The Prospector News

Fireweed Advances Boundary Zone, Intersecting 57.4 m of 8.4% Zinc, 1.8% Lead, and 51.8 g/t Silver, and 49.9 m of 10.1% Zinc, and 14.4 g/t Silver

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Fireweed Advances Boundary Zone, Intersecting 57.4 m of 8.4% Zinc, 1.8% Lead, and 51.8 g/t Silver, and 49.9 m of 10.1% Zinc, and 14.4 g/t Silver

 

 

 

 

 

FIREWEED METALS CORP. (TSX-V: FWZ) (OTCQB: FWEDF) (FSE: M0G) is pleased to report additional assay results from its 2023 exploration at the Macmillan Pass Project, Yukon, Canada.

 

Highlights

  • Boundary Zone delivers multiple near-surface wide, high-grade zones of zinc-lead-silver mineralization in step-out holes within breccia and vein mineralization, as well as stratiform and massive sulphides.
  • Hole NB23-019 intercept is the broadest, high-grade intercept on the eastern side of the stratiform body to date, establishing high-grade continuity over at least 350 m of strike within this zone alone.
  • Hole NB23-019 intersected 57.43 m of 8.42% zinc, 1.77% lead, and 51.8 g/t silver (estimated true width 20 m), including 7.9 m of 16.4% zinc, 5.25% lead, and 150.8 g/t silver, and also including 6.74 m of 15.1% zinc, 2.56% lead, and 44.7 g/t silver. This hole also intersected a separate interval of 54.0 m of 7.05% zinc, and 10.3 g/t silver, including 23.5 m of 10.88% zinc, and 14.6 g/t silver.
  • Hole NB23-023 intersected 76.77 m grading 6.78% zinc, 0.63% lead, and 17.5 g/t silver including 12.20 m of 16.38% zinc, 2.8% lead, and 44.2 g/t silver.
  • Hole NB23-027 intersected 49.9 m grading 10.1% zinc and 14.4 g/t silver including 23.85 m of 13.95% zinc and 20.3 g/t silver.
  • Assays are pending for 24 remaining drillholes from Boundary Zone, 10 holes from the Tom deposit and two holes from the Jason deposit.

 

CEO Statement

 

Brandon Macdonald, CEO, stated, “Our successes continue at Macpass this year, as Boundary Zone impresses us with even more demonstration of the scale and tenor of this large mineralized system. Today’s results highlight the high-grade, near-surface mineralization on the eastern side of Boundary which mostly comprise vein and breccia styles of mineralization. This type of mineralization forms a wide halo, hundreds of metres in width, that surrounds the high-grade laminated to stratiform massive sulphide layer and related feeder zone. We are eagerly awaiting assay results of the remaining drillholes over the coming weeks.”

 

Summary

 

The drill holes in this release primarily comprise near surface mineralization present as veins and breccia (fractured rock infilled by zinc and lead sulphides) on the eastern side of Boundary Zone. This mineralization is broader and more dispersed than the stratiform mineralization deeper and to the west; however, it is generally shallower. Holes NB23-019 and NB23-024 both intersected intervals of vein and breccia mineralization, as well as intersections within the stratiform body. Due to the variable shape of the breccia and vein zones, true widths estimates are not applicable for these intersections as is reported for the stratiform mineralization.

 

Results

 

The drill holes in this news release are located on the eastern side of Boundary Zone and targeted the halo of zinc mineralization around the stratiform layers which occurs as matrix replacement, veining, and breccia fill. Broad intervals of high-grade zinc are present from surface to a depth of 300 m. Both stratiform and massive sulphide mineralization is present in NB23-019—this stratiform intercept is the broadest, high-grade intercept on the eastern side of this body to date, establishing high-grade continuity over at least 350 m of strike within the stratiform zone alone.

 

Table 1: Assay highlights for holes included within this release for the 2023 drilling program, Boundary Zone

 

