The Prospector News

Equinox Gold’s Castle Mountain Accepted into FAST-41 Permitting Program

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Equinox Gold’s Castle Mountain Accepted into FAST-41 Permitting Program

 

 

 

 

 

Equinox Gold Corp. (TSX: EQX) (NYSE: EQX) is pleased to announce that its Castle Mountain Mine Phase Two Project in California has been accepted into the United States Federal Permitting Improvement Steering Council’s FAST-41 program. FAST-41 is a federal permitting framework designed to streamline environmental reviews, improve interagency coordination, and increase transparency. Acceptance into the program is expected to enhance regulatory certainty through a defined permitting schedule that may reflect reduced permitting timelines. Based on the permitting timeline posted to the FAST-41 project dashboard (see link) on August 8, 2025 the federal permitting process should be completed in December 2026.

 

Darren Hall, CEO of Equinox Gold, stated: “Castle Mountain is a high-quality growth opportunity for Equinox Gold in a tier-one jurisdiction. Based on the March 2021 Feasibility Study, the project is expected to produce approximately 200,000 ounces of gold annually over a 14-year mine life, totaling 3.2 million ounces. With FAST-41 permitting status in place we’ve initiated study updates and project optimization to align with the permitting timeline and position the project for a timely construction decision. Once in production Castle Mountain will be a cornerstone asset, reinforcing our strategy of building a portfolio of long-life, low-cost mines in top-tier jurisdictions.”

 

Castle Mountain is located in San Bernardino County, California, approximately 200 miles north of Equinox Gold’s Mesquite Mine. Equinox Gold acquired Castle Mountain in December 2017 and operated a small open-pit heap leach gold mine from Q4 2020 to Q3 2024. The mine is currently performing re-leaching procedures while the Company advances permitting, engineering and optimization work. While the project is expected to operate within the existing approved mine boundary, the changes to previously analyzed effects, such as increased land disturbance within the mine boundary and increased water use, require modification to the Company’s approved Mine and Reclamation Plan and an updated Environmental Impact Statement / Environmental Impact Report.

 

The technical information contained in this news release was approved by David Schonfeldt, P. Geo., VP Mining Geology for Equinox Gold and a “Qualified Person” under National Instrument 43-101.

 

About Equinox Gold

 

Equinox Gold is a Canadian mining company positioned for growth with a strong foundation of high-quality, long-life gold operations in Canada and across the Americas, and a pipeline of development and expansion projects. Founded and chaired by renowned mining entrepreneur Ross Beaty and guided by a seasoned leadership team with broad expertise, the Company is focused on disciplined execution, operational excellence and long-term value creation. Equinox Gold offers investors meaningful exposure to gold with a diversified portfolio and clear path to growth.

 

Posted August 11, 2025

Share this news article

MORE or "UNCATEGORIZED"


Hudbay Provides Annual Reserve and Resource Update with Mine Life Extensions and Improved Three-Year Production Outlook

Hudbay Minerals Inc. (TSX:HBM) (NYSE: HBM) today released its ann... READ MORE

March 27, 2026

OREZONE GOLD COMPLETES STRATEGIC ACQUISITION OF CASA BERARDI GOLD MINE AND QUEBEC EXPLORATION PORTFOLIO AND REPORTS FOURTH QUARTER 2025 RESULTS

Strategic acquisition of an established operating gold mine, loca... READ MORE

March 27, 2026

Cerro de Pasco Resources Secures Access Agreement Over Entire Quiulacocha Tailings Area, Enabling Next Phase of Project Development

Cerro de Pasco Resources Inc. (TSX-V: CDPR) (OTCQB: GPPRF) (FRA: ... READ MORE

March 26, 2026

SAGA Metals Acquires Strategic Titanium Assets from Rio Tinto in Quebec

The Garneau Titanium Project Features Ilmenite-Rich Boulder with ... READ MORE

March 26, 2026

ValOre Reports Positive Leaching Results from Ongoing Metallurgical Program for Pedra Branca PGM Project, Brazil; 73% Platinum and 74% Palladium Achieved Extraction from Weathered Material and 66% Platinum and 79% Palladium from Chromitite;

ValOre Metals Corp. (TSX‐V: VO) (OTCQB: KVLQF) (Frankfurt: KEQ0... READ MORE

March 26, 2026

Copyright 2026 The Prospector News