The Prospector News

G Mining Ventures Receives Operating Licenses for Tocantinzinho

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

G Mining Ventures Receives Operating Licenses for Tocantinzinho

 

 

 

 

 

  • The receipt of the Operating Licenses marks the last remaining permitting milestone for commercial operation
  • Tocantinzinho remains on track to commercial production in H2-24

 

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to announce that it has received the Operational Licenses for GMIN’s 100%-owned Tocantinzinho Gold Project in the State of Pará, Brazil – the last remaining permitting milestone for commercial operation. The Project remains on time and budget for commercial production in the second half of 2024.

 

The Licences received from the Pará State Environmental Agency, Secretaria de Estado de Meio Ambiente e Sustentabilidade, include the Operating Licence for mining, processing plant, tailings facilities and the new airstrip. Receipt of these licenses marks the successful completion of all project construction activities and authorizes the mine to commence operations at full capacity.

 

Louis-Pierre Gignac, President & Chief Executive Officer, commented: “This final step in the regulatory approval process for TZ is a testament to Brazil’s mining-friendly business environment, its well-structured permitting process and our team’s commitment to excellence in everything we do. I am thrilled by the achievement of this major milestone and continue to be excited as I witness the steady progress being made in commissioning the plant allowing us to achieve commercial production in the very near term.”

 

Project Development Timeline

 

The Project remains on track and budget for commercial production in H2-2024.

 

Virtual Site Tour and Feasibility Study Presentation

 

Updated satellite imagery and 360 photography showing the site progress is available through the corporate presentation at: https://vrify.com/decks/14338. A 3D presentation of the Project Feasibility Study is available at: Feasibility Study 3D VRIFY Presentation. Both presentations can be accessed by visiting GMIN’s website at https://www.gminingventures.com.

 

Timetable and Next Steps

 

Upcoming key milestones include:

  • Q3-24: Oko West Project’s Preliminary Economic Assessment
  • Q4-24 Exploration results from both TZ and Oko West
  • H2-24: Commercial production at TZ

 

Qualified Person

 

Louis-Pierre Gignac, President & Chief Executive Officer of GMIN, a QP as defined in NI 43-101, has reviewed the press release on behalf of the Corporation and has approved the technical disclosure contained in this press release.

 

About G Mining Ventures Corp.

 

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Gold Project in Brazil and Oko West Project in Guyana, both mining friendly and prospective jurisdictions

 


Project Schedule (CNW Group/G Mining Ventures Corp)

 

Posted August 28, 2024

Share this news article

MORE or "UNCATEGORIZED"


Foran Closes Second Tranche of $360M Private Placement for Additional Gross Proceeds of $71M

Foran Mining Corporation (TSX: FOM) (OTCQX: FMCXF) is pleased to ... READ MORE

September 17, 2024

High Grade Drill Results: 3.55 Metres of 5.52% CuEq or 2.68% NiEq Including 2.35 Metres of 7.80% CuEq or 3.78% NiEq from Selebi North

“The poly-metallic nature of our deposits offers the opport... READ MORE

September 17, 2024

Brixton Metals Provides Initial Assay Results from its Maiden Drill Program at the Cirque Cu-Mo Porphyry Target

Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) is pleased ... READ MORE

September 17, 2024

CanAlaska Intersects 13.61% eU3O8 over 10.9 metres at Pike Zone

Ultra High-Grade Unconformity-Hosted Uranium Mineralization Is Wi... READ MORE

September 17, 2024

North Peak Intersects 2.9 g/t Au over 18.3m (60ft) and 2.0 g/t Au Over 13.7m (45ft) in Final Holes of Phase 1 at Prospect Mountain North; Second Phase of Drilling Commences

North Peak Resources Ltd. (TSX-V: NPR) announces assay results fr... READ MORE

September 17, 2024

Copyright 2024 The Prospector News