The Prospector News

First Phosphate Reports Initial Mineral Resource Estimate on its Bégin-Lamarche Phosphate Deposit in the Saguenay-Lac-Saint-Jean Region of Québec, Canada

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

First Phosphate Reports Initial Mineral Resource Estimate on its Bégin-Lamarche Phosphate Deposit in the Saguenay-Lac-Saint-Jean Region of Québec, Canada

 

 

 

 

 

First Phosphate Corp (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is pleased to announce the results of its initial Mineral Resource Estimate for its Bégin-Lamarche project, located 50 km north of the City of Saguenay, Quebec, Canada. The MRE, with an effective date of September 9, 2024, was carried out by M. Antoine Yassa, P.Geo., of P&E Mining Consultants Inc., who is an Independent Qualified Person within the meaning of Canadian Securities Administrators’ National Instrument 43-101: Standards of Disclosure for Mineral Projects. MRE Highlights include:

 

  • Inferred pit-constrained Mineral Resource: 214.0 Mt @ 6.01% P2O5 (phosphate)
    Indicated pit-constrained Mineral Resource: 41.5 Mt @ 6.49% P2O5
  • Including Mountain Zone: Indicated Mineral Resource of 9.3 Mt @ 8.19% P2O5
          • Inferred Mineral Resource of 6.8 Mt @ 8.57% P2O5
  • Metallurgical Testwork indicates an anticipated apatite concentrate grade of 40% P2O5 at a 91% recovery.
  • The Bégin-Lamarche Deposit presents the potential for recovering two additional primary mineral products: a magnetite concentrate (iron) and an ilmenite concentrate (titanium).
  • Apatite (Phosphorus), titanium and high purity iron are all listed on the Quebec and Canadian critical minerals lists.
  • The Bégin-Lamarche Deposit contains very low levels of potentially deleterious elements.
  • The Deposit is open at depth.

 

“We have demonstrated that the Company benefits from a substantial strategic phosphate deposit located at only 70 km from the deep-sea port of Saguenay and Canadian Air Forces NATO Base Bagotville,” said First Phosphate CEO, John Passalacqua. “Our goal will be to bring this Mineral Resource into Preliminary Economic Assessment later this year to then be able to evaluate the commencement of a Feasibility Study.”

 

The Bégin-Lamarche Phosphate Deposit contains a significant phosphate Mineral Resource that is associated with well-defined oxide-apatite peridotite (OAP) intrusions within the large Lac-Saint-Jean anorthosite suite (LSJAS). The LSJAS is the largest anorthosite phosphate mineralized anorthosite worldwide. The phosphate deposit is comprised of three mineralized zones within the deposit. The three zones are continuous, only separated by faults within the deposit and extend to a length of 2,500 m (Figure 1). The Mountain Zone is a single phosphate-bearing mass having a diameter of up to 200 m and a length of 250 m. Drilling at the Mountain Zone intersected massive apatite (phosphate-bearing mineral) veins of up to 2 m. The Northern zone is comprised of two phosphate layers ranging from 100 to 200 m in thickness and a length of 600 m. The Southern Zone bears four phosphate layers, one of them having up to 200 m in thickness and extending to 1,700 m.

 

Figure 1 – The Bégin-Lamarche Deposit Pit-Shell

 

The above diagram can be viewed as a 3D deposit model by visiting https://www.firstphosphate.com/BeginLamarche3D

 

The Bégin-Lamarche Deposit mineralized wireframes boundaries were determined from lithology, structure, and grade boundary interpretation from visual inspection of drillhole cross-sections.

Three mineralized wireframes were developed and referred to as Mountain, Northern and Southern Zones. The mineralized wireframes were constructed on 50 m spaced vertical cross-sections for the Mountain and Northern Zones and 100 m spacing for the Southern Zone, with computer screen digitizing polylines on drillhole cross-sections in GEMS™. The mineralized wireframe outlines were influenced by the selection of mineralized material above 2.5% P2O5 that demonstrated a lithological and structural zonal continuity along strike and down dip. In some cases, mineralization <2.5% P2O5 was included for the purpose of maintaining mineralized zone continuity. The minimum constrained width for mineralized wireframe interpretation was 3 m of drill core length.

