The Prospector News

Galantas Confirms First Shipment of Gold and Silver Concentrates From Underground Omagh Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Galantas Confirms First Shipment of Gold and Silver Concentrates From Underground Omagh Mine

 

 

 

 

 

Galantas Gold Corporation (TSX-V:GAL) (AIM: GAL) the gold-mine developer and explorer, is pleased to announce that delivery has been made of the first consignment of concentrate derived from underground feedstock from the Omagh Gold-Mine, Northern Ireland.

 

Destined for Glencore’s New Brunswick smelter, the shipment, of approximately 25 tonnes, is the result of processing of limited feed produced from underground development on the Kearney vein at the Galantas Omagh gold mine. Recent analytical test-work has confirmed that the processing plant is meeting quality expectations. The processing of the concentrate is achieved by froth flotation, an environmentally safe method which does not involve the use of toxic chemicals such as cyanide or mercury.

 

Mine development continues and is expected to be enhanced by the recently delivered, new underground loader, designed specifically for narrow vein production.

 

Roland Phelps, President & CEO Galantas Gold Corporation, said, “I am delighted that the first concentrate from underground development has been delivered, which will result in near-term cash flow. We continue to make solid and determined progress towards commercial production.”

 

Posted November 6, 2018

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Confirms Another High Grade Intersect of 11.85% Igneous Phosphate Across 84 Metres Starting from Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

May 14, 2024

MAG Silver Reports First Quarter Financial Results

MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) announces the Com... READ MORE

May 14, 2024

Troilus Announces Feasibility Study Results for the Gold-Copper Troilus Project: Outlines a Large Scale, 22-Year Open Pit Project in Tier-One Jurisdiction With USD$884.5 Million NPV(5%)

Troilus Gold Corp. (TSX: TLG) (OTCQX: CHXMF) reports results from... READ MORE

May 14, 2024

Alamos Gold Intersects Higher-Grade Mineralization within a New Zone Near Existing Infrastructure at Young-Davidson

Alamos Gold Inc. (TSX:AGI) (NYSE:AGI) reported new results from i... READ MORE

May 14, 2024

Titan Reports First Quarter 2024 Results; National Safety Recognition Award

Titan Mining Corporation (TSX: TI) announces the results for the... READ MORE

May 14, 2024

Copyright 2024 The Prospector News