GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) is pleased to release the assay results from 9 diamond drill holes of the 2019 drilling program on the Los Ricos project including 6 holes along the northern side of the Main Mine stopes, a deep hole in the Main Stope, a hole along the south side of the stope and an exploration hole to the north of the San Juan workings.
Hole LRGG-19-088 was drilled to test for a northern strike extension of the Los Ricos vein about 65m past the north end of the historical stope on Section 600N. The hole intersected the Los Ricos quartz vein from 218.1 to 237.0m and averaged 8.63 g/t gold equivalent or 647.0 g/t silver equivalent, made up of 2.01 g/t gold and 496.4 g/t silver over 18.9 metres. A higher-grade section of the interval averaged 31.74 g/t gold equivalent or 2,380.8 g/t silver equivalent over 5.0m. No historical workings were encountered in this hole.
“The majority of our past drilling has focussed on the historical mine at Los Ricos. The high grade hole 88 opens up what we believe is a new ore shoot to the northwest which we will continue to focus additional drilling. This drilling can potentially yield additional high grade intercepts which could be a bulk minable target,” said Brad Langille, President and CEO.
Five other holes, LRGG-19-087, 089, 090, and 091 all intersected the Los Ricos vein above the historical 300 Foot Level and north of the old Stopes. None of the new holes cut any underground workings. Hole LRGG-19-083 was abandoned in the Hanging Wall andesitic tuffs at a depth of 183m, well above the Los Ricos vein.
Hole LRGG-19-085 was drilled on Section 450N to test the Main Stope on the 750 Foot Level of the historical workings. The hole entered a 12.0m wide backfilled stope at 342.0m and then intersected 16.8m of the Los Ricos quartz vein from 354.0 to 370.8m averaging 1.51 g/t gold equivalent or 113.1 g/t silver equivalent.
Hole LRGG-19-084 was drilled on Section 200N and intersected the Los Ricos quartz vein averaging 0.68 g/t gold equivalent over 7.5 from 218.0 to 225.5m. Hole LRGG-19-086 was an exploration hole testing the Rascadero quartz vein from 194.6 to 209.9m. The vein was weakly mineralized over the entire intersection.
Detailed intersections are listed in Table 1, and the hole locations are shown in Table 2.
A longitudinal section summary of all the holes drilled at Los Ricos to date is available at https://gogoldresources.com/component/rsfiles/preview?path=diagrams%252FLosRicos_LongSec_20200122.pdf
Table 1: Drill Hole Intersections
Hole ID | Area | Section | From | To | Length1 | Au | Ag | AuEq2 | AgEq2 |
(m) | (m) | (m) | (g/t) | (g/t) | (g/t) | (g/t) | |||
LRGG-19-083 | Main | 500N | Abandoned in Hanging Wall above Los Ricos Vein | ||||||
LRGG-19-084 | Main | 200N | 218.0 | 225.5 | 7.5 | 0.29 | 29.3 | 0.68 | 51.1 |
LRGG-19-085 | Stope | 450N | 342.0 | 354.0 | 12.0 | Historical working – backfilled stope | |||
Main | 354.0 | 370.8 | 16.8 | 0.36 | 86.1 | 1.51 | 113.1 | ||
LRGG-19-086 | El Troce | 1000N | 194.6 | 209.9 | 15.3 | 0.06 | 12.1 | 0.22 | 16.6 |
Including | 195.2 | 196.5 | 1.3 | 0.27 | 44.4 | 0.86 | 64.8 | ||
LRGG-19-087 | Main | 550N | 219.4 | 236.4 | 17.1 | 0.21 | 60.0 | 1.01 | 76.0 |
including | 220.5 | 225.0 | 4.5 | 0.60 | 103.8 | 1.99 | 148.9 | ||
LRGG-19-088 | Main | 600N | 218.1 | 237.0 | 18.9 | 2.01 | 496.4 | 8.63 | 647.0 |
including | 227.3 | 232.3 | 5.0 | 7.30 | 1833.4 | 31.74 | 2,380.8 | ||
LRGG-19-089 | Main | 550N | 168.4 | 191.0 | 22.7 | 0.63 | 64.9 | 1.49 | 112.0 |
including | 171.2 | 177.9 | 6.7 | 1.76 | 113.8 | 3.28 | 245.7 | ||
LRGG-19-090 | Main | 650N | 194.4 | 207.3 | 12.9 | 0.57 | 96.5 | 1.86 | 139.4 |
including | 195.4 | 202.0 | 6.5 | 1.08 | 174.9 | 3.41 | 256.0 | ||
LRGG-19-091 | Main | 600N | 185.9 | 199.8 | 13.9 | 0.62 | 80.1 | 1.69 | 126.8 |
including | 185.9 | 191.7 | 5.8 | 1.34 | 141.2 | 3.23 | 242.1 | ||
1. | Not true width | ||||||||
2. | AuEq and AqEq converted using a silver to gold ratio of 75:1 |
Table 2: Drill Hole Locations
Hole ID | Easting | Northing | Elevation | Azimuth | Dip | Length |
LRGG-19-083 | 610371 | 2327662 | 1440.0 | 50.0 | -65.0 | 183.00 |
LRGG-19-084 | 610587 | 2327454 | 1220.5 | 50.0 | -65.0 | 280.40 |
LRGG-19-085 | 610323 | 2327556 | 1229.0 | 50.0 | -65.0 | 402.00 |
LRGG-19-086 | 610076 | 2328075 | 1303.9 | 50.0 | -65.0 | 275.60 |
LRGG-19-087 | 610346 | 2327704 | 1250.1 | 50.0 | -65.0 | 283.50 |
LRGG-19-088 | 610296 | 2327729 | 1421.0 | 50.0 | -65.0 | 260.60 |
LRGG-19-089 | 610377 | 2327735 | 1262.8 | 50.0 | -65.0 | 240.00 |
LRGG-19-090 | 610273 | 2327775 | 1427.0 | 50.0 | -65.0 | 254.40 |
LRGG-19-091 | 610326 | 2327754 | 1434.0 | 50.0 | -65.0 | 231.00 |
In 2019, GoGold completed 112 diamond drill holes totaling 17,373.3m of HQ size diamond drill core since starting the Los Ricos drilling program in March 2019. The majority of the holes (92) and metres were drilled at the Main Mine. Twenty short holes were drilled on the Cerro Colorado deposit. The drilling program continues in 2020 and will continue to test the strike and depth extensions of the Main Mine and other targets on the property.
The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test work.
The sealed and tagged sample bags are transported to the ActLabs facility in Zacatecas, Mexico. ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).
Quality Assurance / Quality Control and Data Verification
Quality assurance and quality control procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed GoGold’s QA/QC protocols.
Mr. David Duncan, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.
About GoGold Resources
GoGold Resources is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings project in the state of Chihuahua and has the Los Ricos exploration project in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects.
Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE
Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE
Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE
Significant copper and molybdenum intersections include: HM19: 11... READ MORE
Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE