The Prospector News

G Mining Ventures Receives Operating Licenses for Tocantinzinho

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

G Mining Ventures Receives Operating Licenses for Tocantinzinho

 

 

 

 

 

  • The receipt of the Operating Licenses marks the last remaining permitting milestone for commercial operation
  • Tocantinzinho remains on track to commercial production in H2-24

 

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to announce that it has received the Operational Licenses for GMIN’s 100%-owned Tocantinzinho Gold Project in the State of Pará, Brazil – the last remaining permitting milestone for commercial operation. The Project remains on time and budget for commercial production in the second half of 2024.

 

The Licences received from the Pará State Environmental Agency, Secretaria de Estado de Meio Ambiente e Sustentabilidade, include the Operating Licence for mining, processing plant, tailings facilities and the new airstrip. Receipt of these licenses marks the successful completion of all project construction activities and authorizes the mine to commence operations at full capacity.

 

Louis-Pierre Gignac, President & Chief Executive Officer, commented: “This final step in the regulatory approval process for TZ is a testament to Brazil’s mining-friendly business environment, its well-structured permitting process and our team’s commitment to excellence in everything we do. I am thrilled by the achievement of this major milestone and continue to be excited as I witness the steady progress being made in commissioning the plant allowing us to achieve commercial production in the very near term.”

 

Project Development Timeline

 

The Project remains on track and budget for commercial production in H2-2024.

 

Virtual Site Tour and Feasibility Study Presentation

 

Updated satellite imagery and 360 photography showing the site progress is available through the corporate presentation at: https://vrify.com/decks/14338. A 3D presentation of the Project Feasibility Study is available at: Feasibility Study 3D VRIFY Presentation. Both presentations can be accessed by visiting GMIN’s website at https://www.gminingventures.com.

 

Timetable and Next Steps

 

Upcoming key milestones include:

  • Q3-24: Oko West Project’s Preliminary Economic Assessment
  • Q4-24 Exploration results from both TZ and Oko West
  • H2-24: Commercial production at TZ

 

Qualified Person

 

Louis-Pierre Gignac, President & Chief Executive Officer of GMIN, a QP as defined in NI 43-101, has reviewed the press release on behalf of the Corporation and has approved the technical disclosure contained in this press release.

 

About G Mining Ventures Corp.

 

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Gold Project in Brazil and Oko West Project in Guyana, both mining friendly and prospective jurisdictions

 


Project Schedule (CNW Group/G Mining Ventures Corp)

 

Posted August 28, 2024

Share this news article

MORE or "UNCATEGORIZED"


LOYALIST ANNOUNCES UPDATED 2026 MINERAL RESOURCE ESTIMATE AT THE TULLY GOLD PROJECT: 1.62 MT INDICATED AT 3.16 G/T AU (164,000 OZ) AND 0.95 MT INFERRED AT 2.03 G/T AU (62,000 OZ), TIMMINS, ONTARIO

  Updated Geological Model Defines a Larger, Higher-Confidence Underground Gol... READ MORE

July 8, 2026

Minaurum Extends High-Grade Quintera Vein at Depth with 5.95 m of 1,117 g/t Silver Equivalent; Europa Sur Returns 3.65 m of 888 g/t AgEq

Minaurum Silver Inc. (TSX-V: MGG) (OTCQX: MMRGF)  is pleased to... READ MORE

July 8, 2026

Canstar Resources Intersects Potential VMS Feeder Zone at Mary March - 118 m of Copper- and Zinc-Bearing Stringer and Disseminated Mineralization Within Intervals Totalling 270 m of Altered Rhyolite

The first hole of the 2026 program drilled through to a mineraliz... READ MORE

July 8, 2026

Abcourt Intersects 0.5 g/t Gold Over 153 Metres Including 10.9 g/t Gold Over 2.1 Metres in Drilling on Its Flordin Property

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

July 8, 2026

Aya Gold & Silver Reports Record Q2-2026 Silver Production

Aya Gold & Silver Inc. (TSX: AYA) (NASDAQ: AYA) is pleased t... READ MORE

July 8, 2026

Copyright 2026 The Prospector News