow and Earnings; Vareš On-Track to Achieve Full Production by Year-end 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) announced its operating and financial results for the second q... READ MORE

July 31, 2026

IMC Rare Earths Ltd Announces Closing of $20 Million Initial Public Offering

IMC Rare Earths Ltd, a company focused on the mineral exploration and development of magnet rare ear... READ MORE

July 31, 2026

Fairchild Gold Announces Closing of Private Placement Financing and Early Warning Report

Fairchild Gold Corp. (TSX-V: FAIR), is pleased to announce the closing, on July 29, 2026, of its pre... READ MORE

July 31, 2026

Copyright 2026 The Prospector News