The Prospector News

Fireweed Intersects 14 m True Width of 11.45% Zinc, 5.86% Lead, and 126.3 g/t Silver at the New Tom South Zone

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Fireweed Intersects 14 m True Width of 11.45% Zinc, 5.86% Lead, and 126.3 g/t Silver at the New Tom South Zone

 

 

 

 

FIREWEED METALS CORP. (TSX-V: FWZ) (OTCQB: FWEDF) (FSE: M0G) is pleased to report the final results from the 2023 drilling campaign at its Tom and Jason deposits, Macmillan Pass Project, Yukon, Canada.

 

Highlights

  • Hole TS23-009 intersected 17.95 m (est. 14 m true width) of 11.45% zinc, 5.86% lead and 126.3 g/t silver, including 6.6 m of 19.33% zinc, 8.42% lead, and 225.1 g/t silver.
  • Hole TS23-009D2 intersected 18.78 m (est. 9.8 m true width) of 9.82% zinc, 11.65% lead, and 180.1 g/t silver, including 11.75 m of 11.93% zinc, 16.17% lead, and 260.5 g/t silver.
  • Both TS23-009 and TS23-009D2 intersected the new Tom South zone which was not in the 2018 mineral resource. There is substantial potential in this zone beyond what was intersected this year.
  • Drill results are now fully disclosed for the 2023 drilling campaign at Macpass.

 

CEO Statement

 

Brandon Macdonald, CEO, stated, “The intersection of continuous high-grade feeder style mineralization at Tom South is arguably one of the most significant discoveries at this deposit in decades and is a >100-metre step-out beyond the known Tom resource. These intercepts provide a tantalizing glimpse that Tom Southeast and Tom West may form a continuous zone of stratiform and massive sulphide mineralization connected around a fold hinge at Tom South. We are excited at the prospect of exploring this concept in 2024 and are reminded that despite generations of work, the Tom and Jason deposits may still have surprises in store for us.”

 

Summary

 

The mineralization from drill holes in this release primarily comprise stratiform (layer-parallel) and massive (>50% sulphides) sulphides in Tom West, Tom South and Jason South. At Tom West and Tom South this mineralization forms a continuous steeply dipping domain with sharp margins, occurring from surface to at least a depth of 750 m and across a strike length of 1,500 m. At Jason South, mineralization occurs as a series of steeply dipping stratiform lenses from 250 m below surface to a depth of at least 730 m and a strike length of 450 m. The intersections in holes TS23-009, TS23-009D1, and TS23-009D2 represent a significant 100 m step out from mineralization included in the current Tom resource and comprise high-grade massive sulphides associated with feeder style mineralization.

 

Results

 

The drill holes in this release are located at Tom West, Tom South, and Jason South and targeted stratiform and massive sulphides with a focus on step outs from the current mineral resource that was last updated in 2018. Holes TS23-009, TS23-009D1, and TS23-009D2 stepped out from an isolated intersection in historical hole TS90-012 which was not included in the 2018 resource. All three holes intersected high-grade stratiform and massive sulphides, which support the idea there is a continuous domain of mineralization outside of the 2018 resource that remains open along strike. Holes TS23-001 to TS23-008 intersected stratiform zinc mineralization, successfully stepping-out downdip and northwest from the known mineral resource at Tom West.

 

Table 1: Assay highlights for 2023 holes at Tom and Jason.

 

Drillhole Interval From
(m)
To (m) Interval
Width
(m)
Est. True
Width
(m)
Zinc
(%)
Lead
(%)
Silver
(g/t)
Bulk
Density
(t/m3)
TS23-003 Primary 250.80 280.50 29.7 22 3.59 0.31 1.5 2.84
TS23-003 Including 261.75 271.00 9.25 6.9 6.24 0.54 1.8 2.94
TS23-009 Primary* 719.00 736.95 17.95 14 11.45 5.86 126.3 3.04
TS23-009 Including* 723.60 730.20 6.6 5.1 19.33 8.42 225.1 3.23
TS23-009D1 Primary 715.74 736.44 20.7 20 4.83 3.32 52.4 2.87
TS23-009D1 Including 728.61 736.44 7.83 7.7 10.63 7.08 112.2 3.08
TS23-009D1 >Including 729.61 736.44 6.83 6.7 11.70 7.89 123.7 3.12
TS23-009D2 Primary 794.20 812.98 18.78 9.8 9.82 11.65 180.1 3.39
TS23-009D2 Including 796.45 811.57 15.12 7.9 10.95 13.53 211.3 3.51
TS23-009D2 >Including 799.82 811.57 11.75 6.1 11.93 16.17 260.5 3.66
JS23-001D1 Primary 595.98 621.55 25.57 Unknown 3.75 2.50 30.7 3.13
JS23-001D1 Including 595.98 612.95 16.97 Unknown 4.18 2.98 39.3 3.16

* Denotes intervals with recovery of less than 85%.
See “Data Verification” for a description of true width calculations

 

At the Tom deposit, mineralization is contained within tabular zones, that dip outwards around the margins of a doubly-plunging, kilometre-scale anticline fold. The deposit is subdivided into several zones, Tom West (or Tom Main zone), Tom East, and Tom Southeast. Tom North was drilled and re-discovered in 2019, interpreted as a northern extension of Tom West that is not included in the current mineral resource (see Fireweed news release dated August 20, 2019). New drilling at Tom South indicates it is a southern extension of Tom West on the nose of an anticline fold. 2023 drilling tested Tom South with hole TS23-009 and two directional-splay holes TS23-009D1 and TS23-009D2. Mineralization at Tom is subdivided into geological domains, based on mineralogy and texture: massive sulphide, and pink facies, grey facies, and black facies based on the colour of the sphalerite (zinc) mineralization. Examples of the high-grade massive to laminated sulphides encountered at Tom South, and the black-facies and grey-facies mineralization within hole from Tom West can be seen in Photos 1 to 3. Assays have now been received for all 2023 Tom and Jason holes (Tables 1 and 3). Summaries for new drill results reported in this news release are as follows:

  • Hole TS23-009 intersected 17.95 m (14 m est. true width) of massive and stratiform sulphide grading 11.45% zinc, 5.86% lead, and 126.3 g/t silver, including 6.60 m grading 19.33% zinc, 8.42% lead, and 225.1 g/t silver. Recovery in this mineralized intercept was 64%—below the recovery threshold of 85% typically deemed acceptable at the project, and as a result a secondary hole was drilled as TS23-009D1.
  • Hole TS23-009D2 intersected 18.78 m (est. true width 9.8 m) of massive and stratiform sulphide grading 9.82% zinc. 11.65% lead and 180.1 g/t silver, including 11.75 m grading 11.93% zinc, 16.17% lead, and 260.5 g/t silver.
  • Hole TS23-009D1 intersected 20.70 m (est. true width of 20 m) of massive and stratiform sulphide grading 4.83% zinc, 3.32% lead, and 52.4 g/t silver, including 7.83 m grading 10.63% zinc, 7.08% lead, and 112.2 g/t silver.
  • Hole JS23-001D1 intersected 25.57 m grading 3.75% zinc. 2.50% lead, and 30.7 g/t silver, including 16.97 m grading 4.18% zinc, 2.98% lead, and 39.3 g/t silver.
  • Hole TS23-007 intersected 31.58 m (est. true width 19 m) of stratiform sulphide grading 4.49% zinc and 0.53% lead.
  • Hole TS23-006 intersected 24.47 m (est. true width 21 m) of stratiform sulphide grading 4.16% zinc, 2.00% lead and 6.2 g/t silver.
  • Hole TS23-003 intersected 29.7 m (est. true width 22 m) of stratiform mineralization grading 3.59% zinc and 0.31% lead, including 9.25 m grading 6.24% zinc and 0.54% lead.
  • Hole TS23-008 intersected 22.10 m (est. true width 19 m) of stratiform mineralization grading 2.86% zinc and 0.12% lead.
  • Hole TS23-005 intersected 17.12 m (est. true width 16 m) of stratiform mineralization grading 3.72% zinc.
  • Hole TS23-004 intersected 11.76 m (est. true width 8.7 m) of stratiform mineralization grading 3.33% zinc, 0.32% lead and 1.5 g/t silver.
  • Hole JS23-001 intersected 2.02 m of stratiform mineralization grading 8.69% zinc and 3.6 g/t silver.
  • Hole TS23-002 intersected 3.06 m grading 6.34% zinc, 0.98% lead, and 8.5 g/t silver.
  • Hole TS23-001 intersected 0.6 m grading 3.8% zinc.

 

See Tables 1, 3, 4, and 5, Cross Sections TA–TA’, TB–TB’, TC–TC’, TD–TD’, TE–TE’, TF–TF’, JA–JA’, Long Section TG–TG’, and Maps 2, 3, 4, and 5 below for further details.

 

2023 Prospecting Program

 

Fireweed conducted a short prospecting program at Macpass in 2023, focusing around geochemical and geophysical anomalies that could be related to reduced intrusion related gold systems. Prospecting crews took 535 rock samples, with gold grades between 1 and 3,121 parts-per-billion (ppb) gold. Results over 100 ppb gold (12 samples) are presented in Table 2. Evidence of arsenic-bismuth bearing ~NW-SE trending and NE dipping veins with generally low and spotty gold values was located within hornfels rock at the newly defined Neptune showing, interpreted as distal alteration around a Mid-Cretaceous buried reduced intrusion. The depth to the hypothesized intrusion cannot be accurately estimated with the current observations and more work is required to accurately assess the potential at Neptune.

 

Fireweed intends to continue prospecting in the upcoming 2024 field season, with an emphasis on following up anomalies in a commodity agnostic manner, using a data-driven approach. Fireweed owns almost 1,000 square kilometres of mineral tenure within the Selwyn basin, one of the world’s most significant basins for zinc mineralization, where Fireweed sees great potential for additional zinc discoveries. Fireweed’s ground is also within the Mayo-Tombstone-Tungsten belt of intrusive rocks that on Fireweed’s claims, host the world’s largest high-grade tungsten deposit**, Mactung, and off Fireweed’s claims, also includes the past-producing Cantung tungsten mine, and emerging gold discoveries.

 

Table 2: Rock samples over 100 ppb gold from the 2023 prospecting program

 

Sample Au (ppb) Ag (ppm) As (ppm) Bi (ppm) Te (ppm)
4303342 3173 4.65 79107 259.5 0.5
4303156 1174.6 2.97 89178 73.3 N/A
4303283 737.5 9.1 >100000 88.6 0.3
4303438 725 5.5 >100000 58.5 1.0
4303437 620 9.37 >100000 30.5 2.0
4303231 338.3 1.225 20870 10.5 12.0
4303420 276.5 6.4 26559 0.3 0.5
C0042653 251.5 4.35 1375 7.7 0.5
4303344 232 1.4 97909 17 0.5
4303202 165 17.47 241 0.9 N/A
4303345 131.5 1.2 59373 21.4 1.3
4303311 109.5 2.63 308 1.2 0.5

About Fireweed Metals Corp.

 

Fireweed Metals is a public mineral exploration company on the leading edge of Critical Minerals project development. Fireweed is well-funded, with a healthy balance sheet, and has three projects located in Canada:

 

  • Macpass Project (Zinc-Lead-Silver): Fireweed owns 100% of the district-scale 940 km2 Macmillan Pass Project in Yukon, Canada, which is host to one of Earth’s largest undeveloped resources of zinc**, a Critical Mineral. The Tom and Jason zinc-lead-silver deposits have current Mineral Resources1 (11.21 Mt Indicated Resource at 6.59% zinc, 2.48% lead, and 21.33 g/t silver; and 39.47 Mt Inferred Resource at 5.84% zinc, 3.14% lead, and 38.15 g/t silver) and a Preliminary Economic Assessment2 (PEA). In addition, Boundary Zone, Tom North, Tom South, and End Zone have significant zinc-lead-silver mineralization drilled but not yet classified as mineral resources. The Project also includes large blocks of adjacent claims with known showings and significant upside exploration potential.
  • Mactung Project (Tungsten): The Company owns 100% interest in the 37.6 km2 Mactung Project located adjacent to the Macpass Project. Recently announced Mineral Resources for Mactung (41.5 Mt Indicated Resource at 0.73% WO3 and 12.2 Mt Inferred Resource at 0.59% WO3)3 make it the world’s largest high-grade resource of the Critical Mineral tungsten**. Located in Canada, it is one of the rare large tungsten resources outside of China**.
  • Gayna Project (Zinc-Lead-Gallium-Germanium): Fireweed owns 100% of the 128.75 km2 Gayna Project located 180 km north of the Macpass Project. It is host to extensive mineralization including Critical Minerals zinc, gallium and germanium as well as lead and silver, outlined by 28,000 m of historical drilling. A recent reevaluation of the geology supported by recent ground gravity geophysics results, soil surveys, and high grade rock samples, indicate drill targets with potential for high-grade Kipushi-style massive sulphide mineralization.

 

Qualified Person Statement

 

Technical information in this news release has been approved by Fireweed’s Senior Geologist, Ian Carr, P.Geo. (BC), a ‘Qualified Person’ as defined under Canadian National Instrument 43-101.

 

Map 1: Macpass Project and Mactung Project locations

 

 

Map 2: Location of 2023 Tom drillholes and cross sections. See below for sections

 

 

Map 3: Location of 2023 Jason drillholes and cross sections. See below for sections

 

 

Map 4: Mineralized intervals in 2023 drilling and pre-2023 drilling defining a stratiform laminated to massive sulphide zones beyond the extents of the 2018 Tom resource projected to surface (purple polygons)

 

 

Map 5: Mineralized intervals in 2023 drilling and pre-2023 drilling defining a stratiform laminated to massive sulphide zones beyond the extents of the 2018 Jason resource projected to surface (purple polygon)

 

 

Cross Section TA–TA’ — Including analytical results for holes TS23-001 and TS23-002

 

 

Cross Section TB–TB’ — Including analytical results for holes TS23-003, TS23-006, and TS23-007

 

 

Cross Section TC–TC’ — Including analytical results for hole TS23-004

 

 

Cross Section TD–TD’ — Including analytical results from Holes TS23-005

 

 

 

Cross Section TE–TE’ — Including analytical results from Hole TS23-008

 

 

Cross Section TF–TF’ — Including analytical results from Holes TS23-009, TS23-009D1, and TS23-009D2

 

 

Cross Section JA–JA’ — Including analytical results from Hole JS23-001D1

 

 

Cross Section JB–JB’ — Including analytical results from Hole JS23-001

 

 

 

Long Section TG–TG’ — showing resource extents and modelled limits of mineralization

 

 

 

Photo 1: High resolution core scanning image of stratiform and massive to semi-massive sulphide mineralization in TS23-009 (722.4 m to 734.3 m)

 

 

 

Photo 2: High resolution core scanning image stratiform and massive to semi-massive sulphide mineralization in TS23-009D1 (728.3m to 736.8 m)

 

 

 

Photo 3: High resolution core scanning image of barite-sphalerite-galena stratiform mineralization in black, grey and pink facies from TS23-007 (170.9 m to 180.6 m)

 

Table 3: TS23-003, TS23-004, TS23-005, TS23-006, TS23-007, TS23-008, TS23-009, TS23-009D1, TS23-009D2, JS23-001, and JS23-001D1 drill results

 

Drillhole Interval From
(m)
To (m) Interval
Width
(m)
Est. True
Width (m)
Zinc
(%)
Lead
(%)
Silver
(g/t)
Bulk
Density
(t/m3)
JS23-001D1 Primary 595.98 621.55 25.57 N/A 3.75 2.50 30.7 3.13
JS23-001D1 Including 595.98 612.95 16.97 N/A 4.18 2.98 39.3 3.16
TS23-003 Primary 250.80 280.50 29.70 22 3.59 0.31 1.5 2.84
TS23-003 Including 261.75 271.00 9.25 6.9 6.24 0.54 1.8 2.94
TS23-004 Primary 305.74 317.50 11.76 8.7 3.33 0.32 1.5 2.84
TS23-005 Primary 311.90 329.02 17.12 16 3.72 0.07 1.6 2.81
TS23-006 Primary 102.00 126.47 24.47 21 4.16 2.00 6.2 3.11
TS23-007 Primary 161.20 192.78 31.58 19 4.49 0.53 0.9 3.21
TS23-008 Primary 343.00 365.10 22.10 19 2.86 0.12 1.6 2.78
TS23-009 Primary* 719.00 736.95 17.95 14 11.45 5.86 126.3 3.04
TS23-009 Including* 721.30 736.95 15.65 12 12.33 6.37 143.6 3.05
TS23-009 >Including* 723.60 730.20 6.60 5.1 19.33 8.42 225.1 3.23
TS23-009D1 Primary 715.74 736.44 20.70 20 4.83 3.32 52.4 2.87
TS23-009D1 Including 728.61 736.44 7.83 7.7 10.63 7.08 112.2 3.08
TS23-009D1 >Including 729.61 736.44 6.83 6.7 11.70 7.89 123.7 3.12
TS23-009D2 Primary 794.20 812.98 18.78 9.8 9.82 11.65 180.1 3.39
TS23-009D2 Including 796.45 811.57 15.12 7.9 10.95 13.53 211.3 3.51
TS23-009D2 >Including 799.82 811.57 11.75 6.2 11.93 16.17 260.5 3.66

* Denotes intervals with recovery of less than 85%.

‡ See “Data Verification” for a description of true width calculations

 

Table 4: 2023 Drilling Summary

 

Drillhole Length (m) Zone Significant Intersection Type
NB23-001 460 Boundary Results disclosed Jul 26 2023 Step Out
NB23-002 351 Boundary Results disclosed Jul 26 2023 Step Out
NB23-003 418 Boundary Results disclosed Jul 26 2023 Step Out
NB23-004 432 Boundary Results disclosed Aug 22 2023 Step Out
NB23-005 234 Boundary Results disclosed Aug 22 2023 Step Out
NB23-006 373 Boundary Results disclosed Aug 22 2023 Step Out
NB23-007 461 Boundary Results disclosed Aug 22 2023 Step Out
NB23-008 385 Boundary Results disclosed Aug 22 2023 Step Out
NB23-009 67 Boundary Hole abandoned and redrilled as NB23-011 Step Out
NB23-010 96 Boundary Results disclosed Oct 24 2023 Step Out
NB23-011 289 Boundary Results disclosed Oct 24 2023 Step Out
NB23-012 452 Boundary Results disclosed Oct 24 2023 Step Out
NB23-013 551 Boundary Results disclosed Oct 24 2023 Step Out
NB23-014 223 Boundary Results disclosed Oct 24 2023 Step Out
NB23-015 339 Boundary Results disclosed Oct 24 2023 Step Out
NB23-016 460 Boundary Results disclosed Oct 24 2023 Step Out
NB23-017 96 Boundary Results disclosed Nov 30 2023 Step Out
NB23-018 195 Boundary Results disclosed Nov 30 2023 Step Out
NB23-019 560 Boundary Results disclosed Nov 30 2023 Step Out
NB23-020 414 Boundary Results disclosed Nov 30 2023 Step Out
NB23-021 442 Boundary Results disclosed Nov 30 2023 Infill
NB23-022 386 Boundary Results disclosed Jan 9 2024 Step Out
NB23-022D1 448 Boundary Results disclosed Jan 9 2024 Step Out
NB23-023 181 Boundary Results disclosed Nov 30 2023 Step Out
NB23-024 402 Boundary Results disclosed Nov 30 2023 Infill
NB23-025 580 Boundary Results disclosed Nov 30 2023 Step Out
NB23-026 111 Boundary Results disclosed Nov 30 2023 Step Out
NB23-027 396 Boundary Results disclosed Nov 30 2023 Infill
NB23-028 477 Boundary Results disclosed Jan 9 2024 Step Out
NB23-029 640 Boundary Results disclosed Jan 9 2024 Step Out
NB23-029D1 689 Boundary Results disclosed Jan 9 2024 Step Out
NB23-030 526 Boundary Results disclosed Nov 30 2023 Step Out
NB23-031 574 Boundary Results disclosed Jan 9 2024 Step Out
NB23-032 495 Boundary Results disclosed Jan 9 2024 Step Out
NB23-033 681 Boundary Results disclosed Jan 22 2024 Step Out
NB23-034 580 Boundary Results disclosed Jan 22 2024 Step Out
NB23-035 552 Boundary Results disclosed Jan 22 2024 Step Out
NB23-036 397 Boundary Results disclosed Jan 22 2024 Step Out
NB23-037 544 Boundary Results disclosed Jan 22 2024 Step Out
NB23-038 427 Boundary Results disclosed Jan 22 2024 Step Out
TS23-001 143 Tom North Results disclosed in this release Step Out
TS23-002 182 Tom North Results disclosed in this release Step Out
TS23-003 299 Tom West Results disclosed in this release Step Out
TS23-004 369 Tom West Results disclosed in this release Step Out
TS23-005 407 Tom West Results disclosed in this release Step Out
TS23-006 137 Tom West Results disclosed in this release Step Out
TS23-007 215 Tom West Results disclosed in this release Step Out
TS23-008 428 Tom West Results disclosed in this release Step Out
TS23-009 749 Tom South Results disclosed in this release Step Out
TS23-009D1 747 Tom South Results disclosed in this release Redrill
TS23-009D2 821 Tom South Results disclosed in this release Step Out
JS23-001 631 Jason South Results disclosed in this release Step Out
JS23-001D1 665 Jason South Results disclosed in this release Step Out
BX23-001 219 Boundary South No significant mineralization Exploration
BX23-002 144 Boundary South No significant mineralization Exploration
KB23-001 368 Kobuk No significant mineralization Exploration
KB23-002 284 Kobuk No significant mineralization Exploration

Table 5: Drill Hole Collar Information

 

Drillhole Zone Length
(m)
Easting Northing Elevation
(m.s.l)
Azimuth
(°)
Dip (°)
NB23-001 Boundary 460 422297 7010471 1185.86 211.99 -76.42
NB23-002 Boundary 351 422235 7010525 1194.57 214.06 -70.22
NB23-003 Boundary 418 422235 7010525 1194.57 213.40 -78.00
NB23-004 Boundary 432 422171 7010556 1203.00 213.91 -78.08
NB23-005 Boundary 234 422058 7010589 1207.95 199.63 -49.74
NB23-006 Boundary 373 422171 7010556 1203.00 215.44 -70.02
NB23-007 Boundary 461 422058 7010589 1207.95 206.37 -86.43
NB23-008 Boundary 385 422171 7010556 1203.00 215.83 -60.07
NB23-009 Boundary 67 422058 7010589 1208.67 198.54 -75.41
NB23-010 Boundary 96 422241 7010385 1150.41 212.28 -45.00
NB23-011 Boundary 289 422058 7010589 1208.67 201.59 -75.40
NB23-012 Boundary 452 422289 7010534 1200.90 211.75 -69.90
NB23-013 Boundary 551 422072 7010666 1233.59 214.94 -77.68
NB23-014 Boundary 223 422241 7010384 1150.86 213.68 -70.83
NB23-015 Boundary 339 422241 7010385 1150.41 213.36 -84.00
NB23-016 Boundary 461 422274 7010600 1216. 70 209.88 -72.96
NB23-017 Boundary 96 422279 7010359 1142.67 191.27 -46.90
NB23-018 Boundary 195 422279 7010359 1142.67 190.21 -65.21
NB23-019 Boundary 561 422289 7010534 1200.90 209.95 -81.31
NB23-020 Boundary 414 422465 7010510 1191.44 204.85 -63.35
NB23-021 Boundary 442 422391 7010500 1190.07 201.97 -77.01
NB23-022 Boundary 386 421948 7010672 1232.44 178.85 -74.18
NB23-022D1 Boundary 448 421948 7010672 1232.44 177.78 -74.00
NB23-023 Boundary 181 422449 7010351 1145.42 211.82 -49.18
NB23-024 Boundary 405 422348 7010550 1203.82 199.65 -50.18
NB23-025 Boundary 582 422343 7010620 1219.03 196.94 -74.05
NB23-026 Boundary 111 422449 7010351 1145.42 210.02 -65.44
NB23-027 Boundary 451 422348 7010550 1203.82 197.18 -72.46
NB23-028 Boundary 467 422222 7010587 1209.75 211.38 -65.44
NB23-029 Boundary 630 422124 7010731 1250.31 196.21 -75.67
NB23-029D1 Boundary 690 422124 7010731 1250.31 196.21 -75.67
NB23-030 Boundary 526 422535 7010614 1214.65 211.44 -62.01
NB23-031 Boundary 574 422329 7010671 1235.88 207.69 -69.87
NB23-032 Boundary 493 422165 7010640 1224.09 210.08 -62.01
NB23-033 Boundary 681 422228 7010663 1233.01 211.31 -73.88
NB23-034 Boundary 580 422138 7010674 1237.24 199.07 -72.40
NB23-035 Boundary 552 422228 7010663 1232.97 199.00 -72.02
NB23-036 Boundary 398 422289 7010534 1200.89 212.26 -59.46
NB23-037 Boundary 544 422228 7010663 1232.94 204.73 -66.10
NB23-038 Boundary 427 422001 7010675 1233.60 179.75 -68.10
TS23-001 Tom North 143 441761 7004226 1492.16 075.08 -49.66
TS23-002 Tom North 182 441761 7004226 1492.16 074.97 -80.38
TS23-003 Tom West 299 441676 7004024 1445.00 074.17 -68.51
TS23-004 Tom West 369 441694 7003884 1463.34 067.38 -71.48
TS23-005 Tom West 407 441761 7003770 1510.00 063.25 -75.35
TS23-006 Tom West 137 441779 7004076 1485.36 065.15 -50.08
TS23-007 Tom West 215 441779 7004076 1485.36 065.23 -78.04
TS23-008 Tom West 428 441816 7003717 1538.00 089.53 -88.95
TS23-009 Tom South 749 442363 7003106 1747.29 351.97 -82.00
TS23-009D1 Tom South 748 442363 7003106 1747.29 351.97 -82.00
TS23-009D2 Tom South 821 442363 7003106 1747.29 351.97 -82.00
JS23-001 Jason South 631 436722 7002304 1185.00 228.15 -83.90
JS23-001D1 Jason South 665 436722 7002304 1185.00 228.15 -83.90
BX23-001 Boundary Expl. 219 421752 7010127 1114.70 035.16 -50.19
BX23-002 Boundary Expl. 144 421637 7010243 1137.50 014.78 -49.83
KB23-001 Kobuk 368 418651 7012138 1311.00 006.19 -51.12
KB23-002 Kobuk 284 418754 7011620 1225.00 006.00 -65.24

Coordinates listed in NAD83 UTM Zone 9N.

 

Posted February 1, 2024

Share this news article

MORE or "UNCATEGORIZED"


Ascot Announces Closing of C$34 Million Bought Deal Financing

Ascot Resources Ltd. (TSX: AOT) (OTCQX: AOTVF) is pleased to anno... READ MORE

July 25, 2024

RUA GOLD Closes C$8 Million Brokered Offering and Announces Commencement of Trading on the TSX Venture Exchange

Highlights Closing the fully subscribed brokered offering for C$8... READ MORE

July 25, 2024

Mosaic Acquires 100% of the Amanda Project

Mosaic Minerals Corporation (CSE: MOC) announces that it has sign... READ MORE

July 25, 2024

First Phosphate Confirms Significant High-Quality Igneous Phosphate Deposit at Its Bégin-Lamarche Project in the Saguenay-Lac-St-Jean Region, Quebec au Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is ple... READ MORE

July 25, 2024

PROSPECT RIDGE ANNOUNCES FINAL CLOSING OF ITS OVERSUBSCRIBED PRIVATE PLACEMENT

Prospect Ridge Resources Corp.  (CSE: PRR) (OTC: PRRSF) (FRA: OE... READ MORE

July 25, 2024

Copyright 2024 The Prospector News