Drillhole Interval From
(m)
To
(m)
Interval
Width (m)
Est. True
Width (m)
Zinc
(%)
Lead
(%)
Silver
(g/t)
Bulk
Density
(t/m3)
NB23-019 Primary 115.00 169.00 54.00 N/A 7.05 0.04 10.3 3.13
NB23-019 Including 126.65 150.17 23.52 N/A 10.88 0.04 14.6 3.21
NB23-019 Primary 196.00 230.11 34.11 N/A 4.04 0.01 38.3 2.82
NB23-019 Including 213.00 230.11 17.11 N/A 6.37 0.01 15.9 2.85
NB23-019 Primary 310.57 368.00 57.43 20 8.42 1.77 51.8 3.42
NB23-019 Including 311.16 319.06 7.90 3 16.4 5.25 150.8 4.26
NB23-019 including 346.26 353.00 6.74 2 15.1 2.56 44.7 3.65
NB23-020 Primary 100.81 191.30 90.49 N/A 3.68 0.07 7.1 3.13
NB23-020 Including 123.00 128.80 5.80 N/A 8.48 0.03 11.5 3.55
NB23-021 Primary 184.00 202.00 18.00 N/A 13.92 0.03 36.3 3.06
NB23-021 Including 184.00 191.79 7.79 N/A 20.58 0.04 56.3 3.22
NB23-023 Primary* 32.01 108.78 76.77 N/A 6.78 0.63 17.5 3.04
NB23-023 Including 32.01 41.74 9.73 N/A 19.4 0.08 41.8 3.6
NB23-023 Including* 70.50 82.70 12.20 N/A 16.38 2.8 44.2 3.18
NB23-023 >Including* 70.50 73.70 3.20 N/A 43.09 6.93 102 3.93
NB23-024 Primary 130.43 149.25 18.82 N/A 13.51 0.15 20.8 3.17
NB23-024 >Including 141.94 147.92 5.98 N/A 26.87 0.39 45.7 3.55
NB23-024 >>Including 143.16 147.30 4.14 N/A 32.44 0.51 56.8 3.77
NB23-027 Primary 141.70 187.34 45.64 N/A 4.65 0.03 8.0 2.92
NB23-027 Primary 225.70 275.60 49.90 N/A 10.1 0.03 14.4 2.94
NB23-027 Including 228.45 252.30 23.85 N/A 13.95 0.04 20.3 3.12
NB23-027 >Including 245.90 249.90 4.00 N/A 31.61 0.09 49.1 3.46
NB23-027 Including 260.73 267.60 6.87 N/A 12.56 0.02 17.6 2.8
NB23-030 Primary 224.70 277.43 52.73 N/A 3.27 0.01 4.0 2.87
NB23-030 Primary 336.90 386.44 49.54 N/A 2.85 0.01 3.1 2.72

*denotes intervals with recovery of less than 85%. N/A: Not Applicable due to the variable shapes of breccia and vein mineralization.

 

Fireweed continues to successfully intersect pyrite-sphalerite-galena as stratiform massive sulphides, laminated mineralization, veins, and breccias in the 2023 step-outs (Photos 1 to 3). Mineralization has been intersected in every step-out hole that has been completed to depth. Assays have been received for 26 Boundary Zone holes (Tables 1 and 2). Brief summaries of mineralized zones within all other 2023 holes are listed in Table 3.

  • Hole NB23-019 intersected a 57.43 m interval of stratiform massive sulphide grading 8.42% zinc, 1.77% lead, and 51.8 g/t silver with an estimated true width of approximately 20 m. In addition, three other distinct intervals of vein and breccia mineralization were intersected, comprising 54.00 m of 7.05% zinc and 10.3 g/t silver; 34.11 m of 4.04% zinc and 38.3 g/t silver; and 18.47 m of 4.12% zinc and 5.1 g/t silver.
  • NB23-027 intersected 49.90 m of 10.1% zinc, 14.4 g/t silver, including 23.85 m of 13.95% zinc, 20.3 g/t silver; also including 6.87 m of 12.56% zinc and 17.6 g/t silver in vein and breccia style mineralization. This hole also intersected 45.64 m of 4.65% zinc and 8.0 g/t silver.
  • Hole NB23-020 intersected a 90.49 m intersection of breccia and vein sulphide mineralization grading 3.68% zinc and 7.1 g/t silver and a 49.10 m interval of vein mineralization grading 3.98% zinc and 7.1 g/t silver.
  • NB23-021 intersected 49.30 m of 3.58% zinc and 5.4 g/t silver, including 24.72 m of 4.63% zinc and 6.4 g/t silver, as well as a lower 18.00 m interval of 13.92% zinc and 36.3 g/t silver, including 7.79 m of 20.58% zinc and 56.3 g/t silver. Both zones comprise vein and breccia style mineralization.
  • NB23-023 intersected two distinct intervals of vein and breccia mineralization: 76.77 m of 6.78% zinc, 0.63% lead, and 17.5 g/t silver, including 9.73 m at 19.4% zinc, 41.8 g/t silver, as well as 12.20 m of 16.38% zinc, 2.8% lead, and 44.2 g/t silver, including 3.20 m of 43.09% zinc, 6.93% lead, and 102.0 g/t silver.
  • NB23-024 intersected 18.82 m of 13.51% zinc, 0.15% lead, and 20.8 g/t silver, and 34.8 m of 3.88% zinc and 5.3 g/t silver, and 80.72 m of 3.89% zinc, 0.28% lead, and 11.7 g/t silver in vein and breccia mineralization as well as 14.28 m (estimated true width 11 m) of 6.13% zinc, 0.99% lead, and 34.2 g/t silver within stratiform mineralization.
  • NB23-030 intersected 52.73 m of 3.27% zinc and 4.0 g/t silver, as well as 49.54 m of 2.85% zinc and 5.8 g/t silver within vein and breccia mineralization.
  • NB23-025 intersected three zones of mineralization, one 5.37 m of 8.37% zinc and 13.1 g/t silver, a second 6.00 m of 4.05% zinc and 2.8 g/t silver, and a third 7.00 m of 3.3% zinc and 11.3 g/t silver.
  • NB23-026 intersected a 9.49 m interval grading 4.28% zinc and 5.8 g/t silver, as well as a 6.00 m interval grading 2.85% zinc and 20.2 g/t silver in vein and breccia mineralization.
  • NB23-018 intersected a 12.96 m interval grading 1.29% zinc, 0.53% lead, and 17.5 g/t silver, as well as a lower 3.95 m interval grading 1.76% zinc, 8.29% lead, and 96 g/t silver. Both intervals comprise vein and breccia style mineralization.
  • NB23-017 intersected a short interval of massive sulphide just below casing with minor lead and silver mineralization.

