The Prospector News

GoGold Intersects 9.5m at 430 g/t Silver Equivalent at Los Ricos South Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GoGold Intersects 9.5m at 430 g/t Silver Equivalent at Los Ricos South Project

 

 

 

 

 

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) is pleased to release the assay results from 11 diamond drill holes at the South Project in the Company’s Los Ricos district project, including two at San Juan and nine in the Main area.

 

Hole LRGG-20-106 was drilled on Section 775N in the San Juan area of the project and intersected the Los Ricos quartz vein from 101.1 to 122.0m.  The vein averaged 219 g/t silver equivalent or 2.92 g/t gold equivalent, made up of 118 g/t silver and 1.35 g/t gold over 21.0 metres and included 9.5 metres of 430 g/t silver equivalent, or 5.73 g/t gold equivalent.

 

“We’ve increased the pace of drilling at the Los Ricos South Project and continue to hit wide intercepts of good grade.  We’ve released the results of our first short holes along the el Abra outcrop which confirm grade starts at surface, including hole 102 which showed 10.7m of 235 g/t silver equivalent,”  said Brad Langille, President and CEO.  “At the Los Ricos North Project, we are mobilizing and completing preparatory work for our upcoming drilling campaign (as announced February 20, 2020 per PP#07-2020).”

 

Hole LRGG-20-101 was also drilled on section 775N in the San Juan area of the project and intersected 33.8 metres from 120.8 to 154.5m of 156 g/t silver equivalent or 2.08 g/t gold equivalent.  Included in the intercept was 5.0m of 617 g/t silver equivalent.

 

Detailed intersections are listed in Table 1, and the hole locations are shown in Table 2.

 

A longitudinal section summary of all the holes drilled at Los Ricos to date is available at

https://gogoldresources.com/component/rsfiles/preview?path=diagrams%252FLosRicos_LongSec_20200310.pdf

 

 

 

Table 1:  Drill Hole Intersections
 
Hole ID Area Section From To Length1 Au Ag AuEq2 AgEq2
      (m) (m) (m) (g/t) (g/t) (g/t) (g/t)
LRGG-20-101 San Juan 775N 120.8 154.5 33.8 0.54 115.9 2.08 156.0
  including   146.5 151.5 5.0 2.00 466.9 8.22 616.6
LRGG-20-102 Main 300N 0.0 10.7 10.7 1.05 156.2 3.13 234.8
LRGG-20-103 Main 250N 0.0 17.0 17.0 0.28 93.1 1.53 114.4
LRGG-20-104 Main 225N 0.0 20.0 20.0 0.44 88.3 1.61 120.9
LRGG-20-105 Main 150N 2.2 24.6 22.4 0.39 75.8 1.40 105.3
  including   15.4 21.8 6.4 0.81 134.8 2.60 195.3
LRGG-20-106 San Juan 775N 101.1 122.0 21.0 1.35 117.9 2.92 219.4
  including   101.1 110.6 9.5 2.83 217.0 5.73 429.5
LRGG-20-107 Main 125N 6.0 34.0 28.0 0.20 40.6 0.75 55.9
LRGG-20-108 Main 75N 20.9 33.8 12.9 0.79 96.9 2.08 155.8
  stope   33.8 38.0 4.2        
LRGG-20-109 Main 350N 5.2 21.0 15.8 0.69 79.5 1.75 131.4
  including   9.0 12.0 3.0 2.61 225.0 5.61 420.6
  and   27.0 29.6 2.6 0.39 92.5 1.63 122.0
LRGG-20-110 Main 375N 0.0 22.0 22.0 0.38 102.0 1.74 130.3
  including   0.0 6.0 6.0 0.62 191.6 3.17 238.0
LRGG-20-111 Main 625N 226.0 232.9 6.9 0.31 49.5 0.97 72.6
                     

 

   
1. Not true width
2. AuEq and AqEq converted using a silver to gold ratio of 75:1

 

 

 

Table 2: Drill Hole Locations
 
Hole ID Easting Northing Elevation Azimuth Dip Length
LRGG-20-101 610271 2327937 1276 50 -75 190.5
LRGG-20-102 610663 2327678 1276 50 -20 60.0
LRGG-20-103 610716 2327624 1266 50 -20 42.0
LRGG-20-104 610736 2327608 1265 50 -20 51.0
LRGG-20-105 610792 2327558 1252 50 -20 54.0
LRGG-20-106 610271 2327937 1276 50 -60 150.0
LRGG-20-107 610815 2327544 1252 50 -20 60.0
LRGG-20-108 610845 2327505 1263 50 -20 38.8
LRGG-20-109 610643 2327694 1283 50 -20 51.0
LRGG-20-110 610623 2327709 1278 50 -20 27.0
LRGG-20-111 610216 2327695 1224 50 -65 351.0
               

 

 

Los Ricos Exploration Projects

 

The Company is undertaking two drilling and exploration projects at its Los Ricos property located in Jalisco state, Mexico.  The South Project began in March 2019 and includes the ‘Main’ area, which is focused on drilling around a number of historical mines including El Abra, El Troce, San Juan, and Rascadero.  The South Project also includes the Cerro Colorado and Las Lamas targets.  The North Project was launched this month and includes the Monte del Favor, Salomon, La Trini, and Mololoa targets.   

 

Procedure, Quality Assurance / Quality Control and Data Verification

 

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test work. 

 

The sealed and tagged sample bags are transported to the ActLabs facility in Zacatecas, Mexico. ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

 

Quality assurance and quality control procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data.  All results stated in this announcement have passed GoGold’s QA/QC protocols.

 

Mr. David Duncan, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release. 

 

About GoGold Resources

 

GoGold Resources is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico.  The Company operates the Parral Tailings project in the state of Chihuahua and has the Los Ricos exploration project in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects.

 

Posted March 10, 2020

Share this news article

MORE or "UNCATEGORIZED"


K92 Mining Closes CAN$50 Million Bought Deal Financing

K92 Mining Inc. (TSX: KNT) is pleased to announce that, further t... READ MORE

July 6, 2022

NMG Issues Results of Feasibility Study for its Integrated Ore-to-Anode-Material Model Projected to be North America’s Largest Natural Graphite Operation with Attractive Economics

This news release constitutes a “designated news release” for... READ MORE

July 6, 2022

STEP OUT DRILLING AT PANUCO EXPANDS THE SAN ANTONIO VEIN ALONG STRIKE AND DOWN DIP

Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) i... READ MORE

July 6, 2022

Brixton Metals Drills 64m of 5.74 g/t Gold Including 28.95m of 10.36 g/t Gold at its Trapper Target on its Thorn Project

Brixton Metals Corporation (TSX-V: BBB) (OTCQB: BBBXF) is pleased... READ MORE

July 6, 2022

1911 Gold Intersects Gold Mineralization in First-Pass Drilling at the Apex Property, Manitoba

1911 Gold Corporation (TSX-V: AUMB) (OTCQX: AUMBF) is pleased t... READ MORE

July 6, 2022

We acknowledge the [financial] support of the Government of Canada.

Government of Canada Supported
Copyright 2022 The Prospector News