The Prospector News

GoGold Reports Parral Production for Quarter Ending March 2023

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GoGold Reports Parral Production for Quarter Ending March 2023

 

 

 

 

 

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) is pleased to report production for the quarter ending March 31, 2023 of 400,145 silver equivalent ounces, consisting of 173,717 silver ounces, 2,016 gold ounces, and 143 tonnes of copper.

 

“We continue to focus on completion of the preliminary economic assessment in Los Ricos North, followed by a revised resource and updated preliminary economic assessment for Los Ricos South in June,” said Brad Langille, President and CEO. “At Parral, our operations team has delivered a safe and environmentally friendly operation, which with the current prices should yield a positive financial result.”

 

Table 1: Quarterly Production Summary

 

Quarter Ended Dec 2021 Mar 2022 Jun 2022 Sep 2022 Dec 2022 Mar 2023
Silver Production (oz) 195,678 186,655 213,495 145,944 159,838 173,717
Gold Production (oz) 2,558 2,791 3,081 2,278 2,399 2,016
Copper Production (tonnes) 123 125 98 124 222 143
Silver Equivalent Production (oz)1 444,071 455,991 509,796 400,467 441,217 400,145
1. “Silver equivalent production” include gold ounces and copper tons produced and converted to a silver equivalent based on a ratio of the average market metal price for each period.  The gold:silver ratio for each of the periods presented was:  Dec 2021 – 77, Mar 2022 – 77, June 2022 – 83, Sep 2022 – 90, Dec 2022 – 82, Mar 2023 – 84.  The copper:silver ratios were: Dec 2021 – 417, Mar 2022 – 411, June 2022 – 415, Sep 2022 – 398, Dec 2022 – 377, Mar 2023 – 399.

 

Mr. Robert Harris, P.Eng. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.

 

About GoGold Resources

 

GoGold Resources is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico.  The Company operates the Parral Tailings mine in the state of Chihuahua and has the Los Ricos South and Los Ricos North exploration projects in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects.

 

Posted April 6, 2023

Share this news article

MORE or "UNCATEGORIZED"


Relevant Gold Extends Burr Trend by 2.5 km and Samples 25.4 g/t Gold, 2,203 g/t Silver, and 12.7% Copper at Lewiston

Relevant Gold Corp. (TSX-V: RGC) (OTCQB: RGCCF) is pleased to announce high-grade gold, silver, and ... READ MORE

January 26, 2026

Allied Gold to be Acquired by Zijin Gold International in Friendly All-Cash Offer Valued at C$5.5 Billion

Allied Gold Corporation (TSX: AAUC) (NYSE: AAUC) is pleased to announce that it has entered into a d... READ MORE

January 26, 2026

Titan Mining Launches Made-in-America Graphite Production as U.S. Moves to Secure Critical Minerals

Titan Mining Corporation (TSX:TI) (NYSE-A:TII), an existing zinc concentrate producer in upstate New... READ MORE

January 26, 2026

GoldMining Drilling Intercepts Gold Mineralization at Depth, São Jorge Project Pará State, Brazil

GoldMining Inc. (TSX: GOLD) (NYSE American: GLDG) is pleased to report additional assay results from... READ MORE

January 26, 2026

Gold X2 Mining Delivers Preliminary Economic Assessment and Updated Mineral Resource Estimate for the Moss Gold Project

Gold X2 Mining Inc. (TSX-V: AUXX) (OTCQB: GSHRF) (FRA: DF8 ) is pleased to announce the resu... READ MORE

January 26, 2026

Copyright 2026 The Prospector News