 

See Tables 1 to 4, Long Section M–M’, Cross Sections A–A’, H–H’, N–N’, O–O’, P–P’, and Maps 2 and 3 below for further details.

 

Step-out drilling at Boundary Zone targeting the massive–stratiform zone has resulted in the visual identification of many wide intersections of zinc-lead mineralization with assays pending. The most significant intersections can be seen on Long Section M–M’ and are listed here:

  • NB23-022 intersected 55 m of massive sulphide.
  • NB23-028 intersected 140 m of feeder-proximal laminated to massive sulphides.
  • NB23-029D1 intersected 21 m of stratiform massive sulphide.
  • NB23-032 intersected 18 m of stratiform massive sulphide.
  • NB23-034 intersected 49 m of stratiform massive sulphide.
  • NB23-035 intersected 15 m of stratiform massive sulphide.
  • NB23-036 intersected 45 m of stratiform massive sulphide.
  • NB23-037 intersected 110 m of feeder-proximal laminated to massive sulphide.
  • NB23-038 intersected 13 m of stratiform massive sulphide.

 

Out of the 40 holes drilled at Boundary Zone in 2023, 36 were step-out holes that tested the vein mineralization, laminated stratiform mineralization, and massive sulphide zones. The geometry and stratigraphic sequence intersected in these holes continue to support the idea that the laminated and massive sulphide mineralization are part of the same geological layer at Boundary Zone, forming an approximately tabular stratiform zone. Step out drilling down-dip intersected abundant galena, supporting the presence of the conceptual feeder zone. The mineralization in the massive stratiform layer extends from surface to at least 450 m down-dip, over 550 m in strike with a variable true thickness that is shown on Long Section M–M’, thinning around the edges and reaching thicknesses greater than 40 m at its widest point.

 

Extensive vein and breccia mineralization at Boundary Zone occurs both above and below the main stratiform laminated massive sulphide zone. This mineralization forms within a halo approximately 100 to 150 m wide on both sides of the stratiform laminated zone and is interpreted as a stockwork of randomly oriented veins and breccia zones. Many wide intervals of vein and breccia style sphalerite mineralization have been encountered in 2023 step-out holes and four infill holes (Table 3).

 

2023 Drill Program

 

The 2023 program achieved 22,500 m of drilling mostly focused on Boundary, Tom, and Jason zones in addition to five metallurgical drill holes at Mactung (Map 1). Use of directional drilling, in which multiple angled drill holes are initiated at depth from one primary hole, saved an estimated 1,800 m of drilling compared to traditional drilling of multiple new holes from surface for a total equivalent metreage of 24,300 m in 2023, making this Fireweed’s largest ever program and the biggest exploration program in Yukon this year.

