The Prospector News

FIRST ENERGY DRILLS 1.03 PERCENT LITHIUM OXIDE OVER 5 METERS AT AUGUSTUS LITHIUM PROPERTY

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

FIRST ENERGY DRILLS 1.03 PERCENT LITHIUM OXIDE OVER 5 METERS AT AUGUSTUS LITHIUM PROPERTY

 

 

 

 

 

First Energy Metals Ltd. (CSE: FE) is pleased to announce results of Phase 2 exploration program drill holes LC21-33 to 37 at its Augustus Lithium Property in Quebec, Canada. The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 percent lithium oxide at 146 metres, including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m. This drill hole also has a lower seven meters wide zone with 0.54% Li2O at 165m drilled depth and several other smaller intercepts with variable lithium grades (see Table 2 for details).

 

Highlights

  • Drill hole LC 21-33 intersected two zones; a 13.20-meter-wide zone with 0.08% Li2O at 2.7 m, and a 59.2- meters- wide zone with 0.07% Li2O at 34.8 m drilled depth.
  • Drill hole LC 21-34 intersected two zones; a 11.73-meter-wide zone with 0.09% Li2O at 1.7 m, and a 75.3- meters- wide zone with 0.08% Li2O at 67.63 m drilled depth including a one-meter section of 1.49% Li2O at 81 m.
  • The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 % Li2O at 146 m, including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m. There is another seven meters wide zone with 0.54% Li2O at 165 m drilled depth including 2.06% Li2O over one meter at 169 m. This drill hole also intercepted several smaller intercepts with variable grades as shown in Table 2.
  • Drill hole LC 21-36 intersected two weakly anomalous zones; a 9.8-meter-wide zone with 0.05% Li2O at 171 m, and a 7.5- meters- wide zone with 0.04% Li2O at 198 m drilled depth.
  • Drill hole LC 21-37 intersected multiple weakly anomalous zones with widths in the range of 3 to 10 metres and 0.06-0.09% Li2O. This is the only drill hole completed at the Valor prospect.

 

Table 1: Drill Hole Details

 

Drill Hole ID Prospect Location (NAD 1983,
Zone 18N)
Azimuth
(deg)
Dip (deg) Total Drilled Depth (m)
LC21-33 Beluga / Canadian Lithium 284891E, 5368350N 257 -51 261
LC21-34 Beluga / Canadian Lithium 284891E, 5368350N 257 -81 213
LC21-35 Augustus 287205E, 5367935N 220.2 -50.39 203
LC21-36 Augustus 287120E, 5367956N 212.85 -49 234
LC21-37 Valor 283716E, 5363632N 236.21 42.3 175.14

 

All intercepts reported are based on drilled widths and have not been converted to the true width. The results of remaining drill holes from Phase 2 drill program are pending.

 

To date a total of 41 drill holes with a cumulative core drilling of over 7,500 m has been completed on the Property. The drill core is being logged and sampled at the core shack using a rock saw. For quality control and quality assurance, field duplicates, standards and blanks are being inserted at industry standard intervals.

 

The samples were bagged and tagged using best practices and were delivered to Activation Laboratories, Ancaster, Ontario for sample preparation and analyses using laboratories code Ultratrace 7 and sodium peroxide fusion (Na2O2) as summarized below. ACTLABS is an independent commercial, accredited ISO Certified Laboratory.

 

Afzaal Pirzada, P.Geo., Geological Consultant of the Company, and a “Qualified Person” for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained in this news release.

 

 

Table 2: Drill Hole LC21-35 Sample assays highlights

 

Depth From
(m)
Depth To
(m)
Width
(m)
Lithium
(ppm)
Li2O
%
104.9 106 1.10 20 0.00
106 107 1.00 55 0.01
107 107.65 0.65 58 0.01
109 110.3 1.30 2240 0.48
110.3 110.8 0.50 3050 0.66
111.62 112.5 0.88 3400 0.73
118.75 119.25 0.50 2230 0.48
123.4 124.4 1.00 86 0.02
139.65 140.5 0.85 4110 0.88
140.5 141 0.50 624 0.13
141 142 1.00 4260 0.92
145.5 146 0.50 92 0.02
Main Lithium Intercept
146 147 1.00 4760 1.02
147 148 1.00 6660 1.43
148 149 1.00 2660 0.57
149 150 1.00 4500 0.97
150 151 1.00 5280 1.14
151 152 1.00 1790 0.38
Including 5.0 m @1.03%Li2O @146 m
152 153 1.00 4300 0.92
153 154 1.00 2510 0.54
154 155 1.00 3240 0.70
155 156 1.00 5950 1.28
156 157.2 1.20 4720 1.01
Including 3.2 m @1.0% Li2O at 154 m
146 157.2 11.20 4215 0.91
157.2 157.7 0.50 575 0.12
163.35 164 0.65 2170 0.47
164 165 1.00 172 0.04
Second Lithium Intercept
165 166 1.00 546 0.12
166 167 1.00 951 0.20
167 168 1.00 1100 0.24
168 169 1.00 3300 0.71
169 170 1.00 9600 2.06
170 171 1.00 1420 0.31
171 172 1.00 614 0.13
165 172 7.00 2504 0.54
172 173.45 1.45 148 0.03
173 173.45 0.45 47 0.01

 

Note: A standard conversion factor of 2.15 was used to report Li to Li2O values

 

All intersections reported are based on drilled width and have not been converted to the true width.

 

Posted October 17, 2022

Share this news article

MORE or "UNCATEGORIZED"


Evergold Announces Closing of $1,242,000 Private Placement to Support First-Ever Drilling of High Potential DEM Porphyry Copper-Gold-Silver Prospect, BC

Evergold Corp. (TSX-V: EVER) (WKN: A2PTHZ) is pleased to announc... READ MORE

September 30, 2023

Lavras Gold closes upsized private placement

Lavras Gold Corp. (TSX-V: LGC) (OTCQB: LGCFF) has raised gross pr... READ MORE

September 30, 2023

First Phosphate Receives Letter of Interest in the Amount of up to US$170 Million from the Export-Import Bank of the United States (EXIM)

First Phosphate Corp. (CSE: PHOS) (OTC Pink: FRSPF) (FSE: KD0) is... READ MORE

September 30, 2023

New Pacific Metals Closes C$35 Million Bought Deal Financing

New Pacific Metals Corp. (TSX: NUAG) (NYSE American: NEWP) announ... READ MORE

September 30, 2023

Laramide intercepts broad-based uranium mineralization in initial holes from 2023 Australian exploration program

Laramide Resources Ltd. (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF) is p... READ MORE

September 30, 2023

Copyright 2023 The Prospector News