 

The Bégin-Lamarche Mineral Resource Estimate is based on 120 drill holes totalling 29,762 m. The database contained 7,968 assays for percentage of P2O5, Fe2O3 and TiO2.The Mineral Resource Estimate is presented in Table 1.

 

 

 Table1
Pit-Constrained Mineral Resource Estimate(1-4) at 2.5% P2O5 Cut-Off
Classification Zone Tonnes (Mt) P2O5 (%) P2O5 (kt)
Indicated Mountain 9.3 8.19 758
Northern 32.2 6.00 1,934
 
Total 41.5 6.49 2,692
 
Inferred Mountain 6.8 8.57 584
Northern 44.3 6.98 3,090
Southern 162.9 5.63 9,177
 
Total 214.0 6.01 12,851

 

Note: P2O5 = phosphorus pentoxide.

  1. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
  2. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
  3. The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.
  4. The Mineral Resources in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions (2014) and Best Practices Guidelines (2019) prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.

 

The Bégin-Lamarche Mineral Resource Estimate was derived from applying a 2.5% P2O5 cut-off value to the pit-constrained block model and reporting the resulting tonnes and grades for potentially mineable areas. The following parameters were used to calculate the Cut-off value that determines the open pit potentially economic portions of the constrained mineralization (Table 2).

 

The P2O5 cut-off value is calculated with parameters below:

  • US$:C$ Exchange Rate:
$0.75
  • P2O5 Price (32%):
US$180/t (approximate two-year trailing average)
  • P2O5 Price (40%):
US$225/t
  • P2O5 Process Recovery:
91%
  • Processing Cost:
C$14.00/t
  • G&A:
C$3.00/t
  • Mining Cost:
C$2.75/t (mineralized material and waste)
  • Pit Slopes:
45°

 

Accordingly, the P2O5 cut-off of potential open pit mining is calculated to be = 2.5%.

 

The optimized pit-constrained Mineral Resource Estimate is moderately sensitive to the selection of reporting P2O5 cut-off values, as demonstrated in Table 2.

 

 

Table 2
Pit-Constrained Mineral Resource Estimate Sensitivity to P2O5 Cut-off
Class Cut-off Tonnage P2O5 P2O5
P2O5 % (Mt) (%) (kt)
Indicated 5.0 27.2 7.86 2,143
4.5 30.5 7.53 2,298
4.0 33.8 7.22 2,436
3.5 36.7 6.94 2,547
3.0 39.3 6.69 2,632
2.5 41.5 6.49 2,692
2.0 43.3 6.31 2,732
1.5 44.8 6.16 2,759
1.0 46.0 6.03 2,774
Inferred 5.0 135.8 7.16 9,732
4.5 157.2 6.84 10,748
4.0 178.1 6.53 11,639
3.5 194.2 6.31 12,242
3.0 206.1 6.13 12,633
2.5 214.0 6.01 12,851
2.0 218.7 5.92 12,959
1.5 222.5 5.85 13,025
1.0 225.6 5.79 13,064
Mt: million tonnes kt: thousand tonnes

 

 

Metallurgical Testwork has been successfully conducted by SGS at their Quebec City facility with additional support by SGS Lakefield Ontario. Recent test results have confirmed that an apatite concentrate can be obtained assaying 40% P2O5 and at 91% recovery. Additional metallurgical test results indicate that the Bégin-Lamarche Deposit may have the potential to produce two additional, potentially marketable concentrates – an iron oxide (magnetite) concentrate and a titanium oxide (ilmenite) concentrate. Tests are continuing on this aspect.

 

First Phosphate’s Bégin-Lamarche Deposit is located approximately 50 km driving-distance north of the City of Saguenay, Québec’s sixth largest city, which hosts daily flights to Montréal, a skilled industrial workforce, strong local infrastructure, and which is 30 km driving distance from the deep-sea Port of Saguenay.