 

About Fireweed Metals Corp:

 

Fireweed Metals is a public mineral exploration company on the leading edge of Critical Minerals project development. Fireweed is well-funded, with a healthy balance sheet, and has three projects located in Canada:

  • Macpass Project (Zinc-Lead-Silver): Fireweed owns 100% of the district-scale 940 km2 Macmillan Pass Project in Yukon, Canada, which is host to one of the largest undeveloped zinc resources in the world*. The Tom and Jason zinc-lead-silver deposits have current Mineral Resources1 (11.21 Mt Indicated Resource at 6.59% zinc, 2.48% lead, and 21.33 g/t silver; and 39.47 Mt Inferred Resource at 5.84% zinc, 3.14% lead, and 38.15 g/t silver) and a Preliminary Economic Assessment2 (PEA). In addition, Boundary Zone, Tom North and End Zone have significant zinc-lead-silver mineralization drilled but not yet classified as mineral resources. The Project also includes large blocks of adjacent claims with known showings and significant upside exploration potential.
  • Mactung Project (Tungsten): The Company owns 100% interest in the 37.6 km2 Mactung Project located adjacent to the Macpass Project. Recently announced mineral resources for Mactung (41.5 Mt Indicated Resource at 0.73% WO3 and 12.2 Mt Inferred Resource at 0.59% WO3)3 make it the world’s largest high-grade resource of the Critical Mineral tungsten*. Located in Canada, it is one of the rare large tungsten resources outside of China*.
  • Gayna Project (Zinc-Lead-Gallium-Germanium): Fireweed owns 100% of the 128.75 km2 Gayna Project located 180 km north of the Macpass Project. It is host to extensive mineralization including Critical Minerals zinc, gallium and germanium as well as lead and silver, outlined by 28,000 m of historical drilling. A recent reevaluation of the geology indicates the potential for high-grade Kipushi-style massive sulphide mineralization.

 

Qualified Person Statement

 

Technical information in this news release has been approved by Fireweed’s VP Geology, Dr. Jack Milton, P.Geo. (BC), a ‘Qualified Person’ as defined under Canadian National Instrument 43-101.

 

 

 

Map 1: Macpass Project and Mactung Project locations.

 

 

 

Map 2: Location of 2023 Boundary Zone drillholes, cross sections and long section M–M’. See below for sections.

 

 

 

Map 3: Mineralized intervals in 2023 drilling and pre-2023 drilling defining a stratiform laminated to massive sulphide zone that is connected at depth (purple polygon) and a broader envelope of vein, breccia, and other stratiform zinc mineralization, showing significant areal extent (within green dashed line).

 

 

 

Long Section M–M’ – Estimated true thickness interpretation and selected intersections with zinc grades shown within the laminated to massive sulphide stratiform zone of pyrite-sphalerite-galena mineralization at Boundary Zone including midpoints of holes with assays pending. Halo vein and breccia mineralization is not included in this cross section.

 

 

 

Cross Section A–A’ — Including analytical results for holes NB23-018, NB23-021, and NB23-024.

 

 

 

Cross Section H–H’ — Including analytical results for holes NB23-024 and NB23-027.

 

 

 

Cross Section N–N’ — Including Holes NB23-019 and NB23-025.

 

 

 

Cross Section O–O’ — Including analytical results from Hole NB23-020 and NB23-030

 

 

 

Cross Section P–P’ — Including analytical results from Hole NB23-023 and NB23-026

 

 

 

Photo 1: High resolution core scanning image of stratiform and massive to semi-massive sulphide mineralization in NB23-019 (329.4 m to 338.6 m).

 

 

 

Photo 2: High resolution core scanning image of sphalerite-pyrite-siderite vein mineralization in NB23-027 (227.5 m to 235.9 m).

 

 

Photo 3: High resolution core scanning image of sphalerite-pyrite-galena-siderite breccia mineralization in NB23-020 (353.7 m to 363.4 m).

 

 

Table 2: NB23-017, NB23-018, NB23-019, NB23-020, NB23-021, NB23-024, NB23-025, NB23-026, NB23-027, NB23-030 drill results.

