The Prospector News

Federal clean energy initiatives will help advance Small Modular Nuclear Reactors and other clean technologies

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Federal clean energy initiatives will help advance Small Modular Nuclear Reactors and other clean technologies

 

 

 

 

 

Ontario Power Generation welcomes the latest clean energy initiatives by the Federal Government outlined in the Fall Economic Statement, including the proposed investment tax credit that would benefit Small Modular Reactors and other forms of clean energy technology including hydroelectric, hydrogen, and pumped storage. OPG also welcomes the commitment to improve the efficiency of federal environmental Impact Assessments Act.

 

OPG and its subsidiaries are leading the development of SMRs, examining new hydroelectric potential, working to electrify the transportation sector, advancing the development of hydrogen and exploring pumped hydro storage. OPG’s Darlington Nuclear refurbishment will also provide decades of additional GHG-free power, as would the possible redevelopment of the Pickering B Nuclear Generating Station, the feasibility of which is currently being explored.

 

Recently, the Canada Infrastructure Bank announced a loan of $970M to develop the first commercial SMR at OPG’s Darlington site.  SMRs are a new class of nuclear reactors that are approximately 300 megawatts or less, have a smaller footprint and a shorter construction schedule, compared to traditional nuclear generating stations, and can provide zero-carbon baseload power across all regions.

 

Quotes

 

“These measures will help ensure this critical infrastructure is successfully completed, while reducing costs for ratepayers,” said OPG President and CEO, Ken Hartwick. “The powerful combination of Federal and Provincial government support sends a resounding message that Ontario and Canada are ready to lead the world in clean energy development.”

 

Quick Facts

  • OPG owns and operates 66 hydroelectric stations and 241 dams, which account for nearly 21 per cent of Ontario’s total generation.
  • A 2020 Conference Board of Canada study highlights strong economic benefits from construction and 60 years of operation of a single SMR facility. This includes average annual direct and indirect employment of approximately:
    • 700 jobs during project development;
    • 1,600 jobs during manufacturing and construction;
    • 200 jobs during operations; and
    • 160 jobs during decommissioning.
  • OPG’sPowerOn subsidiary is PowerON Energy Solutions is working with the TTC and Toronto Hydro to electrify more than 2,400 TTC buses – North America’s largest transit electrification project to date.

 

 

 

Posted November 4, 2022

Share this news article

MORE or "UNCATEGORIZED"


NIOB Intersects 211+ Metres of Cumulative Pegmatite with Encouraging Nb-REE Exploration Indicators at Seigneurie; Assays Pending

North American Niobium and Critical Minerals Corp. (CSE: NIOB) (FSE: KS82.F) (OTCQB: NIOMF) has dril... READ MORE

April 29, 2026

Guanajuato Silver Announces Year-End and Q4 2025 Results

Guanajuato Silver Company Ltd. (TSX-V:GSVR)(OTCQX:GSVRF) is pleased to announce financial informatio... READ MORE

April 29, 2026

Trident Intersects 15.11 g/t Au over 51.83m from 256.0m in the BK3 Zone at the Contact Lake Gold Project, Saskatchewan

Trident Resources Corp. (TSX-V: ROCK) (OTCQB: TRDTF) (Frankfurt: 6BP0) is pleased to announce assay... READ MORE

April 29, 2026

West Point Gold Intersects 18.3m of 6.05 g/t Au and 35.1m of 2.23 g/t Au, Expanding the High-Grade Northeast Tyro Zone to over 400m of Strike Length and to 300m Depth

West Point Gold Corp. (TSX-V: WPG) (OTCQB: WPGCF) (FSE: LRA0) is pleased to announce step-out... READ MORE

April 29, 2026

First Quantum Minerals Reports First Quarter 2026 Results

First Quantum Minerals Ltd. (TSX: FM) today reports results for the three months ended March ... READ MORE

April 29, 2026

Copyright 2026 The Prospector News