 

The geological and drilling work was planned, carried out and supervised by Laurentia Exploration Inc. Drill core was described at Lamarche near the deposit and at Laurentia Exploration’s offices. The drill core was sawn and sampled at Laurentia Exploration’s offices in Jonquière.

 

Qualified Persons

 

The scientific and technical disclosure for First Phosphate included in this News Release have been reviewed and approved by Gilles Laverdière, P.Geo. Mr. Laverdière is Chief Geologist of the Company and a Qualified Person under National Instrument 43-101 Standards of Disclosure of Mineral Projects.

 

The Qualified Person independent of the issuer, responsible for estimating the Mineral Resources of the Begin-Lamarche Property, within the meaning of NI 43-101, is Mr. Antoine Yassa, P.Geo., of the firm P&E Mining Consultants Inc. Mr. Yassa has read this press release and confirms that the scientific and technical information in this press release for accuracy and compliance with NI 43-101.

 

An NI 43-101 compliant Technical Report will be filed on SEDAR+ within forty-five (45) days of this press release.

 

P&E Mining Consultants Inc., an associate group of twenty (20) geological and mine engineering professionals established in 2004, provides geological and mine engineering consulting reports, Mineral Resource and Mineral Reserve Estimates, NI 43-101 Technical Reports, Preliminary Economic Assessments, Pre-Feasibility and Feasibility Studies.

 

Laurentia Exploration inc. is a firm of consulting geologists based in Jonquière, Saguenay Lac-St-Jean. It has 80 employees, mainly geology professionals who are members in good standing of a professional order. The firm was founded in 2017 and carries out projects throughout Quebec and Ontario.

 

About First Phosphate Corp

 

First Phosphate is a mineral development company fully dedicated to extracting and purifying phosphate for the production of cathode active material for the lithium iron phosphate (“LFP”) battery industry. First Phosphate is committed to producing at high purity level, in responsible manner and with low anticipated carbon footprint. First Phosphate plans to vertically integrate from mine source directly into the supply chains of major North American LFP battery producers that require battery grade LFP cathode active material emanating from a consistent and secure supply source. First Phosphate holds over 1,500 sq. km of royalty-free district-scale land claims in the Saguenay-Lac-St-Jean Region of Quebec, Canada that it is actively developing. First Phosphate properties consist of rare anorthosite igneous phosphate rock that generally yields high purity phosphate material devoid of high concentrations of harmful elements.

 

Posted September 18, 2024

Share this news article

MORE or "UNCATEGORIZED"


Kobo Resources Intersects 7.0 Metres at 4.83 g/t Au in Strong Initial Results at the Jagger Zone from Resumed 2024 Diamond Drilling Program at its Kossou Gold Project

Jagger Zone continues to show strong potential for high-grade gol... READ MORE

October 3, 2024

Scorpio Gold Announces Close of Oversubscribed $2.5 Million Private Placement

Scorpio Gold Corporation (TSXV: SGN) (OTCQB: SRCRF) (FSE: RY9) is... READ MORE

October 3, 2024

Class 1 Nickel Updates Resource Estimate on High-Grade Dundonald South Nickel Sulphide Deposit – Significant Increase Over 2020 Resource Estimate

Class 1 Nickel and Technologies Ltd. (CSE: NICO) (OTCQB: NICLF) i... READ MORE

October 3, 2024

Goliath Closes Final Tranche Of Non-Brokered Private Placement For Aggregate Proceeds Of $16,120,500 Including Several Strategic Cornerstone Purchasers Acquiring Shares

Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF)... READ MORE

October 3, 2024

Gladiator Assays 10.8m at 4.31% CuEq Within 45m at 1.76% CuEq and Drills 8m @ 3.72% CuEq Within 109.77m @ 1.05% CuEq at Cowley Park

Highlights Gladiator has completed a further 32 diamond drill hol... READ MORE

October 3, 2024

Copyright 2024 The Prospector News