 

Drillhole Interval From
(m)
To
(m)
Interval
Width (m)
Est. True
Width (m)
Zinc
(%)
Lead
(%)
Silver
(g/t)
Bulk
Density
(t/m3)
NB23-017 Entire Hole 0.00 96.00 96.00 N/A 0.01 0.02 1.5 2.79
NB23-018 Entire Hole 0.00 195.00 195.00 N/A 0.51 0.39 7.5 3
NB23-018 Primary 72.40 85.36 12.96 N/A 1.29 0.53 17.5 3.54
NB23-018 Primary 93.93 97.88 3.95 N/A 1.76 8.29 96.0 4.47
NB23-019 Entire Hole 0.00 560.50 560.50 N/A 2.43 0.26 12.6 3.01
NB23-019 Primary 78.91 87.25 8.34 N/A 2.84 0.07 13.0 3.44
NB23-019 Primary 115.00 169.00 54.00 N/A 7.05 0.04 10.3 3.13
NB23-019 Including 121.30 160.30 39.00 N/A 8.45 0.04 12.0 3.21
NB23-019 >Including 126.65 150.17 23.52 N/A 10.88 0.04 14.6 3.21
NB23-019 Primary 196.00 230.11 34.11 N/A 4.04 0.01 38.3 2.82
NB23-019 >Including 213.00 230.11 17.11 N/A 6.37 0.01 15.9 2.85
NB23-019 Primary 244.00 262.47 18.47 N/A 4.12 0.01 5.1 2.72
NB23-019 Primary 310.57 368.00 57.43 20 8.42 1.77 51.8 3.42
NB23-019 Including 310.57 356.86 46.29 16 9.64 2.06 58.7 3.55
NB23-019 >Including 310.57 354.04 43.47 15 10.01 2.02 59.1 3.59
NB23-019 >>Including 311.16 319.06 7.90 3 16.40 5.25 150.8 4.26
NB23-019 >>including 346.26 353.00 6.74 2 15.10 2.56 44.7 3.65
NB23-019 Primary 485.71 488.00 2.29 N/A 21.16 1.49 75.8 3.76
NB23-019 Primary 486.30 488.00 1.70 N/A 25.71 1.89 91.6 3.93
NB23-020 Entire Hole 0.00 414.00 414.00 N/A 1.70 0.1 4.6 3.1
NB23-020 Primary 100.81 191.30 90.49 N/A 3.68 0.07 7.1 3.13
NB23-020 Including 123.00 128.80 5.80 N/A 8.48 0.03 11.5 3.55
NB23-020 Including 172.70 174.82 2.12 N/A 27.77 1.87 71.6 3.45
NB23-020 Primary 327.40 376.50 49.10 N/A 3.98 0.15 7.1 3.49
NB23-020 Including 347.80 358.50 10.70 N/A 8.57 0.07 11.8 3.68
NB23-020 >including 352.85 357.00 4.15 N/A 11.37 0.09 16.6 4.12
NB23-021 Entire Hole 0.00 442.00 442.00 N/A 1.44 0.03 4.3 3.01
NB23-021 Primary 72.31 80.95 8.64 N/A 3.30 0.06 10.8 3.46
NB23-021 Primary 98.70 148.00 49.30 N/A 3.58 0.01 5.4 3.04
NB23-021 Including 115.50 140.22 24.72 N/A 4.63 0.01 6.4 2.98
NB23-021 Primary 184.00 202.00 18.00 N/A 13.92 0.03 36.3 3.06
NB23-021 Including 184.00 191.79 7.79 N/A 20.58 0.04 56.3 3.22
NB23-023 Entire Hole 0.00 181.00 181.00 N/A 3.12 0.36 10.2 2.91
NB23-023 Primary 32.01 108.78 76.77 N/A 6.78 0.63 17.5 3.04
NB23-023 Including 32.01 41.74 9.73 N/A 19.40 0.08 41.8 3.60
NB23-023 >Including 33.00 41.74 8.74 N/A 21.01 0.08 45.2 3.62
NB23-023 Including 70.50 82.70 12.20 N/A 16.38 2.8 44.2 3.18
NB23-023 >Including 70.50 73.70 3.20 N/A 43.09 6.93 102.0 3.93
NB23-024 Entire Hole 0.00 405.00 405.00 N/A 2.48 0.16 7.4 3.01
NB23-024 Primary 111.76 117.76 6.00 N/A 2.85 0.01 3.5 2.84
NB23-024 Primary 130.43 149.25 18.82 N/A 13.51 0.15 20.8 3.17
NB23-024 Including 141.94 147.92 5.98 N/A 26.87 0.39 45.7 3.55
NB23-024 >including 143.16 147.30 4.14 N/A 32.44 0.51 56.8 3.77
NB23-024 Primary 174.00 208.80 34.80 N/A 3.88 0.02 5.3 2.89
NB23-024 Including 174.00 187.58 13.58 N/A 5.82 0.02 7.4 2.84
NB23-024 Primary 232.92 247.20 14.28 11 6.13 0.99 34.2 2.98
NB23-024 >Including 234.95 237.63 2.68 2 14.84 2.15 87.8 3.51
NB23-024 Primary 261.00 341.72 80.72 N/A 3.89 0.28 11.7 3.14
NB23-024 Including 262.98 268.72 5.74 N/A 9.08 0.42 23.3 3.79
NB23-024 Including* 336.26 341.72 5.46 N/A 7.23 2.04 45.5 3.68
NB23-025 Entire Hole 0.00 581.50 581.50 N/A 0.40 0.02 1.7 2.82
NB23-025 Primary 204.00 209.37 5.37 N/A 8.37 0.03 13.1 3.05
NB23-025 Including 205.50 209.37 3.87 N/A 10.84 0.04 16.2 3.06
NB23-025 Primary 531.00 537.00 6.00 N/A 4.05 0.01 2.8 2.73
NB23-025 Primary 555.00 562.00 7.00 N/A 3.30 0.08 11.3 3.46
NB23-026 Entire Hole 0.00 111.00 111.00 N/A 0.91 0.01 2.9 2.74
NB23-026 Primary 83.51 93.00 9.49 N/A 4.28 0.01 5.8 2.89
NB23-026 Primary* 105.00 111.00 6.00 N/A 2.85 0.04 20.2 2.70
NB23-027 Entire Hole 0.00 451.00 451.00 N/A 1.94 0.06 5.2 3.00
NB23-027 Primary 96.80 111.20 14.40 N/A 3.24 0.05 11.3 3.27
NB23-027 Primary 141.70 187.34 45.64 N/A 4.65 0.03 8.0 2.92
NB23-027 Including 161.62 171.12 9.50 N/A 9.24 0.08 15.3 3.19
NB23-027 >Including 162.78 166.12 3.34 N/A 14.75 0.16 27.1 3.64
NB23-027 Including 182.00 185.84 3.84 N/A 11.48 0.02 19.0 2.91
NB23-027 Primary 225.70 275.60 49.90 N/A 10.10 0.03 14.4 2.94
NB23-027 Including 227.95 272.60 44.65 N/A 10.92 0.03 15.6 2.96
NB23-027 Including 228.45 252.30 23.85 N/A 13.95 0.04 20.3 3.12
NB23-027 >Including 245.90 249.90 4.00 N/A 31.61 0.09 49.1 3.46
NB23-027 Including 260.73 267.60 6.87 N/A 12.56 0.02 17.6 2.80
NB23-030 Entire Hole 0.00 526.00 526.00 N/A 0.81 0.01 2.0 2.84
NB23-030 Primary 224.70 277.43 52.73 N/A 3.27 0.01 4.0 2.87
NB23-030 Including 226.16 238.00 11.84 N/A 5.70 0.02 7.4 2.93
NB23-030 Including 269.11 277.43 8.32 N/A 7.04 0.02 5.8 2.91
NB23-030 Primary 336.90 386.44 49.54 N/A 2.85 0.01 3.1 2.72

