The Prospector News

GCM Mining Files National Instrument 43-101 Technical Report for Its Toroparu Project in Guyana

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GCM Mining Files National Instrument 43-101 Technical Report for Its Toroparu Project in Guyana

 

 

 

 

GCM Mining Corp. (TSX: GCM) (OTCQX: TPRFF) announced today that it has filed a technical report and preliminary economic assessment  pursuant to National Instrument 43‐101 – Standards of Disclosure for Mineral Projects  for its Toroparu Gold Project located in the Upper Puruni River Region of Western Guyana. The Technical Report dated January 11, 2022, with an effective date of December 1, 2021, supports the disclosure made by the Company in its December 1, 2021 news release and was prepared by Nordmin Engineering Ltd. The Technical Report is based on the updated Mineral Resource estimate for the Toroparu Gold Project with an effective date of November 1, 2021.

 

About GCM Mining Corp.

 

GCM Mining Corp. is a mid-tier gold producer with a proven track record of mine building and operating in Latin America. In Colombia, the Company is currently the largest underground gold and silver producer with several mines in operation at its high-grade Segovia Operations. In Guyana, the Company is advancing the Toroparu Project, one of the largest undeveloped gold/copper projects in the Americas. The Company also owns an approximately 44% equity interest in Aris Gold Corporation (TSX: ARIS) (Colombia – Marmato), an approximately 27% equity interest in Denarius Silver Corp. (TSX-V: DSLV) (Spain – Lomero-Poyatos; Colombia – Guia Antigua and Zancudo) and an approximately 26% equity interest in Western Atlas Resources Inc. (TSX-V: WA) (Nunavut – Meadowbank).

 

Posted January 17, 2022

Share this news article

MORE or "UNCATEGORIZED"


Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 Kilometres West of Eureka; Follow-Up Drill Program Underway

Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 ... READ MORE

February 4, 2026

Silver One Announces Closing Of Final Tranche Of $32 Million Financing

Silver One Resources Inc. (TSX-V: SVE) (OTCQX: SLVRF) (FSE: BRK1)... READ MORE

February 4, 2026

SAGA Metals Achieves 100% Drilling Success in 2025—Reports Final Assays from Trapper South at Radar Critical Minerals Project in Labrador

Exceptional grades of Titanium, Vanadium and Iron in all 15 drill... READ MORE

February 4, 2026

Near Surface Intersection Yields 6.58 g/t gold over 10.35 metres

Intersection is within 33 metres from surface and contained in a ... READ MORE

February 4, 2026

Alamos Gold Provides Three-Year Operating Guidance Outlining 46% Production Growth by 2028 at Significantly Lower Costs

Further production growth to one million ounces annually expected... READ MORE

February 4, 2026

Copyright 2026 The Prospector News