The Prospector News

ESGold Expands Historic Mine Waste Reclamation Strategy With Second MOU, Bringing Total Proposed Annual Aggregate Supply to 500,000 Tonnes

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

ESGold Expands Historic Mine Waste Reclamation Strategy With Second MOU, Bringing Total Proposed Annual Aggregate Supply to 500,000 Tonnes

ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) is pleased to announce that it has signed a second Memorandum of Understanding, this time with Gestion D.S. 50 Inc., a Québec-based company, for the potential supply and beneficial reuse of up to 200,000 metric tonnes annually of neutralized mining residue from ESGold‘s fully permitted Montauban Gold-Silver Project in Québec.

This MOU follows the Company’s October 29, 2026 announcement regarding an MOU with Culture H. Dolbec Inc. for up to 300,000 metric tonnes annually. Together, these two MOU’s represent a combined supply potential of up to 500,000 metric tonnes of aggregate annually, marking another important milestone in ESGold‘s strategy to transform historic mine waste into commercially valuable construction material.

With the Montauban Project currently permitted to process up to 300,000 tonnes of historic tailings annually, which can be increased with the requisite permits, the combined proposed volumes from the MOU’s demonstrate commercial interest beyond the Project’s initial processing capacity and reinforces the potential for longer-term growth.

 

Building Momentum in Historic Mine Waste Reclamation

For more than a century, historic mining activities at Montauban have left behind substantial quantities of mine tailings stored at surface, creating a longstanding environmental legacy for the surrounding region.

ESGold‘s planned processing operation aims to address this challenge by recovering remaining precious metals from the historic tailings while treating, neutralizing and stabilizing the residual material. Through these two MOUs, the Company is establishing potential pathways for converting treated historic mining waste into aggregate suitable for approved construction applications, subject to testing and meeting regulatory standards.

By pursuing commercial opportunities for the material remaining after precious metal recovery, ESGold is working toward a model that combines economic development with environmental restoration, potentially reducing the need for permanent waste storage while creating additional value for shareholders.

Gordon Robb, Chief Executive Officer and Director of ESGold, commented:

“Building on our October 29th announcement, we are pleased to have secured a second MOU, bringing our combined potential annual aggregate supply to 500,000 tonnes. This is an exciting development for Montauban and reinforces our belief that the Project represents much more than a gold and silver recovery project. We are building a model that seeks to address a century-old environmental legacy issue while creating new economic opportunities. Seeing this level of regional interest in repurposing our treated material is an encouraging step toward realizing that vision.”

Both MOUs are non-binding and represent the parties’ current intentions. Proposed annual volumes are indicative maximums and do not constitute guaranteed deliveries, purchases or minimum commitments. Any future supply remains subject to material characterization, environmental testing, applicable regulatory approvals and execution of definitive agreements by the parties. Pricing and other commercial terms have not yet been established under the MOU’s.

 

About ESGold Corp.

ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) is a fully permitted, fully funded, pre-production mining company advancing a scalable clean mining model across North America. The Company’s flagship Montauban Gold-Silver Project in Québec is under construction. With a dual-track strategy focused on advancing toward near-term gold and silver production while systematically evaluating district-scale exploration potential, ESGold is building a foundation for sustainable growth and long-term shareholder value.

For more information, please contact ESGold Corp. at 1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information on the Company please contact:

Email: ir@esgold.com or info@esgold.com or gordon@esgold.com

Phone: 604-885-1348 or 1-888-370-1059 or 250-217-2321

On behalf of the Board of Directors of ESGold Corp.

Gordon Robb
Chief Executive Officer & Director

Posted November 3, 2026

Share this news article

MORE or "UNCATEGORIZED"


Fury Intersects 3.88 g/t Gold over 17.8 Metres, including 18.78 g/t Au over 3.30 m, at Three Bluffs, Returning Wide Mineralized Intervals in All Five Holes

Fury Gold Mines Limited (TSX: FURY) (NYSE American: FURY) is pleased to announce first assay results... READ MORE

November 3, 2026

Ero Copper Reports Record Third Quarter 2026 Results

Ero Copper Corp. (TSX: ERO) (NYSE: ERO) is pleased to announce its operating and financial results ... READ MORE

November 3, 2026

Wesdome Expands High-Grade Zones at Eagle River, Highlighting Growth Potential near Existing Infrastructure

Wesdome Gold Mines Ltd. (TSX: WDO) (OTCQX: WDOFF) today provides an update on its exploration and i... READ MORE

November 3, 2026

Osisko Intersects 314 Metres Averaging 0.44% Cu at Gaspé

Osisko Metals Incorporated (TSX: OM) (OTCQX: OMZNF) (FRANKFURT:0B51) is pleased to announce new ana... READ MORE

November 3, 2026

Kirkland Lake Discoveries Intersects 10.53 g/t Au over 9.20 M in Step-Out Drilling at Mirado West

Kirkland Lake Discoveries Corp. (TSX-V: KLDC) (OTCQB: KLKLF) is pleased to announce new diamond dri... READ MORE

November 3, 2026

Copyright 2026 The Prospector News