* Denotes intervals with recovery of less than 85%
† Entire hole intervals contain large continuous sections of very low grade or not mineralized material (below 2% zinc)—intersections of continuous higher-grade material (>2% zinc) are listed as Primary and Included intervals and represent mineralized material.
‡ See “Data Verification” for a description of true width calculations

 

 

Table 3: 2023 Drilling Summary.

 

Drillhole Length (m) Zone Significant Intersection Type
NB23-001 460 Boundary Results disclosed Jul 26 Step Out
NB23-002 351 Boundary Results disclosed Jul 26 Step Out
NB23-003 418 Boundary Results disclosed Jul 26 Step Out
NB23-004 432 Boundary Results disclosed Aug 22 Step Out
NB23-005 234 Boundary Results disclosed Aug 22 Step Out
NB23-006 373 Boundary Results disclosed Aug 22 Step Out
NB23-007 461 Boundary Results disclosed Aug 22 Step Out
NB23-008 385 Boundary Results disclosed Aug 22 Step Out
NB23-009 67 Boundary Hole abandoned and redrilled as NB23-011 Step Out
NB23-010 96 Boundary Results disclosed Oct 24 Step Out
NB23-011 289 Boundary Results disclosed Oct 24 Step Out
NB23-012 452 Boundary Results disclosed Oct 24 Step Out
NB23-013 551 Boundary Results disclosed Oct 24 Step Out
NB23-014 223 Boundary Results disclosed Oct 24 Step Out
NB23-015 339 Boundary Results disclosed Oct 24 Step Out
NB23-016 460 Boundary Results disclosed Oct 24 Step Out
NB23-017 96 Boundary Results disclosed in this release Step Out
NB23-018 195 Boundary Results disclosed in this release Step Out
NB23-019 560 Boundary Results disclosed in this release Step Out
NB23-020 414 Boundary Results disclosed in this release Infill
NB23-021 442 Boundary Results disclosed in this release Infill
NB23-022 386 Boundary Wide Zone Encountered Step Out
NB23-022D1 448 Boundary Narrow Zone Encountered Step Out
NB23-023 181 Boundary Results disclosed in this release Step Out
NB23-024 402 Boundary Results disclosed in this release Infill
NB23-025 580 Boundary Results disclosed in this release Step Out
NB23-026 111 Boundary Narrow Zone Encountered Step Out
NB23-027 396 Boundary Results disclosed in this release Infill
NB23-028 477 Boundary Wide Zone Encountered Step Out
NB23-029 640 Boundary Wide Zone Encountered Step Out
NB23-029D1 689 Boundary Narrow Zone Encountered Step Out
NB23-030 526 Boundary Results disclosed in this release Step Out
NB23-031 574 Boundary Moderate Zone Encountered Step Out
NB23-032 495 Boundary Moderate Zone Encountered Step Out
NB23-033 681 Boundary Narrow Zone Encountered Step Out
NB23-034 580 Boundary Wide Zone Encountered Step Out
NB23-035 552 Boundary Moderate Zone Encountered Step Out
NB23-036 397 Boundary Wide Zone Encountered Step Out
NB23-037 544 Boundary Wide Zone Encountered Step Out
NB23-038 427 Boundary Moderate Zone Encountered Step Out
TS23-001 143 Tom North Minor Mineralization Encountered Step Out
TS23-002 182 Tom North Minor Mineralization Encountered Step Out
TS23-003 299 Tom West Wide Zone Encountered Step Out
TS23-004 369 Tom West Moderate Zone Encountered Step Out
TS23-005 407 Tom West Moderate Zone Encountered Step Out
TS23-006 137 Tom West Moderate Zone Encountered Step Out
TS23-007 215 Tom West Moderate Zone Encountered Step Out
TS23-008 428 Tom West Moderate Zone Encountered Step Out
TS23-009 749 Tom South Wide Zone Encountered Step Out
TS23-009D1 747 Tom South Wide Zone Encountered Redrill
TS23-009D2 821 Tom South Wide Zone Encountered Step Out
JS23-001 631 Jason South Narrow Zone Encountered Step Out
JS23-001D1 665 Jason South Wide Zone Encountered Step Out
BX23-001 219 Boundary South No significant mineralization Exploration
BX23-002 144 Boundary South No significant mineralization Exploration
KB23-001 368 Kobuk No significant mineralization Exploration
KB23-002 284 Kobuk No significant mineralization Exploration

 

 

Table 4: Drill Hole Collar Information

 

