The Prospector News

GCM Mining Files National Instrument 43-101 Technical Report for Its Segovia Operations

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GCM Mining Files National Instrument 43-101 Technical Report for Its Segovia Operations

 

 

 

 

GCM Mining Corp. (TSX: GCM) (OTCQX: TPRFF) announced that it has filed an updated Prefeasibility Study technical report for its Segovia Operations pursuant to National Instrument 43101 – Standards of Disclosure for Mineral Projects. The Technical Report, which supports the disclosure made by the Company in its March 24, 2022 news release and its 2021 Annual MD&A dated March 31, 2022, was prepared by SRK Consulting (U.S.), Inc. and is based on the updated Mineral Reserve and Mineral Resource estimates for the Segovia Operations with an effective date of December 31, 2021.

 

About GCM Mining Corp.

 

GCM Mining is a mid-tier gold producer with a proven track record of mine building and operating in Latin America. In Colombia, the Company is a leading high-grade underground gold and silver producer with several mines in operation at its Segovia Operations. Segovia produced 206,389 ounces of gold in 2021. In Guyana, the Company is advancing its fully funded Toroparu Project, one of the largest undeveloped gold/copper projects in the Americas, which is expected to commence production of more than 200,000 ounces of gold annually in 2024. GCM Mining pays a monthly dividend to its shareholders and has equity interests in Aris Gold Corporation (~44%; TSX: ARIS; Colombia – Marmato, Soto Norte; Canada – Juby), Denarius Metals Corp. (~29%; TSX-V: DSLV; Spain – Lomero-Poyatos and Colombia – Guia Antigua, Zancudo) and Western Atlas Resources Inc. (~26%; TSX-V: WA: Nunavut – Meadowbank).

 

Posted May 10, 2022

Share this news article

MORE or "UNCATEGORIZED"


Mirasol Completes the Sale of the Sascha-Marcelina Projects in Argentina for US$1.5 Million Plus Royalty

Pursuit Minerals acquires the Sascha-Marcelina Projects for a tot... READ MORE

December 10, 2025

ADYTON RESOURCES RECEIVES NON-BINDING LETTER OF INTENT (LOI) FOR THE PURCHASE OF GOLD CONCENTRATE FROM ITS WAPOLU PROJECT

Adyton Resources Corporation (TSX-V: ADY) is pleased to announce ... READ MORE

December 10, 2025

Cerro de Pasco Resources Prepares for Next Phase as Technical and Permitting Work Advances at the Quiulacocha Project

Cerro de Pasco Resources Inc. (TSX-V: CDPR) (OTCMKTS: GPPRF) (BV... READ MORE

December 10, 2025

Miata Doubles Mineralized Footprint at Jons Trend with a 500m Step Out in Hole 039 and Highlights 54 m at 1.04 g/t Au in Hole 043

Miata Metals Corp. (CSE: MMET) (FSE: 8NQ) (OTCQB: MMETF) is pleas... READ MORE

December 10, 2025

Viridian Releases Initial 2025 Drill Results Confirming Shallow, Continuous Sulphide Mineralization at Kraken

Viridian Metals Inc. (CSE: VRDN) is pleased to report initial ass... READ MORE

December 10, 2025

Copyright 2025 The Prospector News