Drillhole Zone Length
(m)
Easting Northing Elevation
(m.s.l)
Azimuth
(°)
Dip
(°)
NB23-001 Boundary 460 422297 7010471 1185.86 211.99 -76.42
NB23-002 Boundary 351 422235 7010525 1194.57 214.06 -70.22
NB23-003 Boundary 418 422235 7010525 1194.57 213.40 -78.00
NB23-004 Boundary 432 422171 7010556 1203.00 213.91 -78.08
NB23-005 Boundary 234 422058 7010589 1207.95 199.63 -49.74
NB23-006 Boundary 373 422171 7010556 1203.00 215.44 -70.02
NB23-007 Boundary 461 422058 7010589 1207.95 206.37 -86.43
NB23-008 Boundary 385 422171 7010556 1203.00 215.83 -60.07
NB23-009 Boundary 67 422058 7010589 1208.67 198.54 -75.41
NB23-010 Boundary 96 422241 7010385 1150.41 212.28 -45.00
NB23-011 Boundary 289 422058 7010589 1208.67 201.59 -75.40
NB23-012 Boundary 452 422289 7010534 1200.90 211.75 -69.90
NB23-013 Boundary 551 422072 7010666 1233.59 214.94 -77.68
NB23-014 Boundary 223 422241 7010384 1150.86 213.68 -70.83
NB23-015 Boundary 339 422241 7010385 1150.41 213.36 -84.00
NB23-016 Boundary 461 422274 7010600 1216. 70 209.88 -72.96
NB23-017 Boundary 96 422279 7010359 1142.67 191.27 -46.90
NB23-018 Boundary 195 422279 7010359 1142.67 190.21 -65.21
NB23-019 Boundary 561 422289 7010534 1200.90 209.95 -81.31
NB23-020 Boundary 414 422465 7010510 1191.44 204.85 -63.35
NB23-021 Boundary 442 422391 7010500 1190.07 201.97 -77.01
NB23-022 Boundary 386 421948 7010672 1232.44 178.85 -74.18
NB23-022D1 Boundary 448 421948 7010672 1232.44 177.78 -74.00
NB23-023 Boundary 181 422449 7010351 1145.42 211.82 -49.18
NB23-024 Boundary 405 422348 7010550 1203.82 199.65 -50.18
NB23-025 Boundary 582 422343 7010620 1219.03 196.94 -74.05
NB23-026 Boundary 111 422449 7010351 1145.42 210.02 -65.44
NB23-027 Boundary 451 422348 7010550 1203.82 197.18 -72.46
NB23-028 Boundary 467 422222 7010587 1209.75 211.38 -65.44
NB23-029 Boundary 630 422124 7010731 1250.31 196.21 -75.67
NB23-029D1 Boundary 690 422124 7010731 1250.31 196.21 -75.67
NB23-030 Boundary 526 422535 7010614 1214.65 211.44 -62.01
NB23-031 Boundary 574 422329 7010671 1235.88 207.69 -69.87
NB23-032 Boundary 493 422165 7010640 1224.09 210.08 -62.01
NB23-033 Boundary 681 422228 7010663 1233.01 211.31 -73.88
NB23-034 Boundary 580 422138 7010674 1237.24 199.07 -72.40
NB23-035 Boundary 552 422228 7010663 1232.97 199.00 -72.02
NB23-036 Boundary 398 422289 7010534 1200.89 212.26 -59.46
NB23-037 Boundary 544 422228 7010663 1232.94 204.73 -66.10
NB23-038 Boundary 427 422001 7010675 1233.60 179.75 -68.10
TS23-001 Tom North 143 441761 7004226 1492.16 075.08 -49.66
TS23-002 Tom North 182 441761 7004226 1492.16 074.97 -80.38
TS23-003 Tom West 299 441676 7004024 1445.00 074.17 -68.51
TS23-004 Tom West 369 441694 7003884 1463.34 067.38 -71.48
TS23-005 Tom West 407 441761 7003770 1510.00 063.25 -75.35
TS23-006 Tom West 137 441779 7004076 1485.36 065.15 -50.08
TS23-007 Tom West 215 441779 7004076 1485.36 065.23 -78.04
TS23-008 Tom West 428 441816 7003717 1538.00 089.53 -88.95
TS23-009 Tom South 749 442363 7003106 1747.29 351.97 -82.00
TS23-009D1 Tom South 748 442363 7003106 1747.29 351.97 -82.00
TS23-009D2 Tom South 821 442363 7003106 1747.29 351.97 -82.00
JS23-001 Jason South 631 436722 7002304 1185.00 228.15 -83.90
JS23-001D1 Jason South 665 436722 7002304 1185.00 228.15 -83.90
BX23-001 Boundary Expl. 219 421752 7010127 1114.70 035.16 -50.19
BX23-002 Boundary Expl. 144 421637 7010243 1137.50 014.78 -49.83
KB23-001 Kobuk 368 418651 7012138 1311.00 006.19 -51.12
KB23-002 Kobuk 284 418754 7011620 1225.00 006.00 -65.24

Coordinates listed in NAD83 UTM Zone 9N.

 

Posted November 30, 2023

Share this news article

MORE or "UNCATEGORIZED"


Koryx Copper Intersects 338.61 Meters At 0.38% Cu Eq Including 230.61 Meters At 0.45% Cu Eq and Multiple 2 Meters Intersections Over 1.00% Cu Eq

Significant copper and molybdenum intersections include: HM09: 13... READ MORE

May 15, 2024

Aya Gold & Silver Reports Q1-2024 Results; Maintains Guidance; Zgounder Expansion on Track

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

May 15, 2024

Silver Mountain Delivers Positive Preliminary Economic Assessment For Its Reliquias Project, Peru; Pre-Tax NPV 5% Of C$107 million, Pre-Tax IRR Of 57%, And Payback Of 1.8 Years

Key Highlights – Preliminary Economic Assessment Pre-Tax Net Pr... READ MORE

May 15, 2024

ARIS MINING REPORTS Q1 2024 RESULTS WITH SEGOVIA GENERATING $13.8 MILLION IN OPERATING CASH FLOW

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its ... READ MORE

May 15, 2024

Orla Mining Reports First Quarter 2024 Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

May 15, 2024

Copyright 2024 The Prospector News